Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Fordham Heights

2344 Davidson Avenue, Bronx

10468 · 60 apartments · 6 stories · City Council district 14

By · Updated · Data from NYC HPD

C
224open immediately hazardous violations · 373 per 100 apartments
B433Hazardous, open
A140Non-hazardous, open
!777Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

48 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    206
  2. Other repairs
    167
  3. Mice or rats
    60
  4. Leaks and water damage
    57
  5. Missing smoke or CO detector
    55
  6. Roaches
    51
  7. Plumbing, sinks and toilets
    50
  8. Mold
    48
  9. Broken doors or locks
    47
  10. Lead paint
    33
  11. No heat or hot water
    10
  12. Electrical problems
    10
  13. Missing window guards
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C183 days
from 248 closed · NYC typical: 84 days
B233 days
from 162 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the entire apartmentNotice not sent yet · Violation #19383859
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northNotice not sent yet · Violation #19383865
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and latch at building entrance door at public hall, 1st storyNotice not sent yet · Violation #19383940
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376643
  • B
    Other repairsProperly secure the loose radiator cover in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19371232
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19371230
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376645
  • C
    Mice or ratsAbate the infestation consisting of mice at public hallIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19376157
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at window frame from west at north wall in the 1st room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376536
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at south wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376535
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at north wall in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376534
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures outlet at east wall in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19371236
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures lamp at south wall in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19371234
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19376621
  • C
    Other repairsProperly repair with similar material the broken or defective 8th and 9th metal pan up from bottom at bulkhead stairs to roof at public hall, 6th storyIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19324237
  • B
    Other repairsReplace with new the missing radiator cover at south wall at public hall, 5th storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324224
  • B
    Other repairsProperly repair or replace the broken or defective glass pane at lower sash window at south wall at public hall, 5th storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324222
  • B
    Other repairsProperly repair or replace the broken or defective glass pane at lower window sash, at south wall at public hall, 6th storyIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324230
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling closet at west wall in the 3rd room from eastIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288407
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288439
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288440
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288434
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288433
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288431
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 9, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19288446
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288430
  • C
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the private hallwayIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288429
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288422
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the 3rd bathroom from eastIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19288419
  • B
    Broken doors or locksFire egress defective. remove the obstruction in fireproof passageway household items blocking east fire passageway at east yardIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · rent impairing · Violation #19288487
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd bathroom from eastIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288417
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd bathroom from eastIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288414
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color throughout all walls and ceiling at closet at west wall in the 3rd room from eastIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19288408
  • C
    Other repairsProperly repair or replace the broken or defective glass pane upper window sash 1st window from south at west wall in the 4th room from northIssued Oct 2, 2026 · fix by Oct 8, 2026 overdue · Violation #19267801
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the bathroomIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178150
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet cover plate at north wall in the 4th room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178143
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the 4th room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178142
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroomIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178149
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the private hallwayIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178148
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash window 1st from north at east wall in the 4th room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178135
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and west walls in the 4th room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178136
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south and west walls in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178137
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178138
  • B
    Other repairsProperly repair or replace the broken or defective window frame sill 1st from south at west wall in the 1st room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178146
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall and east wall in the 1st room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178145
  • B
    Other repairsProperly repair with similar material the broken or defective the ceramic tiles at south wall in the bathroomIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178151
  • B
    Other repairsProperly repair or replace the broken or defective wall cabinet at north wall in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178139
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19178140
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west and north walls in the 4th room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178144
  • C
    Other repairsProperly repair or replace the broken or defective both inner and outer glass panes at lower sash window 1st from north at east wall in the 4th room from northIssued Sep 2, 2026 · fix by Sep 8, 2026 overdue · Violation #19178134
  • C
    Broken doors or locksProperly repair or replace the broken or defective fire proof door with peephole and chain door guard in the entranceIssued Sep 2, 2026 · fix by Sep 8, 2026 overdue · Violation #19178133
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178132
  • B
    Leaks and water damageRepair the leaky and/or defective water supply pipe waste line at wash basin in the bathroomIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19178131
  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178130
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19178141
  • B
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · rent impairing · Violation #19067127
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 1st room from northIssued Jul 14, 2026 · fix by Jul 20, 2026 overdue · Violation #19067133
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19067138
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19067137
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19067122

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

3182017
1912018
1262019
12020
1262021
1092022
2932023
4452024
2792025
1172026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 2,378 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.