Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Williamsbridge-Olinville

3800 Carpenter Avenue, Bronx

10467 · 55 apartments · 6 stories · City Council district 12

By · Updated · Data from NYC HPD

C
94open immediately hazardous violations · 171 per 100 apartments
B77Hazardous, open
A31Non-hazardous, open
!175Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company3800 CARP REALTY LLC
Landlord (head officer or owner)Angela Gazivoda

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    47
  2. Lead paint
    47
  3. Peeling paint and plaster
    32
  4. Leaks and water damage
    15
  5. Roaches
    13
  6. Mice or rats
    13
  7. Broken doors or locks
    11
  8. Plumbing, sinks and toilets
    8
  9. Missing smoke or CO detector
    6
  10. No heat or hot water
    5
  11. Mold
    2
  12. Missing window guards
    2
  13. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C86 days
from 195 closed · NYC typical: 87 days
B101 days
from 290 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359214
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at closet ceiling south wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359219
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor lifting in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359217
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359215
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet ceiling south wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359218
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19359216
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362665
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362668
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362670
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362669
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362666
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362671
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362667
  • B
    Other repairsRefit lower sash pane at window in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345930
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall west wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330447
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock installed at door to room with fire escape in the 1st room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330446
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330448
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor panels in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330449
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330450
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330451
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of plexiglass at east wall window at public hall, 2nd storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330444
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of plexiglass at north wall window at public hall, 2nd storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19330445
  • C
    Broken doors or locksProperly repair or replace the broken or defective glass pane at building entrance door at public hall, 1st storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19287706
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 6th storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19287712
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19287711
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287720
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from eastIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287715
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287716
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19287721
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19260401
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19260402
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234184
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19233934
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Sep 8, 2026 · fix by Sep 12, 2026 overdue · Violation #19206637
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 8, 2026 · fix by Sep 12, 2026 overdue · Violation #19206638
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19133285
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd story balcony at south stack at east…Issued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19112017
  • B
    Other repairsProperly repair with similar material the broken or defective brick & mortar joints at north, east & south parapet walls at building front inner court , 6th…Issued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19112013
  • B
    Other repairsRefit upper sash at south wall window in the kitchenIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097335
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097336
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 2nd storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19090302
  • C
    Broken doors or locksProperly repair or replace the broken or defective latch and assembly at compactor closet door at public hall, 4th storyIssued Jul 21, 2026 · fix by Jul 27, 2026 overdue · Violation #19090297
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at compactor closet at public hall, 4th storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19090294
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 29, 2026 · fix by Jul 5, 2026 overdue · Violation #19035305
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19026898
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of wood panels at west, north and east walls in the kitchenIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19026885
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 4th room from eastIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19026883
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 25, 2026 · fix by Jul 21, 2026 overdue · Violation #19026881
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued May 20, 2026 · fix by May 26, 2026 overdue · Violation #18937307
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18838774
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18838772
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of a key operated lock installed at door leading to fire escape window in the 1st room from eastIssued Apr 27, 2026 · fix by May 3, 2026 overdue · Violation #18821268
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 27, 2026 · fix by Mar 23, 2026 overdue · rent impairing · Violation #18738464
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18738466
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18696505
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 6th storyIssued Feb 27, 2026 · fix by Mar 13, 2026 overdue · Violation #18669898
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 4th storyIssued Feb 27, 2026 · fix by Mar 13, 2026 overdue · Violation #18669897
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Feb 27, 2026 · fix by Mar 5, 2026 overdue · Violation #18669899
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east at southIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18580175
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 20, 2026 · fix by Jan 20, 2026 overdue · rent impairing · Violation #18580174

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

592017
1212018
1612019
1012020
842021
842022
2282023
2772024
972025
1422026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,719 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.