Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Kew Gardens

83-46 118 Street, Queens

11415 · 84 apartments · 6 stories · City Council district 29

By · Updated · Data from NYC HPD

C
16open immediately hazardous violations · 19 per 100 apartments
B65Hazardous, open
A29Non-hazardous, open
!104Past the fix-by date

On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building is about the same.

Open in Google Maps ↗

Who owns and manages it

Owning companyCLIPPER REALTY ASSOC.,LLC
Landlord (head officer or owner)Adam Parkoff

As registered with HPD.

What the city has done here

When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.

2Repairs the city did itself
$2,470Billed to the owner for them
0Court cases HPD brought
0Cases tenants brought

Latest city repairs

  • $
    General repairs · $320Missing window guardsSep 16, 2025 · Details
  • $
    General repairs · $2,150Broken doors or locksJul 17, 2025 · Details

Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.

Open problems

All open violations in the building, by type.

  1. Other repairs
    34
  2. Peeling paint and plaster
    32
  3. Broken doors or locks
    15
  4. Mice or rats
    9
  5. Plumbing, sinks and toilets
    5
  6. Roaches
    4
  7. Missing smoke or CO detector
    4
  8. Leaks and water damage
    3
  9. Electrical problems
    3
  10. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C79 days
from 20 closed · NYC typical: 84 days
B88 days
from 36 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective north and west wall at bulkhead. , 6th storyIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333078
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at lobby, 1st storyIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333080
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling. at public hall, 6th storyIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333076
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at hopper door inside compactor closet at public hall, 1st story, section ''a-g'',…Issued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19318006
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153159
  • B
    Other repairsProperly repair or replace the broken or defective grout around bathub in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153164
  • B
    Other repairsProperly repair with similar material the broken or defective loose ceramic floor tiles in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153166
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153169
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153171
  • B
    Other repairsReplace with new the missing eschutcheon plate at heat riser at ceiling in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153156
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19153179
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153176
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153173
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153174
  • B
    Other repairsProperly repair or replace the broken or defective latch assembly device in the entranceIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072826
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch assembly device at compactor door at public hall, 5th story, section at northIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072828
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch assembly device at compactor door at public hall, 5th story, section at southIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19072797
  • B
    Other repairsProperly repair with similar material the broken or defective east and south walls at lobbyIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18943391
  • B
    Other repairsProperly repair with similar material the broken or defective ceiling at lobbyIssued May 21, 2026 · fix by Jun 25, 2026 overdue · Violation #18943389
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 20, 2026 · fix by Jun 15, 2026 overdue · Violation #18941736
  • B
    Other repairsProperly repair with similar material the broken or defective ceiling at lobbyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18941740
  • B
    Other repairsProperly repair with similar material the broken or defective north and east walls at lobbyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18941742
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 20, 2026 · fix by Jun 15, 2026 overdue · Violation #18941737
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 16, 2026 · fix by May 12, 2026 overdue · Violation #18790053
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 16, 2026 · fix by May 12, 2026 overdue · Violation #18790052
  • B
    Other repairsRefit lower sash window at south wall in the bathroomIssued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18618766
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the foyerIssued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18618776
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18618777
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18618778
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 5, 2026 · fix by Mar 3, 2026 overdue · Violation #18618774
  • B
    Other repairsRefit upper sash window at 1 window from east at south wall in the 2nd room from eastIssued Feb 5, 2026 · fix by Mar 12, 2026 overdue · Violation #18618782
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 15, 2025 · fix by Sep 10, 2025 overdue · Violation #18159922
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door at compactor closet, 4th storyIssued Jul 9, 2025 · fix by Jul 23, 2025 overdue · Violation #18076377
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hopper door hinges inside compactor closet at public hall, 4th story, section ''a-g'', at…Issued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18068150
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door and frame at compactor closet at public hall, 4th story, section ''a-g'', at northIssued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18068148
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at 1st window from east at south in the 2nd room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011735
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall, and north wall in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011711
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011710
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock set at entrance door in the 1st room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011741
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011738
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock set at 1st closet door from west at north in the 1st room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011739
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at 2nd window from east at south in the 2nd room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011736
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock set at 2nd closet door from west at north in the 1st room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011740
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011737
  • B
    Broken doors or locksRefit wood entrance door in the 1st room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011714
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, west all, south wall, and ceiling in the 2nd room from eastIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011715
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011716
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011717
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011718
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011719
  • B
    Lead paintProperly secure the loose wood threshold leading to room e2 in the foyerIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011720
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 16, 2025 · fix by Jul 12, 2025 overdue · Violation #18011721
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 16, 2025 · fix by Jul 12, 2025 overdue · Violation #18011722
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011723
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011724
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011726
  • B
    Other repairsRefit window at south wall in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011727
  • B
    Other repairsProperly repair with similar material the broken or defective grout at ceramic floor tiles in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011728
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood countertop at sink in the kitchenetteIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011731
  • B
    Broken doors or locksRefit wood entrance door in the bathroomIssued Jun 16, 2025 · fix by Jul 21, 2025 overdue · Violation #18011729

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

42017
92018
12019
12023
102024
1052025
592026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 189 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 19, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.