Housing violations · Fordham Heights
2320 Creston Avenue, Bronx
10468 · 43 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks37
- Other repairs20
- Mice or rats16
- Roaches13
- Peeling paint and plaster13
- Plumbing, sinks and toilets8
- Lead paint7
- Mold6
- Missing smoke or CO detector5
- Leaks and water damage5
- Electrical problems1
- No heat or hot water1
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 46 closed · NYC typical: 87 days
from 114 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at vestibule door at public hall, 1st storyIssued Nov 16, 2026 · Violation #19373387
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19313732
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 22, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19313733
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19185780
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129651
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Aug 12, 2026 · fix by Aug 26, 2026 overdue · Violation #19129653
- BLead paintProperly repair or replace the broken or defective intercom return system leading from building entrance up to south wall panel in the foyerIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129650
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the kitchenIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19124301
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19082477
- BBroken doors or locksProvide provide glass in place of plexi installed at 1st 2nd and 3rd glass pane at door from strret to vestibule at public hall, 1st storyIssued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19068323
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi installed at 1st 2nd and 3rd glass pane from north at east at street to vestibule door at public hall, 1st…Issued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19068322
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to south wall in the foyerIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18980072
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jun 4, 2026 · fix by Jun 28, 2026 overdue · Violation #18988389
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from east at northIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · rent impairing · Violation #18978893
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the east wall in the 3rd room from northIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978891
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 1st room from north at eastIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978885
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the north wall in the private hallwayIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978889
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978890
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east at northIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978892
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at eastIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978883
- BOther repairsProperly repair or replace the broken or defective intercom system from the building entrance to the panel at east wall in the foyerIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978888
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 3rd room from northIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18978887
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at vestibule door , 1st storyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18937347
- BBroken doors or locksProvide approved glass at vestibule door , 1st storyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18937348
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door , 1st storyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18937349
- BBroken doors or locksProvide approved glass at building entrance door , 1st storyIssued May 20, 2026 · fix by Jun 24, 2026 overdue · Violation #18937350
- BElectrical problemsProperly repair or replace the broken or defective (inoperative ) electrical light fixture on the ceiling at compactor closet, 6th storyIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18763741
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 6th storyIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18738802
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling and east wall at bulkheadIssued Mar 27, 2026 · fix by May 1, 2026 overdue · rent impairing · Violation #18738770
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and east wall at bulkheadIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18738778
- COther repairsProperly repair with similar material the broken or defective 3rd marble stair tread from bottom at public hall stairs, 1st storyIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18738818
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling and east wall at public hall, 6th storyIssued Mar 27, 2026 · fix by May 1, 2026 overdue · rent impairing · Violation #18738799
- COther repairsProperly repair or replace the broken or defective glass pane at lower window sash, first window from east at north at public hall, 5th storyIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18738811
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor room doorIssued Mar 24, 2026 · fix by Apr 7, 2026 overdue · Violation #18738737
- BBroken doors or locksProperly repair or replace the broken or defective latch set at west exit doorIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18738752
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 24, 2026 · fix by Apr 7, 2026 overdue · Violation #18738758
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 24, 2026 · fix by Apr 7, 2026 overdue · Violation #18738703
- BBroken doors or locksProvide approve glass at vestibule door( from vestibule door to public hall) at public hall, 1st storyIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18662041
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass at vestibule door( from vestibule door to public hall) at public hall, 1st storyIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18662040
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass at building entrance door ( from street to vestibule door) at public hall, 1st storyIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18662038
- BBroken doors or locksProvide approved glass at building entrance door ( from street to vestibule door) at public hall, 1st storyIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18662039
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass at building entrance door ( from street to vestibule door) at public hall, 1st storyIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18653462
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass at vestibule door ( from vestibule door to public hall) at public hall, 1st storyIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18653464
- BBroken doors or locksProvide an approve glass at building entrance door ( from street to vestibule door) at public hall, 1st storyIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18653463
- BBroken doors or locksProvide an approve glass at vestibule door ( from vestibule door to public hall) at public hall, 1st storyIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18653465
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling and all walls in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18275708
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 6, 2025 · fix by Sep 1, 2025 overdue · Violation #18138051
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel reglaze at bathtub in the bathroomIssued Jul 8, 2025 · fix by Aug 12, 2025 overdue · Violation #18067084
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Jul 7, 2025 · fix by Jul 21, 2025 overdue · Violation #18067086
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 4, 2025 · fix by Jun 30, 2025 overdue · Violation #17936556
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 4, 2025 · fix by Jun 30, 2025 overdue · Violation #17936555
- BBroken doors or locksReplace with new the missing hopper door handle at compactor closet, 6th storyIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17936560
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Mar 24, 2025 · fix by Apr 7, 2025 overdue · Violation #17784040
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Mar 24, 2025 · fix by Apr 7, 2025 overdue · Violation #17784031
- CMoldTrace and repair the source and abate the visible mold condition and mildew at east wall and ceiling approx 15 sq feet in the bathroomIssued Mar 17, 2025 · fix by Apr 12, 2025 overdue · Violation #17768443
- COther repairsProvide pushbar with re-entry from roof to bulkhead at 1st public hall bulkhead from northIssued Mar 17, 2025 · fix by Mar 23, 2025 overdue · Violation #17767760
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 4th room from eastIssued Mar 17, 2025 · fix by Mar 23, 2025 overdue · Violation #17767756
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of all plexe glass installed at door from street to vestibule at public hallIssued Dec 4, 2024 · fix by Dec 10, 2024 overdue · Violation #17498916
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of all plexe glass installed at upper pane at door from vestibule to public hall 1st story at public hallIssued Dec 4, 2024 · fix by Dec 10, 2024 overdue · Violation #17498918
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 1, 2024 · fix by Nov 27, 2024 overdue · Violation #17388627
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.