Housing violations · Pelham Bay-Country Club-City Island
3565 Bruckner Boulevard, Bronx
10461 · 49 apartments · 6 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster20
- Lead paint11
- Mice or rats5
- Other repairs5
- Mold3
- Roaches3
- Broken doors or locks2
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 106 closed · NYC typical: 87 days
from 99 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and west wall in the bathroomIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19376523
- BMoldTrace and repair the source and abate the visible mold condition observed greater than 15 sq ft at west wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19370935
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19310740
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19310741
- BOther repairsProperly repair with similar material the broken or defective ceramic tiled floor in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19310745
- CBroken doors or locksProperly repair or replace the broken or defective gasket seal at lower refrigerator door in the kitchenIssued Aug 4, 2026 · fix by Aug 10, 2026 overdue · Violation #19110637
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073366
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073367
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #19003874
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18997795
- BOther repairsProperly repair with similar material the broken or defective rubber gasket at refrigerator in the kitchenIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18931652
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18759126
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18580821
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2025 · fix by Oct 4, 2025 overdue · Violation #18211622
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued May 9, 2025 · fix by Jun 13, 2025 overdue · Violation #17879209
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the private hallwayIssued May 9, 2025 · fix by Jun 13, 2025 overdue · Violation #17879211
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from northIssued May 9, 2025 · fix by Jun 13, 2025 overdue · Violation #17879205
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 7, 2025 · fix by May 1, 2025 overdue · Violation #17816295
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from eastIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17396562
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls ans ceiling in the private hallwayIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17396561
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 10, 2024 · fix by May 4, 2024 overdue · Violation #16848813
- BOther repairsProperly repair with similar material the broken or defective ceramic tile floor in the kitchenIssued Apr 5, 2024 · fix by May 10, 2024 overdue · Violation #16794865
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from eastIssued Jan 5, 2024 · fix by Feb 9, 2024 overdue · Violation #16564885
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Jan 5, 2024 · fix by Feb 9, 2024 overdue · Violation #16564884
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 31, 2023 · fix by Jun 24, 2023 overdue · Violation #16018841
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued May 15, 2023 · fix by Jun 8, 2023 overdue · Violation #15984768
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 12, 2023 · fix by Jun 5, 2023 overdue · Violation #15979226
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued May 12, 2023 · fix by Jun 16, 2023 overdue · Violation #15978352
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 12, 2023 · fix by Jun 5, 2023 overdue · Violation #15979225
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 12, 2023 · fix by Jun 5, 2023 overdue · Violation #15979227
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 12, 2023 · fix by Jun 5, 2023 overdue · Violation #15979259
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued May 12, 2023 · fix by Jun 5, 2023 overdue · Violation #15979260
- CMoldTrace and repair the source and abate the visible mold condition mold and mildew at walls and ceiling throughout in the bathroomIssued Jul 5, 2022 · fix by Jul 31, 2022 overdue · Violation #15232160
- CLead paint- certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead…Issued May 6, 2022 · fix by May 30, 2022 overdue · Violation #15147744
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 5, 2022 · fix by May 29, 2022 overdue · Violation #15146493
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.