Housing violations · Melrose
623 Courtlandt Avenue, Bronx
10451 · 24 apartments · 6 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Other repairs14
- Mold8
- Plumbing, sinks and toilets7
- Leaks and water damage4
- Broken doors or locks3
- Electrical problems1
- Roaches1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 6 closed · NYC typical: 87 days
from 25 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling and behind north wall in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286744
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash at 1st window from north at east wall in the 1st room from east at southIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19286746
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the foyerIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286745
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233209
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft at east and south walls in the 1st room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233210
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233206
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233204
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic wall tiles at east, south, and west walls at bathtub in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233200
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233199
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233203
- BBroken doors or locksProperly repair or replace the broken or defective door at entrance in the 4th room from east at northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233217
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft at north ceiling, north, west, and east walls in the bathroomIssued Sep 22, 2026 · fix by Oct 18, 2026 overdue · Violation #19233201
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft at south and west walls and west wall at closet in the 4th room from…Issued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233213
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from east at southIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233212
- COther repairsFire escape defective. properly secure secure the loose handrails at 3rd story balcony at fire escape preventing an egress hazard at fire escape, 5th storyIssued Aug 3, 2026 · fix by Aug 9, 2026 overdue · rent impairing · Violation #19113893
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash at fire escape in the 1st room from east at southIssued Aug 3, 2026 · fix by Aug 9, 2026 overdue · Violation #19113845
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · rent impairing · Violation #19098988
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles north wall, in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19098987
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles, in the kitchenIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19098986
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, in the kitchenIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19098985
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at south wall, in the 1st room from north at eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19098973
- BPlumbing, sinks and toiletsReplace the broken or defective spout body shower at bathtub, in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · rent impairing · Violation #19098969
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less than 30 sq ft at ceiling at ceiling and all walls in the…Issued Jul 24, 2026 · fix by Aug 19, 2026 overdue · Violation #19104106
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window resess in the 1st room from north at westIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19092842
- CMoldTrace and repair the source and abate the visible mold condition grader than 10 sq feet at ceiling, west, east, north and south wall in the bathroomIssued Jul 24, 2026 · fix by Aug 19, 2026 overdue · Violation #19104108
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082540
- BBroken doors or locksProperly repair or replace the broken or defective entery door at east in the 3rd room from east at northIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082553
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective cabinet at washbasin in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082541
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19082555
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19082556
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082549
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082542
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082544
- BBroken doors or locksProperly repair or replace the broken or defective entry door at south in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082546
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082545
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft around east wall window in the 1st room from east at southIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17800198
- BMoldTrace and repair the source and abate the visible mold condition grader than10 sq feet at east wall in the 1st room from eastIssued Jan 24, 2025 · fix by Feb 28, 2025 overdue · Violation #17648043
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling above east wall window in the 1st room from east at southIssued Nov 29, 2024 · fix by Jan 3, 2025 overdue · Violation #17456202
- COther repairsProperly repair or replace the broken or defective mechanical air vent at west wall in the bathroomIssued Nov 29, 2024 · fix by Dec 5, 2024 overdue · Violation #17456206
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.