Housing violations · Williamsbridge-Olinville
3929 Carpenter Avenue, Bronx
10466 · 37 apartments · 6 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs25
- Peeling paint and plaster17
- Mold16
- Leaks and water damage10
- Lead paint9
- Roaches6
- Plumbing, sinks and toilets4
- Broken doors or locks4
- Electrical problems2
- No heat or hot water1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 158 closed · NYC typical: 87 days
from 127 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308635
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308634
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from south at east…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308573
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazeing at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303515
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303514
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from north at eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308637
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster (approximately 20 sq ft) at ceiling in the bathroomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19308632
- COther repairsProperly repair or replace the broken or defective spring balance lower sash at fire escape window in the 1st room from north at westIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303516
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at 1st window from south at west wall in the 1st room from north at westIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308645
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall in the 1st room from north at eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308639
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall and the ceiling in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294904
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the west wall in the private hallwayIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294906
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures sink, washbasin and bathtub in the entire apartmentIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19294656
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, the east wall and north wall in the bathroomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19294902
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling and west wall in the private hallwayIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19294905
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269245
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north and east wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269244
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275121
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19229891
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229334
- BOther repairsReplace with new the missing escuteon at ceiling of riser in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229331
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229333
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 3rd room from eastIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229332
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel material by method of reglazing at bathtub in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19229328
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at door in the entranceIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19152990
- BOther repairsProperly repair with similar material the broken or defective wood window frame at east wall in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093626
- BMoldTrace and repair the source and abate the visible mold condition less than 30sq ft at ceiling north east and south wall in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093625
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093628
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046957
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046959
- BOther repairsRefit the window frame in the bathroomIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19046958
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at ceiling, north, east and south walls in the bathroomIssued Jul 6, 2026 · fix by Aug 1, 2026 overdue · Violation #19046960
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at window sill in the bathroomIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19010781
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued May 20, 2026 · fix by May 26, 2026 overdue · Violation #18937421
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet at public hall, 5th storyIssued May 7, 2026 · fix by May 21, 2026 overdue · Violation #18898721
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door frame at bulkhead , 6th storyIssued May 7, 2026 · fix by May 21, 2026 overdue · Violation #18898675
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assemblies at hopper chute door at compactor closet at public hall, 2nd storyIssued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18898821
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd fire escape from north at east…Issued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18898649
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 2nd fire escape from north at…Issued May 7, 2026 · fix by Jun 11, 2026 overdue · Violation #18898647
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18697351
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling, north wall and west wall in the 1st room from north…Issued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18681848
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at the 1st window frame from south at west wall in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18676179
- CLead paintProperly repair or replace the broken or defective latch and assembly at door (leading to roof from public staircase) at public hall stairsIssued Feb 17, 2026 · fix by Feb 23, 2026 overdue · Violation #18645960
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18551685
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 2nd room from east at southIssued Jan 6, 2026 · fix by Jan 6, 2026 overdue · rent impairing · Violation #18551683
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18551686
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at north wall and ceiling in the 1st room from eastIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18551687
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft around casing at st window from south at west wall in the 3rd room from…Issued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #18025634
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall and west wall in the bathroomIssued Jun 13, 2025 · fix by Jul 18, 2025 overdue · Violation #18025633
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17871490
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from northIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17871489
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633778
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633782
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633781
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633777
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633780
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 17, 2025 · fix by Feb 10, 2025 overdue · Violation #17633779
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 3, 2024 · fix by Jun 29, 2024 overdue · Violation #17017773
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections sink,wash basin, water closet and tub. at cellarIssued May 22, 2024 · fix by Jun 26, 2024 overdue · Violation #16994131
- BElectrical problemsDiscontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, electric stove at cellarIssued May 22, 2024 · fix by Jun 26, 2024 overdue · rent impairing · Violation #16994118
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.