Housing violations · University Heights (South)-Morris Heights
2265 Davidson Avenue, Bronx
10453 · 49 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs30
- Peeling paint and plaster22
- Leaks and water damage12
- Roaches12
- Missing smoke or CO detector10
- Plumbing, sinks and toilets9
- Mice or rats8
- Broken doors or locks7
- Mold4
- Electrical problems2
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 46 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective mechanical stopper at bathtub in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333218
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, and west walls in the 1st room from north at eastIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333224
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333223
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the 1st room from north at westIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333222
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333221
- BMoldTrace and repair the source and abate the visible mold condition observed greater than 10 sq. ft at north wall in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333220
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19333219
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19246268
- BLeaks and water damageRepair the leaky and/or defective faucets at the bath tub in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19246267
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221438
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221439
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19221437
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19221432
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221440
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221441
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin sink in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221433
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around wash basin sink in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221434
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221435
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221436
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 29, 2026 · fix by Jul 25, 2026 overdue · Violation #19035591
- BOther repairsProperly repair or replace the broken or defective light fixure at the ceiling in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18808615
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 24, 2026 · fix by May 20, 2026 overdue · Violation #18808612
- BOther repairsProperly repair or replace the broken or defective at lower cabnet west wall in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18808609
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 24, 2026 · fix by May 20, 2026 overdue · Violation #18808613
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18808614
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 24, 2026 · fix by May 20, 2026 overdue · Violation #18808627
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the west wall in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18808608
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18808611
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18808610
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 24, 2026 · fix by May 20, 2026 overdue · Violation #18808628
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18507024
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18507022
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18299535
- BOther repairsProperly repair or replace the broken or defective missing (grout) at east wall and south wall (near water closet) in the bathroomIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18299532
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18299536
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Oct 16, 2025 · fix by Nov 20, 2025 overdue · Violation #18299533
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceilimg and west wall in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18300792
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective vestabule door at public hall, 2nd storyIssued Oct 6, 2025 · fix by Oct 20, 2025 overdue · Violation #18276934
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18242785
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18242782
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18242781
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18242786
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2025 · fix by Aug 31, 2025 overdue · Violation #18131745
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective missing door at vestibule , 1st storyIssued Jul 29, 2025 · fix by Aug 12, 2025 overdue · Violation #18126628
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective vanity at washbasin in the bathroomIssued Jul 22, 2025 · fix by Aug 26, 2025 overdue · Violation #18104269
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Jul 22, 2025 · fix by Aug 26, 2025 overdue · rent impairing · Violation #18104267
- BMoldTrace and repair the source and abate the visible mold condition at ceiling , north and east wall in the bathroomIssued Jul 22, 2025 · fix by Aug 26, 2025 overdue · Violation #18104268
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchenIssued Jul 22, 2025 · fix by Aug 26, 2025 overdue · Violation #18104266
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the foyerIssued Jul 22, 2025 · fix by Aug 26, 2025 overdue · Violation #18104271
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 16, 2025 · fix by Jul 12, 2025 overdue · Violation #18010320
- BOther repairsRemove all encumbrances consisting of air conditioner unit on floor at public hall, 2nd story, section ''f-j'', 2nd from west at northIssued May 15, 2025 · fix by Jun 19, 2025 overdue · rent impairing · Violation #17891755
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893308
- BOther repairsProperly repair or replace the broken or defective voice return intercom system from building entrance to intercom box in the south wall in the private hallwayIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893309
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the kitchenIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893310
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing the bathtub in the bathroomIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893311
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893312
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 16, 2025 · fix by Jan 30, 2025 overdue · Violation #17624262
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 12, 2024 · fix by Jan 7, 2025 overdue · Violation #17549000
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 12, 2024 · fix by Jan 7, 2025 overdue · Violation #17549001
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the kitchenIssued Oct 28, 2024 · fix by Dec 2, 2024 overdue · Violation #17371567
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.