Housing violations · Wakefield-Woodlawn
4225 Carpenter Avenue, Bronx
10466 · 27 apartments · 5 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint13
- Peeling paint and plaster10
- Other repairs9
- Leaks and water damage9
- Roaches7
- Missing smoke or CO detector6
- Mold6
- Plumbing, sinks and toilets5
- Mice or rats4
- Broken doors or locks1
- No heat or hot water1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 15 closed · NYC typical: 87 days
from 54 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256434
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256433
- BOther repairsRefit lower sash at 2nd window from south at west wall in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256435
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective at sink base cabinet in the kitchenIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256431
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wasteline at sink in the kitchenIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256430
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19256429
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231349
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231347
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at sink in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19231346
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and west wall in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231344
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231348
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall and west wall in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19231345
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194564
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees at fixtures in the entire apartmentIssued Feb 9, 2026 · fix by Feb 15, 2026 overdue · Violation #18622310
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling and south wall in the bathroomIssued Nov 7, 2025 · fix by Dec 12, 2025 overdue · Violation #18352338
- BMoldTrace and repair the source and abate the visible mold condition approximately 5 sq ft at window frame from west at north wall in the 2nd room from north at…Issued Sep 25, 2024 · fix by Oct 30, 2024 overdue · Violation #17307405
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 3, 2024 · fix by Jul 27, 2024 overdue · Violation #17097848
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 3, 2024 · fix by Jul 27, 2024 overdue · Violation #17097849
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling ceiling in the bathroomIssued Jul 3, 2024 · fix by Aug 7, 2024 overdue · Violation #17091008
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued Jul 3, 2024 · fix by Aug 7, 2024 overdue · Violation #17091009
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 3, 2024 · fix by Jul 29, 2024 overdue · Violation #17091011
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 3, 2024 · fix by Jul 27, 2024 overdue · Violation #17097850
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 28, 2024 · fix by Jun 23, 2024 overdue · Violation #16996328
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 28, 2024 · fix by Jun 21, 2024 overdue · Violation #17003167
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 28, 2024 · fix by Jun 21, 2024 overdue · Violation #17003169
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazed finish at bathtub in the bathroomIssued May 28, 2024 · fix by Jul 2, 2024 overdue · Violation #16996329
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 28, 2024 · fix by Jun 21, 2024 overdue · Violation #17003170
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 18, 2024 · fix by May 14, 2024 overdue · Violation #16879256
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued Apr 18, 2024 · fix by May 23, 2024 overdue · rent impairing · Violation #16879251
- BMoldTrace and repair the source and abate the visible mold condition approx 8 at window frame at 1st window from east,,,, and approx 8 sqft at window frame at 2nd…Issued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16879252
- BElectrical problemsProperly repair or replace the broken or defective lighting fixtures at ceiling in the 4th room from eastIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16879253
- BLeaks and water damageRepair the roof so that it will not leak at window casing ceiling in the kitchenIssued Apr 18, 2024 · fix by May 23, 2024 overdue · rent impairing · Violation #16879254
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at window casing ceiling in the kitchenIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16879255
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 18, 2024 · fix by May 14, 2024 overdue · Violation #16879257
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Apr 18, 2024 · fix by Apr 24, 2024 overdue · Violation #16879259
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 8, 2023 · fix by Jan 3, 2024 overdue · Violation #16510383
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2023 · fix by Jan 3, 2024 overdue · Violation #16510382
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 14, 2023 · fix by Dec 10, 2023 overdue · Violation #16368431
- BLeaks and water damageRepair the leaky and/or defective faucets at sink, in the kitchenIssued Oct 4, 2023 · fix by Nov 8, 2023 overdue · Violation #16283729
- BPlumbing, sinks and toiletsReplace the broken or defective wash basin, in the bathroomIssued Oct 4, 2023 · fix by Nov 8, 2023 overdue · rent impairing · Violation #16283711
- BMoldTrace and repair the source and abate the visible mold condition around window frame on south wall. in the bathroomIssued Sep 29, 2023 · fix by Nov 3, 2023 overdue · Violation #16265478
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 1, 2023 · fix by Jun 27, 2023 overdue · Violation #16013587
- BOther repairsProperly repair or replace the broken or defective spring counter balances at all lower window sashes in the entire apartmentIssued Jun 1, 2023 · fix by Jul 6, 2023 overdue · Violation #16013589
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 1, 2023 · fix by Jun 27, 2023 overdue · Violation #16013588
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jun 1, 2023 · fix by Jul 6, 2023 overdue · Violation #16013591
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the rubbish/ debris at west yardIssued Jun 1, 2023 · fix by Jul 6, 2023 overdue · Violation #16013594
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Jun 1, 2023 · fix by Jul 6, 2023 overdue · Violation #16013595
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jun 1, 2023 · fix by Jul 6, 2023 overdue · Violation #16013590
- BLeaks and water damageRepair the roof so that it will not leak over ceiling and south wall in the kitchenIssued Jun 1, 2023 · fix by Jul 6, 2023 overdue · rent impairing · Violation #16013586
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 19, 2023 · fix by May 13, 2023 overdue · Violation #15934895
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 18, 2023 · fix by May 12, 2023 overdue · Violation #15934618
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 18, 2023 · fix by May 12, 2023 overdue · Violation #15934619
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 18, 2023 · fix by May 12, 2023 overdue · Violation #15934617
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 14, 2023 · fix by May 10, 2023 overdue · Violation #15921854
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2023 · fix by May 10, 2023 overdue · Violation #15921853
- BMoldTrace and repair the source and abate the visible mold condition on ceiling approx. 2 sq ft, south wall approx. 1 sq ft. and weest wall approx. 1 sq ft. in…Issued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15407795
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 3, 2020 · fix by Jan 31, 2020 overdue · Violation #13526163
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 3, 2020 · fix by Jan 31, 2020 overdue · Violation #13526162
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 3, 2020 · fix by Jan 31, 2020 overdue · Violation #13526160
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jan 2, 2020 · fix by Feb 6, 2020 overdue · Violation #13521966
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.