Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Fordham Heights

2264 Creston Avenue, Bronx

10453 · 60 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
10open immediately hazardous violations · 17 per 100 apartments
B18Hazardous, open
A13Non-hazardous, open
!41Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyREEDY ASSOCIATES LLC D

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    12
  2. Peeling paint and plaster
    8
  3. Other repairs
    7
  4. Lead paint
    6
  5. Broken doors or locks
    3
  6. Roaches
    2
  7. Missing smoke or CO detector
    1
  8. Plumbing, sinks and toilets
    1
  9. Leaks and water damage
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C47 days
from 26 closed · NYC typical: 87 days
B106 days
from 45 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblies at compactor closet door at 1st story public hallIssued May 15, 2026 · fix by Jun 19, 2026 overdue · Violation #18938614
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 5th room from east at northIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18707002
  • C
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective rotted washbasin cabinet in the 2nd bathroomIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18707008
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the 2nd bathroomIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18707010
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of lockable slidebolt installed at door interior in the entranceIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18707001
  • B
    Lead paintFire egress defective. remove the obstruction in fireproof passageway the slide bolt cabaple of being pad locked installed at gate leading to side walk at fire…Issued Mar 26, 2025 · fix by Apr 30, 2025 overdue · rent impairing · Violation #17781806
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 2nd storyIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17781799
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 26, 2025 · fix by Apr 21, 2025 overdue · Violation #17781792
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17330253
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at east wall in the kitchenIssued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17239824
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16672428
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 6th storyIssued Feb 8, 2024 · fix by Mar 14, 2024 overdue · Violation #16656902
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 27, 2023 · fix by Oct 21, 2023 overdue · Violation #16257047
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 26, 2023 · fix by Oct 20, 2023 overdue · Violation #16256349
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 26, 2023 · fix by Oct 20, 2023 overdue · Violation #16256354
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 26, 2023 · fix by Oct 20, 2023 overdue · Violation #16256355
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 26, 2023 · fix by Oct 22, 2023 overdue · Violation #16243855
  • B
    MoldTrace and repair the source and abate the visible mold condition aprx 8 sq feet at west wall in the 1st room from north at westIssued Dec 6, 2022 · fix by Jan 10, 2023 overdue · Violation #15600997
  • B
    MoldTrace and repair the source and abate the visible mold condition aprx 2 sq feet at ceiling , 6 sq feet at south and 4 sq feet at west walls in the bathroomIssued Aug 8, 2022 · fix by Sep 12, 2022 overdue · Violation #15292789
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 3 sqft at west wall, approx. 1 sqft at south wall in the private hallwayIssued Jul 23, 2021 · fix by Aug 27, 2021 overdue · Violation #14458459
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 4 sqft at south wall in the kitchenIssued Jul 23, 2021 · fix by Aug 27, 2021 overdue · Violation #14458458
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 8 sqft at east wall in the 1st room from east at southIssued Jul 23, 2021 · fix by Aug 27, 2021 overdue · Violation #14458460
  • B
    MoldTrace and repair the source and abate the visible mold condition at north wall ( apprx 18 sq ft ) in the bathroomIssued Jan 8, 2021 · fix by Feb 12, 2021 overdue · Violation #13971440
  • B
    MoldTrace and repair the source and abate the visible mold condition at the ceiling approx 4 sq ft and at the west wall approx 6 sq ft. in the bathroomIssued Jul 27, 2020 · fix by Aug 31, 2020 overdue · Violation #13737910
  • B
    MoldTrace and repair the source and abate the visible mold condition aprox. 25 sq. ft. at north wall, east wall, ceiling in the 2nd bathroom from east at northIssued Aug 29, 2019 · fix by Oct 3, 2019 overdue · Violation #13246023
  • B
    MoldTrace and repair the source and abate the visible mold condition aprox. 12 sq. ft at 1st closet from north at east wall wall in the 3rd room from east at northIssued Aug 29, 2019 · fix by Oct 3, 2019 overdue · Violation #13246021
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at south, east & west walls in the kitchenIssued Nov 27, 2015 · fix by Jan 1, 2016 overdue · Violation #11014619
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at south wall in the kitchenIssued Feb 2, 2015 · fix by Mar 9, 2015 overdue · Violation #10525303

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

212017
122018
402019
232020
212021
152022
232023
332024
272025
332026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 940 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.