Housing violations · Melrose
582 Courtlandt Avenue, Bronx
10451 · 11 apartments · 5 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster22
- Other repairs13
- Leaks and water damage12
- Mold5
- Broken doors or locks3
- Missing window guards2
- Mice or rats1
- Electrical problems1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 36 closed · NYC typical: 87 days
from 52 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19140760
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19140759
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19140762
- BBroken doors or locksReplace with new the missing exterior knob at door in the entranceIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19140764
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19127447
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, east and south walls in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19122993
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19122994
- CMoldTrace and repair the source and abate the visible mold condition more than (10) sq ft at ceiling in the kitchenIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19123192
- COther repairsCleanse and disinfect to the satisfaction of this department after removing the stagnant water at roof extentions at air shafts at south and north at air shaft…Issued Jul 24, 2026 · fix by Jul 30, 2026 overdue · rent impairing · Violation #19096236
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th storyIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19096153
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at bulkhead at roofIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · rent impairing · Violation #19096148
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and south wall at bulkhead at roofIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19096149
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 5th storyIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · rent impairing · Violation #19096152
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 22, 2026 · fix by Aug 17, 2026 overdue · Violation #19096324
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st bathroom from eastIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096322
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st bathroom from eastIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096321
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the kitchenIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18368044
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18368043
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18368047
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18368045
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the private hallwayIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18368046
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the bathroomIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18368042
- BOther repairsReplace with new the missing saddle at floor in the kitchenIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18252755
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the kitchenIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18252750
- BMoldTrace and repair the source and abate the visible mold condition more than (10) sq ft at south wall in the 1st room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18227524
- BMoldTrace and repair the source and abate the visible mold condition more than (10) sq ft at ceiling in the bathroomIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18227523
- BMoldTrace and repair the source and abate the visible mold condition less then 10 sq ft at east wall in the bathroomIssued Aug 26, 2025 · fix by Sep 30, 2025 overdue · Violation #18193315
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · Violation #18145205
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, and south walls in the kitchenIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18083952
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17887298
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17887299
- BOther repairsProperly repair or replace the broken or defective at ceiling ventilation in the bathroomIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17887300
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 1st room from eastIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17853040
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17853034
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17853035
- BOther repairsProperly repair with similar material the broken or defective wood floor by radiator in the 4th room from eastIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17853036
- BOther repairsProperly repair or replace the broken or defective marble saddle in the bathroomIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17853039
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17853041
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood sink cabinet platform in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17660719
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17660718
- BOther repairsProperly repair with similar material the broken or defective bulging and lifting wood floor [ walk area ] in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17660717
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroomIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17660715
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Apr 8, 2024 · fix by May 4, 2024 overdue · Violation #16819447
- BOther repairsProperly repair with similar material the broken or defective cracked hardwood floor in the 8th room from eastIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16819463
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at the south and east wall. at public hall stairs, 2nd storyIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16819487
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 5th room from east at northIssued Mar 8, 2024 · fix by Apr 12, 2024 overdue · Violation #16721823
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 8, 2024 · fix by Apr 3, 2024 overdue · Violation #16721822
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 26, 2021 · fix by Sep 30, 2021 overdue · Violation #14505436
- BBroken doors or locksReplace with new the broken or defective rubber gasket at refrigerator door in the kitchenIssued Jun 4, 2021 · fix by Jul 9, 2021 overdue · Violation #14368561
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.