Housing violations · Morrisania
672 Crotona Park South, Bronx
10456 · 8 apartments · 4 stories · City Council district 16
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs23
- Peeling paint and plaster14
- Missing smoke or CO detector12
- Broken doors or locks10
- Leaks and water damage8
- No heat or hot water7
- Mice or rats7
- Roaches7
- Plumbing, sinks and toilets5
- Mold2
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 15 closed · NYC typical: 87 days
from 20 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 9, 2026 · fix by Jan 9, 2026 overdue · rent impairing · Violation #18558343
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste lines at wash basin in the 2nd bathroom from northIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · rent impairing · Violation #18558347
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 9, 2026 · fix by Jan 15, 2026 overdue · Violation #18558346
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the 1st bathroom from northIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · rent impairing · Violation #18558344
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18443848
- BOther repairsReplace with new the missing light fixture cover at ceiling in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443853
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18443845
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443851
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443852
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443849
- BPlumbing, sinks and toiletsRepair the broken or defective connection at sinkbase waste line in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443846
- BOther repairsProperly repair or replace the broken or defective caulking around tub in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18443844
- COther repairsProperly repair or replace the broken or defective hydronic baseboard cover defective , at west wall in the 3rd room from northIssued Nov 24, 2025 · fix by Nov 30, 2025 overdue · Violation #18368498
- BOther repairsProperly repair or replace the broken or defective hydronic baseboard cover defective at north wall in the 1st room from northIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18368496
- COther repairsProperly repair or replace the broken or defective hydronic baseboard cover defective at west wall in the 2nd room from northIssued Nov 24, 2025 · fix by Nov 30, 2025 overdue · Violation #18368497
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at sink in the kitchenIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · rent impairing · Violation #18368488
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 17, 2025 · fix by Dec 13, 2025 overdue · Violation #18368493
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 17, 2025 · fix by Nov 23, 2025 overdue · Violation #18368500
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368495
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368494
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 2nd room from northIssued Nov 17, 2025 · fix by Nov 15, 2025 overdue · rent impairing · Violation #18368482
- COther repairsProperly repair or replace the broken or defective lower sash window at south wall at public hall stairs, 2nd storyIssued Nov 17, 2025 · fix by Nov 23, 2025 overdue · Violation #18368501
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at all walls at south wall inside closet. in the foyerIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368499
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at refrigerator doors in the kitchenIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368490
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 17, 2025 · fix by Dec 13, 2025 overdue · Violation #18368492
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368487
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · rent impairing · Violation #18368486
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368485
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368484
- BOther repairsProperly repair or replace the broken or defective mechanical vent at south wall in the bathroomIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368483
- BOther repairsProperly repair or replace the broken or defective basecabinet floor at west wall in the kitchenIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18368489
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18117064
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18117066
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094702
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094701
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiiling in the 1st room from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094699
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094700
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094703
- BBroken doors or locksProperly repair or replace the broken or defective door in the 3rd room from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094708
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094707
- BOther repairsProperly repair or replace the broken or defective lower sash window spring balance in the 1st room from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094706
- BOther repairsProperly repair or replace the broken or defective intercom system from entrance of the building toIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094705
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18094704
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 27, 2025 · fix by May 1, 2025 overdue · Violation #17783110
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 27, 2025 · fix by May 1, 2025 overdue · Violation #17783111
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Dec 10, 2024 · fix by Jan 14, 2025 overdue · Violation #17533625
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 10, 2024 · fix by Dec 10, 2024 overdue · rent impairing · Violation #17533622
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 10, 2024 · fix by Dec 16, 2024 overdue · Violation #17533623
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges on fire rated door in the entranceIssued Dec 6, 2024 · fix by Dec 20, 2024 overdue · Violation #17512405
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 6, 2024 · fix by Jan 10, 2025 overdue · Violation #17512401
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Dec 6, 2024 · fix by Jan 10, 2025 overdue · Violation #17512402
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 6, 2024 · fix by Dec 6, 2024 overdue · rent impairing · Violation #17512399
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Dec 6, 2024 · fix by Dec 12, 2024 overdue · Violation #17512400
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 6, 2024 · fix by Dec 6, 2024 overdue · rent impairing · Violation #17512398
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 25, 2024 · fix by Nov 25, 2024 overdue · rent impairing · Violation #17441108
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak behind east wall at 1st public hall bulkhead from northIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17441105
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at ceiling and east wall at 1st public hall bulkhead from northIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17441106
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17441112
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17441115
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 25, 2024 · fix by Dec 21, 2024 overdue · Violation #17441116
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.