Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Concourse-Concourse Village

1126 Carroll Place, Bronx

10456 · 49 apartments · 6 stories · City Council district 16

By · Updated · Data from NYC HPD

C
16open immediately hazardous violations · 33 per 100 apartments
B32Hazardous, open
A9Non-hazardous, open
!56Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company1124 CARROLL REALTY ASSOC
Landlord (head officer or owner)Jay Rand

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    13
  2. Other repairs
    10
  3. Lead paint
    9
  4. Missing smoke or CO detector
    7
  5. Mold
    6
  6. Roaches
    4
  7. Broken doors or locks
    2
  8. Mice or rats
    2
  9. Leaks and water damage
    2
  10. Plumbing, sinks and toilets
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 17 closed · NYC typical: 87 days
B122 days
from 57 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 5th and 2nd story balcony at west exterior wall at…Issued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19352835
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154418
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154417
  • B
    MoldTrace and repair the source and abate the visible mold condition observed more than 10 sq.ft and less than 30 sqft at ceiling, east wall and west wall in the…Issued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154413
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19154419
  • B
    Broken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at south wall in the foyerIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154412
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at southIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154423
  • B
    MoldTrace and repair the source and abate the visible mold condition observed more than 10 sq.ft and less than 30sqft at ceiling west wall and east wall in the…Issued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154421
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154414
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at southIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154415
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at northIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154416
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19154420
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at northIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19154422
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued May 28, 2026 · fix by Jun 3, 2026 overdue · Violation #18961003
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 25, 2024 · fix by Feb 20, 2024 overdue · Violation #16619476
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at north wall, 4 sq ft at east wall, 2 sq ft at south wall, 4 sq ft at west…Issued Jan 25, 2024 · fix by Feb 29, 2024 overdue · Violation #16619479
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Jan 25, 2024 · fix by Feb 29, 2024 overdue · Violation #16619484
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Nov 3, 2023 · fix by Dec 8, 2023 overdue · Violation #16353282
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Nov 3, 2023 · fix by Dec 8, 2023 overdue · Violation #16353283
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 13, 2023 · fix by Aug 6, 2023 overdue · Violation #16096270
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 12, 2023 · fix by Aug 5, 2023 overdue · Violation #16096065
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 12, 2023 · fix by Aug 5, 2023 overdue · Violation #16096066
  • C
    MoldTrace and repair the source and abate the visible mold condition approx. 15 sq. ft. at the ceiling, north wall, west wall in the bathroomIssued Nov 17, 2020 · fix by Dec 13, 2020 overdue · Violation #13901413
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Sep 2, 2020 · fix by Oct 7, 2020 overdue · Violation #13793829
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2020 · fix by Sep 28, 2020 overdue · Violation #13793828
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 2, 2020 · fix by Oct 7, 2020 overdue · Violation #13793830
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 6 sq ft at closet from north at east wall in the private hallwayIssued Sep 17, 2019 · fix by Oct 22, 2019 overdue · Violation #13284113
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defectiveIssued Jul 26, 2019 · fix by Aug 30, 2019 overdue · Violation #13189793
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at sink in the kitchenIssued Jul 26, 2019 · fix by Aug 30, 2019 overdue · rent impairing · Violation #13189792
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Jul 26, 2019 · fix by Aug 30, 2019 overdue · Violation #13189801
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling around riser in the kitchenIssued Jul 26, 2019 · fix by Aug 30, 2019 overdue · Violation #13189788
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 26, 2019 · fix by Aug 16, 2019 overdue · Violation #13189779
  • B
    Broken doors or locksReplace with new the broken or defective glass door at entrance at public hall, 2nd story, section at northIssued Feb 25, 2019 · fix by Apr 1, 2019 overdue · Violation #12923583
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 5, 2018 · fix by Jul 3, 2018 overdue · Violation #12415991
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 19, 2018 · fix by May 17, 2018 overdue · Violation #12341214
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 19, 2018 · fix by May 17, 2018 overdue · Violation #12341213
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold 10 sq ft at east and north wall in the 1st room from northIssued Apr 4, 2018 · fix by May 9, 2018 overdue · Violation #12318136
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 3, 2018 · fix by May 1, 2018 overdue · Violation #12317071
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 3, 2018 · fix by May 1, 2018 overdue · Violation #12317070
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 3, 2018 · fix by May 1, 2018 overdue · Violation #12317072
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jun 30, 2016 · fix by Aug 4, 2016 overdue · Violation #11292623
  • B
    Other repairsReplace with new the broken or defective eroded angle irons and metal pan, 3rd, 4th , 5th and 6th up from bottom at bulkhead stairs , 6th story, section ''#…Issued Jul 25, 2012 · fix by Aug 29, 2012 overdue · Violation #9513342
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at bulkhead walls , 6th story, section ''#1126'', at northIssued Jul 25, 2012 · fix by Aug 29, 2012 overdue · Violation #9513346
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at bulkhead walls , 6th story, section ''# 1124'', at southIssued Jul 25, 2012 · fix by Aug 29, 2012 overdue · Violation #9513327
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling and walls at public hall, 6th story, section ''#1124'', at southIssued Jul 25, 2012 · fix by Aug 29, 2012 overdue · Violation #9513337
  • B
    Other repairsProperly repair with similar material the broken or defective eroded angle irons and metal pan, 1st and 3rd, up from bottom at public hall, 6th story, section…Issued Jul 25, 2012 · fix by Aug 29, 2012 overdue · Violation #9513339
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant ceiling and walls at roof bulkhead at public hall stairs, section ''bldg 1124'',…Issued Apr 19, 2012 · fix by May 24, 2012 overdue · Violation #9406214
  • B
    Other repairsReplace with new the broken or defective marble saddle in the entranceIssued Apr 20, 2009 · fix by May 25, 2009 overdue · Violation #7830294

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
392018
202019
62020
12021
112023
522024
172025
342026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 468 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.