Housing violations · Manhattanville-West Harlem
1470 Amsterdam Avenue, Manhattan
10027 · 211 apartments · 20 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster9
- Broken doors or locks8
- Mice or rats7
- Mold7
- Other repairs6
- Leaks and water damage4
- Roaches4
- Electrical problems2
- Missing smoke or CO detector2
- Plumbing, sinks and toilets2
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 47 closed · NYC typical: 87 days
from 42 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2026 · fix by Dec 9, 2026 · Violation #19371461
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19353159
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles at public hall, 3rd storyIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353160
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Oct 13, 2026 · fix by Oct 17, 2026 overdue · Violation #19301465
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the kitchenIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19169893
- BOther repairsReplace with new the missing mechanical vent cover at north wall in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19169890
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169892
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hopper door at public hall, 13th storyIssued Aug 31, 2026 · fix by Sep 14, 2026 overdue · Violation #19169894
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169886
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19169889
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169885
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169891
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169887
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169888
- BBroken doors or locksProperly repair or replace the broken or defective door jamb and header in the entranceIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19139466
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at south wall in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19139469
- BPlumbing, sinks and toiletsReplace the broken or defective wash basin at west wall in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · rent impairing · Violation #19139467
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 19, 2026 · fix by Sep 14, 2026 overdue · Violation #19139470
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19139468
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18935751
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures in the entire apartmentIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18935750
- CBroken doors or locksProperly repair or replace the broken or defective glass pane 2nd from bottom at right sidelite at door to balcony on east wall at public hall, 19th storyIssued May 1, 2026 · fix by May 7, 2026 overdue · Violation #18826345
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 24, 2026 · fix by May 20, 2026 overdue · Violation #18802554
- BBroken doors or locksRefit exit door to 1a staircase at public hall, 1st storyIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787781
- BBroken doors or locksProperly repair or replace the broken or defective door knob on exit door to 1a staircase at public hall, 1st storyIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18787780
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18771932
- BPlumbing, sinks and toiletsReplace with new the missing base cabinet at sink in the kitchenIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18659129
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634875
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18494701
- COther repairsProperly repair or replace the broken or defective riser pipe, the second from south at the west in the bathroomIssued Nov 25, 2025 · fix by Dec 1, 2025 overdue · Violation #18428522
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the bathroomIssued Nov 13, 2025 · fix by Dec 18, 2025 overdue · Violation #18372376
- CMoldTrace and repair the source and abate the visible mold condition at ceiling less than 20 sq.ft in the bathroomIssued Nov 13, 2025 · fix by Dec 9, 2025 overdue · Violation #18372620
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and east walls in the bathroomIssued Sep 4, 2025 · fix by Oct 9, 2025 overdue · Violation #18195708
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 4, 2025 · fix by Sep 30, 2025 overdue · Violation #18195707
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the kitchenIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18195699
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from northIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18195705
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 3rd room from northIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18195704
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the private hallwayIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18195703
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq ft at west wall in the foyerIssued Aug 19, 2025 · fix by Sep 23, 2025 overdue · Violation #18168184
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at south wall in the 1st room from northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18073369
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at ceiling in the 1st room from northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18073368
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at west wall in the 1st room from northIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18073367
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17917335
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 27, 2025 · fix by Jun 22, 2025 overdue · Violation #17917329
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17917336
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 29, 2025 · fix by May 25, 2025 overdue · Violation #17855230
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 16, 2025 · fix by May 12, 2025 overdue · Violation #17828697
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket seal at refrigerator door in the kitchenIssued Apr 16, 2025 · fix by May 21, 2025 overdue · Violation #17828699
- CMoldTrace and repair the source and abate the visible mold condition more than 30 square feet at ceiling and all walls in the 2nd room from northIssued Mar 4, 2025 · fix by Mar 30, 2025 overdue · Violation #17733063
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.