Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Mount Hope

1990 Creston Avenue, Bronx

10453 · 58 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
19open immediately hazardous violations · 33 per 100 apartments
B53Hazardous, open
A18Non-hazardous, open
!80Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

10 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company2275 HOLDING LTD
Landlord (head officer or owner)Shimon Greisman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    22
  2. Peeling paint and plaster
    18
  3. Roaches
    11
  4. Broken doors or locks
    9
  5. Leaks and water damage
    7
  6. Missing smoke or CO detector
    6
  7. Plumbing, sinks and toilets
    5
  8. Mice or rats
    5
  9. No heat or hot water
    4
  10. Lead paint
    2
  11. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C82 days
from 47 closed · NYC typical: 87 days
B89 days
from 65 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsRemove all encumbrances consisting of household furniture at floor at public hall, 5th storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19346855
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346852
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19346850
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latchset at door leading to roof and make door self closing at public hall, 6th storyIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19346853
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19346849
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346851
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 5th storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19351497
  • B
    Broken doors or locksProvide an unlockable slide bolt or hook on roof door that allows re-entry from roof to public hall at public hall, 6th storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346854
  • B
    Other repairsProperly repair with similar material the broken or defective counter balance lower sash north window at public hall, 5th storyIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151407
  • B
    Other repairsProperly secure the loose marble tread # 8 from bottom up at public hall stairs, 5th storyIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151401
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink, in the kitchenIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · rent impairing · Violation #19151424
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink, in the kitchenIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · rent impairing · Violation #19151383
  • B
    Other repairsProperly secure the loose marble tread # 10 and 11 from bottom up at public hall stairs, 6th storyIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151397
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub, in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151380
  • B
    Leaks and water damage& 309 m/d law abate the nuisance consisting of water leak at boilerIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151419
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material ceiling at vestibule ( entrance from 1990 creston )Issued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19151415
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 9, 2026 · fix by Aug 4, 2026 overdue · Violation #19058851
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste pipe of the sink , at north wall. in the kitchenIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18711573
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 11, 2025 · fix by Oct 7, 2025 overdue · Violation #18216713
  • B
    Leaks and water damageRepair the leaky and/or defective faucets loose faucet at sink in the kitchenIssued Sep 11, 2025 · fix by Oct 16, 2025 overdue · Violation #18216712
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Aug 6, 2025 · fix by Sep 10, 2025 overdue · Violation #18132269
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 28, 2025 · fix by Aug 23, 2025 overdue · Violation #18125157
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 28, 2025 · fix by Aug 23, 2025 overdue · Violation #18125156
  • B
    Other repairsRefit upper and lower window sashes in the kitchenIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933845
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933850
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north, south, and east walls in the kitchenIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933844
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933847
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and east walls in the bathroomIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933833
  • B
    Plumbing, sinks and toiletsProperly secure the loose counertop and sink to wall in the kitchenIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933849
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 4, 2025 · fix by Jun 4, 2025 overdue · rent impairing · Violation #17933851
  • B
    Other repairsProperly repair or replace the broken or defective spring balances upper and lower sashes in the bathroomIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933834
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north, and east walls in the bathroomIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933837
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued May 27, 2025 · fix by Jun 2, 2025 overdue · Violation #17914147
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tilles at east and north wall in the bathroomIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17914151
  • B
    Other repairsProperly repair or replace the broken or defective lower sash window latch at east and north windows in the 2nd room from north at eastIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17914138
  • B
    Other repairsProperly repair or replace the broken or defective upper and lower sash window spring balances in the kitchenIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17914145
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from north at eastIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17914140
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Mar 26, 2025 · fix by Apr 21, 2025 overdue · rent impairing · Violation #17792240
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 4, 2024 · fix by Apr 30, 2024 overdue · Violation #16818904
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 29, 2024 · fix by Apr 24, 2024 overdue · Violation #16777821
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 1, 2024 · fix by Mar 27, 2024 overdue · Violation #16704370
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 22, 2024 · fix by Mar 19, 2024 overdue · Violation #16688662
  • C
    RoachesAbate the infestation consisting of roachesIssued Nov 17, 2021 · fix by Dec 13, 2021 overdue · Violation #14685917
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 17, 2021 · fix by Jul 13, 2021 overdue · Violation #14391367
  • B
    Broken doors or locksProperly repair the broken or defective mortise door lock in the entranceIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796914
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). that is defectiveIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796916
  • B
    Other repairsProperly repair with similar material the broken or defective concrete and ceramic floor tiles in the bathroomIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796906
  • B
    Lead paintRemove the illegal fastening keyed operated door lock at room leading to fire escape window in the 1st room from north at eastIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · rent impairing · Violation #12796927
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector that is defectiveIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796917
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at showerbody in the bathroomIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796905
  • B
    Plumbing, sinks and toiletsProperly repair the broken or defective wash basin drain line in the bathroomIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796904
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796901
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Dec 11, 2018 · fix by Jan 15, 2019 overdue · Violation #12796898
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings through-out in the entire apartmentIssued Dec 3, 2018 · fix by Jan 7, 2019 overdue · Violation #12782191
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock at room to egress window in the 1st room from north at westIssued Aug 2, 2018 · fix by Sep 6, 2018 overdue · Violation #12502456
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of air conditioner at fire escape window in the 1st room from northIssued Jul 18, 2018 · fix by Aug 22, 2018 overdue · Violation #12481667
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 5, 2018 · fix by Jul 10, 2018 overdue · Violation #12412012
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 5, 2018 · fix by Jul 10, 2018 overdue · Violation #12412020
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 5, 2018 · fix by Jun 13, 2018 overdue · Violation #12412002
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jun 4, 2018 · fix by Jul 9, 2018 overdue · Violation #12410132

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

152017
862018
212019
162020
442021
362022
92023
812024
542025
462026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 533 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.