Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Allerton

2420 Bronx Park East, Bronx

10467 · 66 apartments · 6 stories · City Council district 15

By · Updated · Data from NYC HPD

C
23open immediately hazardous violations · 35 per 100 apartments
B42Hazardous, open
A36Non-hazardous, open
!86Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Who owns and manages it

Owning companyBPS 2420 REALTY, LLC
Landlord (head officer or owner)Victor Fein

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    24
  2. Broken doors or locks
    19
  3. Other repairs
    13
  4. Mold
    12
  5. Roaches
    10
  6. Leaks and water damage
    9
  7. Mice or rats
    6
  8. Missing smoke or CO detector
    3
  9. Lead paint
    3
  10. Electrical problems
    1
  11. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 80 closed · NYC typical: 87 days
B114 days
from 119 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsRepair the broken or defective connection at steam riser in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19366302
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at northIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19366304
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347223
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347224
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347222
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, west and south walls in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19313486
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of consisting of plexi glass installed at building entrance door at public hall, 1st storyIssued Oct 22, 2026 · fix by Oct 28, 2026 overdue · Violation #19313488
  • B
    Broken doors or locksProvide approved glass pane at building entrance door at public hall, 1st storyIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19313489
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19313487
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19180190
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165664
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and north wall in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165663
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, south, and east wall in the private hallwayIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165662
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19102576
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 26, 2026 · fix by Jul 2, 2026 overdue · Violation #19030915
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19028521
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19015592
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 17, 2026 · fix by May 11, 2026 overdue · Violation #18800412
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 17, 2026 · fix by May 11, 2026 overdue · Violation #18800410
  • C
    Lead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued Apr 9, 2026 · fix by May 3, 2026 overdue · Violation #18777669
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall, east wall, ceiling in the kitchenIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18768127
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18768137
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the bathroomIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18768133
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18768132
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18768126
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 26, 2026 · fix by Apr 21, 2026 overdue · Violation #18736866
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18568107
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft on north wall and window casing in the 4th room from eastIssued Jul 29, 2025 · fix by Sep 2, 2025 overdue · Violation #18114969
  • B
    Other repairsProperly repair with similar material the broken or defective wooden decorative lintel at west exterior wall building front , 5th story, section ''south''Issued Jul 22, 2025 · fix by Aug 26, 2025 overdue · Violation #18108781
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at south wall in the bathroomIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17897200
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 5, 2025 · fix by May 31, 2025 overdue · Violation #17868902
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling at ceiling and east and south wall (less than 10sq ft) in the bathroomIssued Apr 1, 2025 · fix by May 6, 2025 overdue · Violation #17801644
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at the ceiling, east and south walls in the bathroomIssued Apr 1, 2025 · fix by May 6, 2025 overdue · Violation #17801617
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 30, 2024 · fix by Jan 13, 2025 overdue · Violation #17581456
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 1, 2024 · fix by Apr 27, 2024 overdue · Violation #16788861
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at door in the entranceIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16551688
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective reglazing by method of porcelin enamel finish at bathtub in the bathroomIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16551684
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 18, 2023 · fix by Sep 13, 2023 overdue · Violation #16166708
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2023 · fix by Sep 13, 2023 overdue · Violation #16166707
  • B
    MoldTrace and repair the source and abate the visible mold condition south wall and ceiling in the bathroomIssued Aug 18, 2023 · fix by Sep 22, 2023 overdue · Violation #16166703
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor north section at public hall, 2nd storyIssued Aug 17, 2023 · fix by Sep 21, 2023 overdue · Violation #16164689
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective fire door at public hall, 4th storyIssued Jun 26, 2023 · fix by Jul 10, 2023 overdue · Violation #16059114
  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall around medicine cabinet 1 sq ft in the bathroomIssued Jan 11, 2022 · fix by Feb 15, 2022 overdue · Violation #14776681
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2021 · fix by Nov 15, 2021 overdue · Violation #14624428
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2021 · fix by Oct 20, 2021 overdue · Violation #14575237
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 24, 2021 · fix by Oct 20, 2021 overdue · Violation #14575238
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). which is defective in the entire apartmentIssued Sep 13, 2021 · fix by Oct 18, 2021 overdue · Violation #14554395
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14554392
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector which is defective in the entire apartmentIssued Sep 13, 2021 · fix by Oct 18, 2021 overdue · Violation #14554394
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 13, 2021 · fix by Oct 9, 2021 overdue · Violation #14554391
  • B
    Other repairsProperly repair with similar material the broken or defective cvt tile flooring by radiator pipes in the 2nd room from eastIssued Sep 13, 2021 · fix by Oct 18, 2021 overdue · Violation #14554390
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling by heat riser in the bathroomIssued Sep 13, 2021 · fix by Oct 18, 2021 overdue · Violation #14554389
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 2 sq ft at door frame from south at west wall in the bathroomIssued Jul 6, 2021 · fix by Aug 10, 2021 overdue · Violation #14424217
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor under the radiator at south in the 1st room from eastIssued Jul 2, 2021 · fix by Aug 6, 2021 overdue · Violation #14419196
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 2, 2021 · fix by Jul 28, 2021 overdue · Violation #14419198
  • B
    MoldTrace and repair the source and abate the visible mold condition aprox. 8 sq. ft. at ceiling aprox. 8 sq. ft. at east wall in the bathroomIssued Jul 2, 2021 · fix by Aug 6, 2021 overdue · Violation #14419212
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jul 2, 2021 · fix by Aug 6, 2021 overdue · Violation #14419200
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 25, 2021 · fix by Jul 21, 2021 overdue · Violation #14402217
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 18, 2019 · fix by Dec 9, 2019 overdue · Violation #13456480
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 18, 2019 · fix by Dec 9, 2019 overdue · Violation #13456481

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

412017
812018
962019
92020
372021
142022
522023
632024
812025
1062026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 760 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.