Housing violations · Allerton
2528 Cruger Avenue, Bronx
10467 · 42 apartments · 6 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs6
- Broken doors or locks3
- Mice or rats2
- Roaches2
- Electrical problems1
- Peeling paint and plaster1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 16 closed · NYC typical: 87 days
from 20 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BElectrical problemsProperly repair or replace the broken or defective electric outlet at north wall in the 1st room from eastIssued Dec 11, 2025 · fix by Jan 15, 2026 overdue · Violation #18496000
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Dec 11, 2025 · fix by Jan 15, 2026 overdue · Violation #18496001
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Dec 11, 2025 · fix by Jan 15, 2026 overdue · Violation #18496002
- BOther repairsProperly secure the loose window stool at 1st window from south at west in the 2nd room from eastIssued Dec 11, 2025 · fix by Jan 15, 2026 overdue · Violation #18495999
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2024 · fix by May 11, 2024 overdue · Violation #16851804
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2024 · fix by May 11, 2024 overdue · Violation #16851806
- BOther repairs& 309 m/d law abate the nuisance consisting of heavy desk at fire escape window impeeding secondary egress in the 1st room from eastIssued Dec 11, 2023 · fix by Jan 15, 2024 overdue · Violation #16509246
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2023 · fix by Dec 9, 2023 overdue · Violation #16376291
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 13, 2023 · fix by Dec 9, 2023 overdue · Violation #16376290
- CBroken doors or locksRemove the illegal fastening an unacceptable electro-magnetic locking device installed at vestibule door to the building at public hallIssued Sep 6, 2023 · fix by Sep 12, 2023 overdue · rent impairing · Violation #9523140
- BOther repairsProperly repair the broken or defective paving at east yardIssued Sep 6, 2023 · fix by Oct 11, 2023 overdue · Violation #7189412
- BOther repairsD26-10.01 adm code properly repair with similar material the broken or defective clg front & rear south fire passagewayIssued Sep 6, 2023 · fix by Oct 11, 2023 overdue · Violation #457633
- BBroken doors or locksProvide an acceptable heavy duty lock and latch set to the building entrance door at public hallIssued Sep 6, 2023 · fix by Oct 11, 2023 overdue · Violation #9523150
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.