Housing violations · Manhattanville-West Harlem
1484 Amsterdam Avenue, Manhattan
10031 · 28 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
23 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs30
- Peeling paint and plaster30
- Leaks and water damage20
- Missing smoke or CO detector18
- Broken doors or locks12
- Roaches9
- Plumbing, sinks and toilets8
- Mold7
- No heat or hot water7
- Mice or rats7
- Electrical problems3
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 60 closed · NYC typical: 87 days
from 61 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksProvide ready access to buildings heating system door locked in cellar at 1st boiler room from northIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19283284
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to cellphone in the entranceIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249459
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at head jamb at window at west wall in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19088893
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at west wall and north wall in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19088894
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from eastIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18819440
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Apr 29, 2026 · fix by May 5, 2026 overdue · Violation #18819443
- BLeaks and water damageRepair the roof so that it will not leak the ceiling and south wall in the 1st room from eastIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · rent impairing · Violation #18819441
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Apr 23, 2026 · fix by May 7, 2026 overdue · Violation #18803938
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18803937
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at north and west wall in the bathroomIssued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18803936
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the 1st room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723861
- BOther repairsProperly repair with similar material the broken or defective wood sub-floor in the 2nd room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723865
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the 1st room from east at southIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723862
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723876
- BOther repairsProperly repair or replace the broken or defective wood upper base cabinet at east wall in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723858
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling at ''steam riser'' in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723832
- BOther repairsProperly secure the loose rubber flooring at intermediate landing at public hall stairs, 1st storyIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723931
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723622
- BOther repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the 1st room from eastIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723667
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the 1st room from eastIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723664
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723856
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the 2nd room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723866
- BOther repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723854
- BOther repairsProperly secure the loose escutcheon plate at steam riser at ceiling in the bathroomIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723853
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723868
- BBroken doors or locksProperly repair or replace the broken or defective wood door at entrance in the 2nd room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723869
- BOther repairsReplace with new the missing escutcheon plate at steam riser at ceiling in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723626
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18723878
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18602481
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jan 29, 2026 · fix by Mar 5, 2026 overdue · Violation #18602480
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 14, 2026 · fix by Jan 14, 2026 overdue · rent impairing · Violation #18568664
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jan 14, 2026 · fix by Jan 20, 2026 overdue · Violation #18568663
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 14, 2026 · fix by Jan 14, 2026 overdue · rent impairing · Violation #18568662
- BOther repairsProperly repair or replace the broken or defective intercom system at south wall to building entrance in the entire apartmentIssued Dec 2, 2025 · fix by Jan 6, 2026 overdue · Violation #18475237
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 31, 2025 · fix by Nov 26, 2025 overdue · Violation #18339732
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 31, 2025 · fix by Oct 30, 2025 overdue · rent impairing · Violation #18333805
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 30, 2025 · fix by Nov 5, 2025 overdue · Violation #18333807
- CLead paint& 309 m/d law abate the nuisance consisting of air conditioning unit installed at window leading to fire escape exit in the 3rd room from eastIssued Jun 16, 2025 · fix by Jun 22, 2025 overdue · Violation #18035166
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 30, 2025 · fix by Feb 25, 2025 overdue · Violation #17662519
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 30, 2025 · fix by Feb 25, 2025 overdue · Violation #17654339
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 30, 2025 · fix by Feb 25, 2025 overdue · Violation #17654338
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 4th room from eastIssued Jan 9, 2025 · fix by Feb 13, 2025 overdue · Violation #17612741
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 1st room from northIssued Dec 6, 2024 · fix by Jan 10, 2025 overdue · Violation #17541059
- COther repairsProvide an adequate supply of gas to the fixtures no gas at range in the kitchenIssued Sep 16, 2024 · fix by Sep 22, 2024 overdue · rent impairing · Violation #17270751
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective at bathtub in the bathroomIssued Aug 13, 2024 · fix by Sep 17, 2024 overdue · Violation #17175278
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from northIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17175280
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17175282
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17175275
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17175276
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 8, 2024 · fix by Sep 3, 2024 overdue · Violation #17175274
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Aug 8, 2024 · fix by Sep 12, 2024 overdue · Violation #17175277
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 8, 2024 · fix by Sep 3, 2024 overdue · Violation #17175273
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 4th room from eastIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · Violation #17021890
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · Violation #17021893
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · Violation #17021892
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · rent impairing · Violation #17021885
- COther repairsProperly repair or replace the broken or defective ceiling light fixture in the 1st room from eastIssued Jun 6, 2024 · fix by Jun 12, 2024 overdue · Violation #17021887
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at washbasin in the bathroomIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · rent impairing · Violation #17021884
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · Violation #17021886
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from eastIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · rent impairing · Violation #17021888
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.