Housing violations · Williamsbridge-Olinville
3800 Carpenter Avenue, Bronx
10467 · 55 apartments · 6 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs47
- Lead paint47
- Peeling paint and plaster32
- Leaks and water damage15
- Roaches13
- Mice or rats13
- Broken doors or locks11
- Plumbing, sinks and toilets8
- Missing smoke or CO detector6
- No heat or hot water5
- Mold2
- Missing window guards2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 195 closed · NYC typical: 87 days
from 290 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359214
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at closet ceiling south wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359219
- BOther repairsProperly repair with similar material the broken or defective wooden floor lifting in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359217
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359215
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet ceiling south wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359218
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359216
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362665
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362668
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362670
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362669
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362666
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362671
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362667
- BOther repairsRefit lower sash pane at window in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345930
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall west wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330447
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock installed at door to room with fire escape in the 1st room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330446
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330448
- BOther repairsProperly repair with similar material the broken or defective vinyl floor panels in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330449
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330450
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330451
- BOther repairs& 309 m/d law abate the nuisance consisting of plexiglass at east wall window at public hall, 2nd storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330444
- BOther repairs& 309 m/d law abate the nuisance consisting of plexiglass at north wall window at public hall, 2nd storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330445
- CBroken doors or locksProperly repair or replace the broken or defective glass pane at building entrance door at public hall, 1st storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19287706
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 6th storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19287712
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19287711
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287720
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from eastIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287715
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287716
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287721
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19260401
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19260402
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234184
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19233934
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 8, 2026 · fix by Sep 12, 2026 overdue · Violation #19206637
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 8, 2026 · fix by Sep 12, 2026 overdue · Violation #19206638
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133285
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd story balcony at south stack at east…Issued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19112017
- BOther repairsProperly repair with similar material the broken or defective brick & mortar joints at north, east & south parapet walls at building front inner court , 6th…Issued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19112013
- BOther repairsRefit upper sash at south wall window in the kitchenIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097335
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097336
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 2nd storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19090302
- CBroken doors or locksProperly repair or replace the broken or defective latch and assembly at compactor closet door at public hall, 4th storyIssued Jul 21, 2026 · fix by Jul 27, 2026 overdue · Violation #19090297
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at compactor closet at public hall, 4th storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19090294
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 29, 2026 · fix by Jul 5, 2026 overdue · Violation #19035305
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19026898
- BOther repairs& 309 m/d law abate the nuisance consisting of wood panels at west, north and east walls in the kitchenIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19026885
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 4th room from eastIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19026883
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 25, 2026 · fix by Jul 21, 2026 overdue · Violation #19026881
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued May 20, 2026 · fix by May 26, 2026 overdue · Violation #18937307
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18838774
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18838772
- CLead paint& 309 m/d law abate the nuisance consisting of a key operated lock installed at door leading to fire escape window in the 1st room from eastIssued Apr 27, 2026 · fix by May 3, 2026 overdue · Violation #18821268
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 27, 2026 · fix by Mar 23, 2026 overdue · rent impairing · Violation #18738464
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18738466
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18696505
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 6th storyIssued Feb 27, 2026 · fix by Mar 13, 2026 overdue · Violation #18669898
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 4th storyIssued Feb 27, 2026 · fix by Mar 13, 2026 overdue · Violation #18669897
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Feb 27, 2026 · fix by Mar 5, 2026 overdue · Violation #18669899
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east at southIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18580175
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 20, 2026 · fix by Jan 20, 2026 overdue · rent impairing · Violation #18580174
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.