Housing violations · Eastchester-Edenwald-Baychester
3520 Corsa Avenue, Bronx
10469 · 3 apartments · 3 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
60 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Open problems
All open violations in the building, by type.
- Other repairs154
- Peeling paint and plaster130
- Leaks and water damage101
- Roaches58
- Mice or rats57
- Plumbing, sinks and toilets52
- Mold42
- Missing smoke or CO detector40
- Broken doors or locks39
- No heat or hot water32
- Lead paint2
- Electrical problems2
- Bedbugs2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 3 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19368140
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste at sink (lower sink cabinet /south wall) in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368144
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19368145
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall and east wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368143
- BLeaks and water damageRepair the leaky and/or defective faucets wash basin at west wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368142
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19368141
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341305
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tile at north wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341303
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341302
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19341301
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall at public hall, 1st storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341307
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341306
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19341304
- BOther repairsAbate the nuisance consisting of pests. evidence of spiders in the entire apartmentIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19334056
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19334061
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19334057
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and east wall in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19334062
- BOther repairsProperly repair with similar material the broken or defective loose floor tile at floor in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19334060
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19334059
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19334058
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at north wall and east wall in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19334063
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at west wall in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343416
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at north wall in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19343415
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq.ft at north wall. in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19289760
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at wash basin in the 1st bathroom from northIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19195515
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at bottom base cabinet in the kitchenIssued Sep 4, 2026 · fix by Oct 9, 2026 overdue · Violation #19195516
- BMoldTrace and repair the source and abate the visible mold condition lwss than 10sq.ft at kitchen sink base in the kitchenIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19152794
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at ceiling and walls in the 1st bathroom from northIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19142689
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft on the ceiling in the kitchenIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19135175
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures atbathtub in the 1st bathroom from east at southIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · rent impairing · Violation #19076930
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076933
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the 1st bathroom from east at southIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076928
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective cabinet flooring at sink in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076940
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at washbasin drainpipe in the 1st bathroom from east at southIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · rent impairing · Violation #19076926
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the 2nd bathroom from east at northIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076935
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the 1st bathroom from east at southIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076934
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, south, and west walls in the 2nd bathroom from east at northIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076937
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 3rd room from east at northIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076943
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at bathtub in the 1st bathroom from east at southIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · rent impairing · Violation #19076929
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 17, 2026 · fix by Aug 12, 2026 overdue · Violation #19076941
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south, and west walls in the 2nd bathroom from east at northIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076938
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north, south, and west walls in the 2nd bathroom from east at northIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076936
- BOther repairsProperly repair or replace the broken or defective buzzer and return voice system from building entrance up to panel at north wall in the 2nd room from eastIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076942
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076932
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 17, 2026 · fix by Aug 12, 2026 overdue · Violation #19076931
- BPlumbing, sinks and toiletsRepair the broken or defective connection at drainpipe at sink in the kitchenIssued Jul 17, 2026 · fix by Aug 21, 2026 overdue · Violation #19076939
- BOther repairs& 309 m/d law abate the nuisance consisting of overgrown vegatation.weeds obstructing the egress at rear yard yard, 1st storyIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19064876
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064863
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19064875
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19064874
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064869
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064868
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064867
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064866
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064865
- BLead paintProperly repair or replace the broken or defective bell buzzer intercom system leading from building front to foyerIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064864
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064862
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sqft and less than 30sq ft at west wall and north wall in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064870
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at wash basin in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · rent impairing · Violation #19064871
- BPlumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at wash basin in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · rent impairing · Violation #19064872
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.