Housing violations · Fordham Heights
2188 Creston Avenue, Bronx
10453 · 54 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Lead paint17
- Other repairs9
- Plumbing, sinks and toilets4
- Broken doors or locks4
- Roaches3
- Mice or rats2
- Missing smoke or CO detector2
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 47 closed · NYC typical: 87 days
from 41 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119650
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at sink in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119646
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119639
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft at ceiling, north, and east walls in the bathroomIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19119641
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective enamel glaze surface finish at bathtub in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119638
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119637
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119645
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119644
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at north and west walls in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19119640
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at the bathtub in the bathroomIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18820157
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on balcony at building front at 1st fire…Issued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17909032
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in closet in the private hallwayIssued May 21, 2025 · fix by Jun 25, 2025 overdue · Violation #17912303
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued May 21, 2025 · fix by Jun 25, 2025 overdue · Violation #17912304
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Apr 10, 2025 · fix by May 4, 2025 overdue · Violation #17823726
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 9, 2025 · fix by May 5, 2025 overdue · Violation #17813249
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 9, 2025 · fix by May 5, 2025 overdue · Violation #17813250
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17813237
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperable in the entire apartmentIssued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17813248
- BMissing smoke or CO detectorRepair or replace the smoke detector inoperable in the entire apartmentIssued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17813247
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Apr 9, 2025 · fix by May 14, 2025 overdue · Violation #17813230
- BOther repairsProperly secure the loose upper wood cabinets at north wall. in the kitchenIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805623
- BOther repairsProperly repair with similar material the broken or defective erroed wood plank flooring missing in the private hallwayIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805622
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south and west walls in the private hallwayIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805621
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 23, 2024 · fix by Jun 18, 2024 overdue · Violation #16990496
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 23, 2022 · fix by Apr 16, 2022 overdue · Violation #15071705
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 22, 2022 · fix by Apr 15, 2022 overdue · Violation #15071203
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 22, 2022 · fix by Apr 15, 2022 overdue · Violation #15071197
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 22, 2022 · fix by Apr 15, 2022 overdue · Violation #15071199
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 22, 2022 · fix by Apr 15, 2022 overdue · Violation #15071200
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 22, 2022 · fix by Apr 15, 2022 overdue · Violation #15071202
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 15, 2021 · fix by Jan 19, 2022 overdue · Violation #14729078
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 15, 2021 · fix by Jan 19, 2022 overdue · Violation #14729080
- BLead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Dec 15, 2021 · fix by Jan 19, 2022 overdue · Violation #14729079
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Nov 19, 2021 · fix by Nov 23, 2021 overdue · Violation #14687080
- BLead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 19, 2021 · fix by Dec 24, 2021 overdue · Violation #14687084
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 19, 2021 · fix by Dec 24, 2021 overdue · Violation #14687086
- BLead paintAnd 27-2056.17 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 19, 2021 · fix by Dec 24, 2021 overdue · Violation #14687087
- BLead paintAnd 27-2056.17 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 19, 2021 · fix by Dec 24, 2021 overdue · Violation #14687088
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Nov 12, 2021 · fix by Nov 16, 2021 overdue · Violation #14677194
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 21, 2021 · fix by Jul 15, 2021 overdue · Violation #14396223
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 4, 2019 · fix by Nov 25, 2019 overdue · Violation #13399836
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2019 · fix by Nov 25, 2019 overdue · Violation #13399835
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.