Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Concourse-Concourse Village

1220 College Avenue, Bronx

10456 · 11 apartments · 5 stories · City Council district 16

By · Updated · Data from NYC HPD

C
68open immediately hazardous violations · 618 per 100 apartments
B91Hazardous, open
A28Non-hazardous, open
!187Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company1220 COL-BX LLL

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    35
  2. Lead paint
    24
  3. Missing smoke or CO detector
    20
  4. Peeling paint and plaster
    20
  5. Roaches
    17
  6. Broken doors or locks
    16
  7. Mice or rats
    15
  8. Mold
    12
  9. Plumbing, sinks and toilets
    8
  10. Leaks and water damage
    7
  11. No heat or hot water
    6
  12. Electrical problems
    5
  13. Missing window guards
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C95 days
from 49 closed · NYC typical: 87 days
B91 days
from 27 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Other repairsProperly repair or replace the broken or defective lower sash glass pane at west wall at public hall, 3rd storyIssued Aug 7, 2026 · fix by Aug 13, 2026 overdue · Violation #19125488
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19125423
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19125426
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19125443
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19125444
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19125419
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2026 · fix by Sep 2, 2026 overdue · Violation #19125448
  • B
    Plumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color east wall behind toilet in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19125445
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 7, 2026 · fix by Sep 2, 2026 overdue · rent impairing · Violation #19125447
  • B
    Broken doors or locksProvide approved glass at building entrance door (from street to public hall) at basementIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082509
  • B
    Other repairsReplace with new the missing escutcheon plate at ceiling at riser in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082503
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082501
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket around lower refrigerator door in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082502
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082504
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door (from street to public hall) at basementIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082508
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling in the bathroomIssued Mar 19, 2026 · fix by Apr 23, 2026 overdue · Violation #18730441
  • B
    Other repairsProperly repair or replace the broken or defective floor near radiator at east in the 3rd room from northIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18505435
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 15, 2025 · fix by Jan 10, 2026 overdue · Violation #18505438
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18505437
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18505436
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 19, 2025 · fix by Dec 15, 2025 overdue · Violation #18378243
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 19, 2025 · fix by Dec 15, 2025 overdue · Violation #18378244
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18378246
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18378245
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at ceiling in the bathroomIssued Oct 28, 2025 · fix by Dec 2, 2025 overdue · Violation #18337168
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sqft at window stool in the bathroomIssued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18143549
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 30, 2025 · fix by Aug 25, 2025 overdue · Violation #18126640
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 3, 2025 · fix by Jul 29, 2025 overdue · Violation #18057566
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 3, 2025 · fix by Jul 29, 2025 overdue · Violation #18057567
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 30, 2025 · fix by Jul 26, 2025 overdue · Violation #18056903
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 30, 2025 · fix by Jul 26, 2025 overdue · Violation #18056904
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 20, 2025 · fix by Jul 16, 2025 overdue · Violation #18044951
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Apr 11, 2025 · fix by Apr 11, 2025 overdue · rent impairing · Violation #17819641
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17812076
  • B
    Other repairsProvide escutcheon plate at riser (pest entryway) in the bathroomIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17805639
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Apr 8, 2025 · fix by Apr 14, 2025 overdue · Violation #17811916
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 8, 2025 · fix by Apr 14, 2025 overdue · Violation #17811917
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Apr 8, 2025 · fix by Apr 8, 2025 overdue · rent impairing · Violation #17811914
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 8, 2025 · fix by Apr 8, 2025 overdue · rent impairing · Violation #17811915
  • C
    Broken doors or locksProvide ready access to buildings heating system , (door locked), at boiler roomIssued Apr 7, 2025 · fix by Apr 13, 2025 overdue · Violation #17805643
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). that is missing in the entire apartmentIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805637
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 26, 2025 · fix by Apr 1, 2025 overdue · Violation #17782646
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 17, 2025 · fix by Mar 16, 2025 overdue · rent impairing · Violation #17763016
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Aug 7, 2024 · fix by Aug 11, 2024 overdue · Violation #17174674
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Aug 7, 2024 · fix by Aug 11, 2024 overdue · Violation #17174675
  • B
    MoldTrace and repair the source and abate the visible mold condition 4 square feet at north wall in the bathroomIssued Mar 15, 2024 · fix by Apr 19, 2024 overdue · Violation #16755083
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 1, 2024 · fix by Feb 27, 2024 overdue · Violation #16645121
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 22, 2024 · fix by Feb 17, 2024 overdue · Violation #16610519
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 2, 2024 · fix by Jan 26, 2024 overdue · Violation #16566013
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 2, 2024 · fix by Jan 26, 2024 overdue · Violation #16566015
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 2, 2024 · fix by Jan 26, 2024 overdue · Violation #16566011
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jan 2, 2024 · fix by Jan 26, 2024 overdue · Violation #16566048
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 2, 2024 · fix by Jan 26, 2024 overdue · Violation #16566012
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 2, 2024 · fix by Jan 26, 2024 overdue · Violation #16566014
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16543255
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16543254
  • B
    Other repairsAbate the infestation consisting of vermin flies in the entire apartmentIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · Violation #16543253
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 28, 2023 · fix by Jan 23, 2024 overdue · Violation #16543252
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 1st room from eastIssued Dec 28, 2023 · fix by Feb 1, 2024 overdue · rent impairing · Violation #16543249
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 26, 2023 · fix by Jan 21, 2024 overdue · Violation #16540358

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

302017
12018
252019
72020
252021
732022
512023
202024
1062025
222026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 596 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.