Housing violations · Crotona Park East
1700 Bryant Avenue, Bronx
10460 · 52 apartments · 6 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster7
- Broken doors or locks6
- Mold5
- Other repairs4
- Missing smoke or CO detector4
- Mice or rats3
- Leaks and water damage3
- Plumbing, sinks and toilets1
- Roaches1
- Lead paint1
- Bedbugs1
- Electrical problems1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 11 closed · NYC typical: 87 days
from 4 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at fire door on south wall , 1st storyIssued Nov 13, 2026 · fix by Nov 27, 2026 · Violation #19369719
- CBroken doors or locksRemove device preventing door from being self-closing kick down door stopper intalled at fire door on south wall , 1st storyIssued Nov 13, 2026 · fix by Nov 27, 2026 · Violation #19369718
- BPlumbing, sinks and toiletsRepair the broken or defective connection in wasteline at wash basin in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19348820
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at refrigerator door in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19348819
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19213023
- CLead paintRemove device preventing door from being self-closing permanent device (hook)installed at building fire exit door leading from public hall to south yard at…Issued Sep 14, 2026 · fix by Sep 28, 2026 overdue · Violation #19213025
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19213024
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18779940
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18779945
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 13, 2026 · fix by May 9, 2026 overdue · Violation #18779942
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18779941
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 13, 2026 · fix by May 18, 2026 overdue · Violation #18779944
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at ceiling and west wall in the foyerIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18597733
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at west and north wall at 1st closet from south at west in the foyerIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18597732
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at ceiling in the kitchenIssued Jan 23, 2026 · fix by Feb 27, 2026 overdue · Violation #18597731
- BBroken doors or locksProperly repair or replace the broken or defective latch and assemblys at hopper door at north wall at refuse room at public hall, 4th storyIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18426852
- BOther repairsReplace with new the missing ceramic tiles at south wall approximately 16sqft in the kitchenIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18426845
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18426844
- BElectrical problemsProperly repair or replace the broken or defective 1st electrical outlet from north at east wall in the kitchenIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18426841
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 24, 2025 · fix by Nov 30, 2025 overdue · Violation #18426849
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 24, 2025 · fix by Nov 24, 2025 overdue · rent impairing · Violation #18426847
- BBroken doors or locksProperly repair with similar material the broken or defective warpped wood 1st, 2nd, 3rd, and 4th cabinet door at upper wall cabinet at east wall in the kitchenIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18426846
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18426842
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18249133
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18249137
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling and behind west wall in the foyerIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18249140
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18249136
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling west wall in the foyerIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18249135
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at north wall in the bathroomIssued Jun 3, 2025 · fix by Jul 8, 2025 overdue · Violation #17942885
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Feb 6, 2024 · fix by Mar 12, 2024 overdue · Violation #16654219
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Feb 6, 2024 · fix by Mar 12, 2024 overdue · Violation #16654221
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.