Housing violations · Concourse-Concourse Village
1142 College Avenue, Bronx
10456 · 30 apartments · 5 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint20
- Peeling paint and plaster14
- Other repairs14
- Leaks and water damage9
- Roaches9
- Plumbing, sinks and toilets8
- Broken doors or locks6
- Mice or rats6
- Electrical problems4
- Mold2
- Missing smoke or CO detector2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 203 closed · NYC typical: 87 days
from 178 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [latch set and its assemblys at door at vestibule at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19303665
- BBroken doors or locksReplace with new the missing latch set at door at vestibule at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303666
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288491
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288486
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective caulking of perimeter of bathtub in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288488
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at vestibule at public hall, 1st storyIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19273629
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19273631
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at vestibule at public hall, 1st storyIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19273637
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 1st storyIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19273639
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19178175
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19178174
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18997644
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of wall erected with door divided two room into two in the 1st room from northIssued Apr 10, 2025 · fix by May 15, 2025 overdue · Violation #17823511
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 4, 2025 · fix by Apr 10, 2025 overdue · Violation #17809930
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 3, 2025 · fix by Mar 29, 2025 overdue · Violation #17729839
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at bathtub in the bathroomIssued Dec 2, 2024 · fix by Jan 6, 2025 overdue · rent impairing · Violation #17482835
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17316030
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17316010
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17315992
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Oct 1, 2024 · fix by Nov 5, 2024 overdue · Violation #17315996
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Sep 17, 2024 · fix by Sep 21, 2024 overdue · Violation #17284042
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Sep 17, 2024 · fix by Sep 21, 2024 overdue · Violation #17284041
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 22, 2024 · fix by Sep 17, 2024 overdue · Violation #17219051
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). deffective in the entire apartmentIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17142266
- BMissing smoke or CO detectorRepair or replace the smoke detector deffective in the entire apartmentIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17142264
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jul 18, 2024 · fix by Jul 24, 2024 overdue · Violation #17122290
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and north wall in the bathroomIssued Jul 18, 2024 · fix by Jul 24, 2024 overdue · Violation #17122284
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 29, 2024 · fix by May 25, 2024 overdue · Violation #16933260
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet at east in the kitchenIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16933254
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 29, 2024 · fix by May 25, 2024 overdue · Violation #16933261
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16933253
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16933258
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Apr 29, 2024 · fix by Jun 3, 2024 overdue · Violation #16933257
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroomIssued Apr 11, 2024 · fix by Apr 17, 2024 overdue · Violation #16861216
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the bathroomIssued Apr 11, 2024 · fix by Apr 17, 2024 overdue · Violation #16861190
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel at bathtub in the bathroomIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16715215
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Mar 4, 2024 · fix by Mar 10, 2024 overdue · Violation #16715214
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of slide bolt with eye installed at door in the entranceIssued Mar 4, 2024 · fix by Mar 10, 2024 overdue · Violation #16715210
- CPlumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued Mar 4, 2024 · fix by Mar 10, 2024 overdue · rent impairing · Violation #16715213
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Mar 4, 2024 · fix by Mar 10, 2024 overdue · Violation #16715211
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Mar 4, 2024 · fix by Apr 8, 2024 overdue · Violation #16715216
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16413766
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16413767
- BBroken doors or locksRefit door closet in the foyerIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16413765
- COther repairsProperly repair with similar material the broken or defective glass pane lower sash window, window at south wall in the 3rd room from northIssued Nov 21, 2023 · fix by Nov 27, 2023 overdue · Violation #16413781
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 21, 2023 · fix by Dec 17, 2023 overdue · Violation #16413763
- BMoldTrace and repair the source and abate the visible mold condition at ceiling aprox 10 sq feet in the bathroomIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16413768
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from eastIssued Oct 25, 2023 · fix by Oct 31, 2023 overdue · Violation #16339773
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of slide bolt with eye capable of being locked installed at door in the entranceIssued Oct 25, 2023 · fix by Oct 31, 2023 overdue · Violation #16339718
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 23, 2023 · fix by Sep 18, 2023 overdue · Violation #16176979
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective culking around the washbasin in the bathroomIssued Aug 23, 2023 · fix by Aug 29, 2023 overdue · Violation #16176969
- BOther repairsReplace with new the missing escutcheon plate around riser at ceiling in the entire apartmentIssued Jun 2, 2023 · fix by Jul 7, 2023 overdue · Violation #16018618
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 16, 2023 · fix by Apr 11, 2023 overdue · Violation #15779475
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color 10 sq ft at ceiling in the kitchenIssued Nov 15, 2022 · fix by Nov 21, 2022 overdue · Violation #15527733
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 10, 2022 · fix by Jun 14, 2022 overdue · Violation #15150379
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 10, 2022 · fix by Jun 14, 2022 overdue · Violation #15150380
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 10, 2022 · fix by Jun 14, 2022 overdue · Violation #15150406
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 10, 2022 · fix by Jun 14, 2022 overdue · Violation #15150375
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 10, 2022 · fix by Jun 14, 2022 overdue · Violation #15147344
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued May 10, 2022 · fix by Jun 14, 2022 overdue · Violation #15147345
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.