Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Tremont

887 Crotona Park North, Bronx

10460 · 30 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 87 per 100 apartments
B67Hazardous, open
A16Non-hazardous, open
!109Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyCARROLL BURKE DEVELOPMENT CORP.

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    24
  2. Peeling paint and plaster
    24
  3. Roaches
    14
  4. Plumbing, sinks and toilets
    9
  5. Broken doors or locks
    8
  6. Mice or rats
    8
  7. Missing smoke or CO detector
    8
  8. Mold
    7
  9. Leaks and water damage
    5
  10. Electrical problems
    2
  11. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C124 days
from 29 closed · NYC typical: 87 days
B131 days
from 39 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsRemove all encumbrances consisting of dog kennel and chair impeding egress at bulkhead stairs at public hall stairs, 5th storyIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19281400
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18939376
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the 4th room from eastIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501574
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th room from eastIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18501576
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501598
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at southIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18501553
  • C
    Other repairsProperly repair or replace the broken or defective air release valve at radiator in the kitchenIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501550
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501563
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from eastIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18501564
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18501565
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18501566
  • C
    Other repairsProperly repair or replace the broken or defective air release valve at radiator in the 4th room from eastIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501581
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267319
  • B
    Electrical problemsProperly repair or replace the broken or defective gfci outlet at west wall in the kitchenIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267313
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18267307
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of vinyl floor tiles in the kitchenIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267315
  • B
    Other repairsRemove all obstructions and repair all defects in at bath tub in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · rent impairing · Violation #18267317
  • B
    Other repairsProperly repair or replace the broken or defective ceiling light fixture in the 1st room from eastIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267322
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from eastIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267324
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jul 9, 2025 · fix by Aug 2, 2025 overdue · Violation #18081362
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak active leak at celing in the 1st room from northIssued Apr 11, 2025 · fix by Apr 17, 2025 overdue · Violation #17824324
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17824325
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperable in the entire apartmentIssued Jan 22, 2025 · fix by Feb 26, 2025 overdue · Violation #17637214
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector inoperable in the entire apartmentIssued Jan 22, 2025 · fix by Feb 26, 2025 overdue · Violation #17637215
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from east at southIssued Aug 6, 2024 · fix by Sep 10, 2024 overdue · Violation #17171912
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north at westIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080118
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north at eastIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080117
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles floor in the 2nd room from north at eastIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080116
  • B
    Broken doors or locksProperly repair with similar material the broken or defective door in the bathroomIssued Jun 27, 2024 · fix by Aug 1, 2024 overdue · Violation #17080114
  • B
    MoldProperly repair with similar material the broken or defective wood molding at floor in the 1st room from northIssued Jun 26, 2023 · fix by Jul 31, 2023 overdue · Violation #16058564
  • B
    MoldTrace and repair the source and abate the visible mold condition at the south wall ,and ceiling approx. 4sq.ft. in the bathroomIssued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15778961
  • B
    MoldTrace and repair the source and abate the visible mold condition at the ceiling aprox. 3 sq.ft. in the private hallwayIssued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15778962
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 14, 2022 · fix by Dec 10, 2022 overdue · Violation #15496899
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from northIssued Nov 14, 2022 · fix by Dec 19, 2022 overdue · Violation #15497954
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15497959
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15496893
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15496892
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15497963
  • B
    Plumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color the base cabinet at sink in the kitchenIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15497964
  • C
    MoldTrace and repair the source and abate the visible mold condition ceiling in the bathroomIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15497971
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15497960
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15497955
  • C
    MoldTrace and repair the source and abate the visible mold condition 8 sqft at east and 10 sq feet at ceiling in the kitchenIssued Oct 25, 2022 · fix by Nov 20, 2022 overdue · Violation #15449482
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 4, 2022 · fix by May 30, 2022 overdue · Violation #15139962
  • B
    Other repairsProperly repair the broken or defective intercom system fromIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139958
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139960
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139951
  • B
    Broken doors or locksProperly repair the broken or defective lower window sash lock at fierescape window at west wall in the 1st room from north at westIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139953
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall and ceiling in the 2nd room from north at eastIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139952
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139954
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 10 sq. ft. at ceiling in the bathroomIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139955
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued May 4, 2022 · fix by Jun 8, 2022 overdue · Violation #15139959
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 4, 2022 · fix by May 30, 2022 overdue · Violation #15139961
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 26, 2022 · fix by May 22, 2022 overdue · Violation #15121012
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 26, 2022 · fix by May 22, 2022 overdue · Violation #15121013
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from eastIssued Apr 26, 2022 · fix by May 31, 2022 overdue · Violation #15121023
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Apr 4, 2022 · fix by May 9, 2022 overdue · Violation #15093202
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at shower compartment in the bathroomIssued Dec 14, 2021 · fix by Jan 18, 2022 overdue · Violation #14729764
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of locking device at door to fire escape in the 2nd room from northIssued Dec 14, 2021 · fix by Jan 18, 2022 overdue · Violation #14729784
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Dec 14, 2021 · fix by Jan 18, 2022 overdue · Violation #14729769

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

212017
42018
382019
82020
1082021
782022
412023
212024
732025
82026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 596 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.