Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Williamsbridge-Olinville

3929 Carpenter Avenue, Bronx

10466 · 37 apartments · 6 stories · City Council district 12

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 70 per 100 apartments
B43Hazardous, open
A26Non-hazardous, open
!74Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company3929 CARPENTER LLC
Landlord (head officer or owner)Angela Gazivoda

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    25
  2. Peeling paint and plaster
    17
  3. Mold
    16
  4. Leaks and water damage
    10
  5. Lead paint
    9
  6. Roaches
    6
  7. Plumbing, sinks and toilets
    4
  8. Broken doors or locks
    4
  9. Electrical problems
    2
  10. No heat or hot water
    1
  11. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C83 days
from 158 closed · NYC typical: 87 days
B90 days
from 127 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308635
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308634
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from south at east…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308573
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazeing at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303515
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303514
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north at eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308637
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster (approximately 20 sq ft) at ceiling in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19308632
  • C
    Other repairsProperly repair or replace the broken or defective spring balance lower sash at fire escape window in the 1st room from north at westIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303516
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at 1st window from south at west wall in the 1st room from north at westIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308645
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall in the 1st room from north at eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308639
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall and the ceiling in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294904
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the west wall in the private hallwayIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294906
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures sink, washbasin and bathtub in the entire apartmentIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19294656
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, the east wall and north wall in the bathroomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19294902
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling and west wall in the private hallwayIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19294905
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269245
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north and east wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269244
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275121
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19229891
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229334
  • B
    Other repairsReplace with new the missing escuteon at ceiling of riser in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229331
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229333
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 3rd room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229332
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel material by method of reglazing at bathtub in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229328
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at door in the entranceIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19152990
  • B
    Other repairsProperly repair with similar material the broken or defective wood window frame at east wall in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093626
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 30sq ft at ceiling north east and south wall in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093625
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093628
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046957
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046959
  • B
    Other repairsRefit the window frame in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046958
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at ceiling, north, east and south walls in the bathroomIssued Jul 6, 2026 · fix by Aug 1, 2026 overdue · Violation #19046960
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at window sill in the bathroomIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19010781
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued May 20, 2026 · fix by May 26, 2026 overdue · Violation #18937421
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet at public hall, 5th storyIssued May 7, 2026 · fix by May 21, 2026 overdue · Violation #18898721
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door frame at bulkhead , 6th storyIssued May 7, 2026 · fix by May 21, 2026 overdue · Violation #18898675
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and assemblies at hopper chute door at compactor closet at public hall, 2nd storyIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18898821
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd fire escape from north at east…Issued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18898649
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd fire escape from north at…Issued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18898647
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18697351
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling, north wall and west wall in the 1st room from north…Issued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18681848
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at the 1st window frame from south at west wall in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18676179
  • C
    Lead paintProperly repair or replace the broken or defective latch and assembly at door (leading to roof from public staircase) at public hall stairsIssued Feb 17, 2026 · fix by Feb 23, 2026 overdue · Violation #18645960
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18551685
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 2nd room from east at southIssued Jan 6, 2026 · fix by Jan 6, 2026 overdue · rent impairing · Violation #18551683
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18551686
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at north wall and ceiling in the 1st room from eastIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18551687
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft around casing at st window from south at west wall in the 3rd room from…Issued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #18025634
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall and west wall in the bathroomIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #18025633
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17871490
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17871489
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633778
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633782
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633781
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633777
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633780
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633779
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 3, 2024 · fix by Jun 29, 2024 overdue · Violation #17017773
  • B
    Plumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections sink,wash basin, water closet and tub. at cellarIssued May 22, 2024 · fix by Jun 26, 2024 overdue · Violation #16994131
  • B
    Electrical problemsDiscontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, electric stove at cellarIssued May 22, 2024 · fix by Jun 26, 2024 overdue · rent impairing · Violation #16994118

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

252017
322018
922019
892020
692021
1082022
1762023
1032024
452025
1442026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,085 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.