Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Belmont

2476 Cambreleng Avenue, Bronx

10458 · 17 apartments · 4 stories · City Council district 15

By · Updated · Data from NYC HPD

C
121open immediately hazardous violations · 712 per 100 apartments
B172Hazardous, open
A49Non-hazardous, open
!327Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

17 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyFordham Portfolio I LLC
Landlord (head officer or owner)David Manheimer

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    99
  2. Broken doors or locks
    67
  3. Peeling paint and plaster
    51
  4. Leaks and water damage
    32
  5. Plumbing, sinks and toilets
    19
  6. Mold
    18
  7. Missing smoke or CO detector
    16
  8. Mice or rats
    12
  9. No heat or hot water
    12
  10. Roaches
    9
  11. Lead paint
    6
  12. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 62 closed · NYC typical: 87 days
B121 days
from 44 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective [hinge] door from street to vestibule at basement at public hallIssued Nov 13, 2026 · fix by Nov 27, 2026 · Violation #19371417
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective [latch set] door from street to vestibule at basement at public hallIssued Nov 13, 2026 · fix by Nov 27, 2026 · Violation #19371419
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblys at door from street to vestibule vestibule at basement at public hallIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19371418
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19333385
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19307077
  • C
    Other repairsProperly repair with similar material the broken or defective marble tread at 5th from bottom at intermediate landing at public hall, 1st storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19301987
  • C
    Other repairsProperly repair with similar material the broken or defective marble tread at 1st from bottom at public hall, 1st storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19301985
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19302037
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latch at fire door leading to public hall at public hall stairs, 2nd storyIssued Oct 14, 2026 · fix by Oct 28, 2026 overdue · Violation #19302001
  • C
    Other repairsProperly repair with similar material the broken or defective marble tread at 3rd and 7th from bottom at public hall stairs, 2nd storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19302020
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower window sash at public hall stairs, 3rd storyIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19290452
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 1o sq ft at window frame and east wall in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19289754
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19267926
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket seal at lower refrigerator door in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19238927
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sqft at window in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19268223
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the kitchenetteIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19261284
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling,south east wall in the 1st room from east at centerIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238933
  • B
    Other repairsProperly repair with similar material the broken or defective sub wood floor in the 1st room from eastIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238925
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the entranceIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238932
  • B
    Other repairsProperly repair with similar material the broken or defective sub wood floor in the private hallwayIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238928
  • B
    Other repairsProperly repair with similar material the broken or defective at window frame at south wall in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238930
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238929
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window frame at south wall in the 1st room from east at southIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238931
  • B
    Broken doors or locksProperly repair or replace the broken or defective door at south wall and 1st door at west in the 1st room from east at centerIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238934
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19208653
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at southIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208661
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from eastIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208657
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 11, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19208663
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208662
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208660
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208659
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than (10) sq ft at east wall in the 3rd room from eastIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208658
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than (10) sq ft at ceiling in the 1st room from east at southIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19208655
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Sep 11, 2026 · fix by Sep 17, 2026 overdue · Violation #19208654
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150358
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak leak at steam pipe at east wall in the 2nd room from northIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19150362
  • C
    Other repairsProperly repair with similar material the broken or defective wood at floor (cracked, torn) in the private hallwayIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19150363
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of ac unit at fire escape window at room north 2 in the 2nd room from northIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19150359
  • B
    MoldTrace and repair the source and abate the visible mold condition at east wall not less than 4 sq. ft. in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19165504
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective cracked ceramic tiles at west wall at bathtub in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150357
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from northIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150361
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the kitchenIssued Aug 18, 2026 · fix by Sep 22, 2026 overdue · Violation #19151700
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19137328
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137326
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19137327
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137325
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower sash window at public hall stairs, 3rd storyIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19111218
  • C
    Other repairsProperly repair with similar material the broken or defective 2nd, 3rd and 5th marble tread from bottom intermediate landing at public hall stairs, 1st storyIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19111215
  • C
    Other repairsProperly repair with similar material the broken or defective 1st marble tread from bottom at public hall stairs, 1st storyIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19111214
  • C
    Other repairsProperly repair with similar material the broken or defective 4th and 6th marble tread brom bottom intermediate landing at public hall stairs, 2nd storyIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19111217
  • C
    Other repairsProperly repair with similar material the broken or defective 3rd, 5th, 7th marble tread from bottom at public hall stairs, 2nd storyIssued Aug 14, 2026 · fix by Aug 20, 2026 overdue · Violation #19111216
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from eastIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130801
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 3rd room from eastIssued Aug 13, 2026 · fix by Aug 19, 2026 overdue · Violation #19130808
  • B
    Other repairsProperly repair with similar material the broken or defective concrete subfloor (cracked and sunken) in the private hallwayIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130807
  • B
    Other repairsProperly repair with similar material the broken or defective cracked ceramic wall tiles at west wall in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130802
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor (lifting and sunken) in the 3rd room from eastIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130803
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130805
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130809
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south yardIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130810
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door at floor (warped) in the 1st room from north at eastIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19106897

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

222017
62018
12019
172020
292021
322022
252023
1042024
912025
2382026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 631 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.