Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2839 Decatur Avenue, Bronx

10458 · 39 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
25open immediately hazardous violations · 64 per 100 apartments
B53Hazardous, open
A6Non-hazardous, open
!74Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyGNF PROPERTIES CO LLC
Landlord (head officer or owner)Avni Gecaj

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    20
  2. Missing smoke or CO detector
    13
  3. Lead paint
    10
  4. Peeling paint and plaster
    10
  5. Broken doors or locks
    7
  6. Plumbing, sinks and toilets
    7
  7. Roaches
    7
  8. Mice or rats
    3
  9. No heat or hot water
    3
  10. Mold
    2
  11. Leaks and water damage
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C92 days
from 9 closed · NYC typical: 87 days
B92 days
from 6 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19373861
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 16, 2026 · rent impairing · Violation #19373859
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356604
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356613
  • B
    Broken doors or locksReplace with new the missing latch set at closet door in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356608
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 2nd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356610
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19356612
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19178863
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at sink in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19178864
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 2, 2026 · fix by Sep 28, 2026 overdue · Violation #19178862
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective cabinet at sink in the kitchenIssued Jun 17, 2026 · fix by Jul 22, 2026 overdue · Violation #19007451
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 17, 2026 · fix by Jul 13, 2026 overdue · Violation #19007447
  • B
    Other repairsAbate the nuisance consisting of excessive storage of material , household items in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17930421
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17930420
  • B
    Lead paint& 309 m/d law abate the nuisance consisting of plastic bags and other household items blocking window leading to fire escape in the 3rd room from east at northIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17930424
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at washbasin in the bathroomIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · rent impairing · Violation #17930423
  • C
    Other repairsProperly repair with similar material the broken or defective cabinet coming off wall in the kitchenIssued Dec 6, 2024 · fix by Dec 12, 2024 overdue · Violation #17540339
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from north at eastIssued Mar 25, 2024 · fix by Apr 29, 2024 overdue · Violation #16767786
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Mar 25, 2024 · fix by Apr 29, 2024 overdue · Violation #16767787
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 25, 2024 · fix by Apr 20, 2024 overdue · Violation #16767788
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 25, 2024 · fix by Apr 20, 2024 overdue · Violation #16767789
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in clogged wasteline at sink in the kitchenIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · rent impairing · Violation #16551297
  • B
    Other repairsAbate the nuisance consisting of excessive storage of material excessive household items throughout in the entire apartmentIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · Violation #16551293
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · Violation #16551294
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jan 2, 2024 · fix by Feb 6, 2024 overdue · Violation #16551295
  • B
    Broken doors or locksReplace with new the missing metal strike plate at building entrance door . , 1st story, section ''2837''Issued Dec 26, 2023 · fix by Jan 30, 2024 overdue · Violation #16540322
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door from vestibule at public hall, 1st storyIssued Feb 2, 2023 · fix by Feb 16, 2023 overdue · Violation #15698127
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748607
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748606
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748605
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748610
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 22, 2021 · fix by Jan 17, 2022 overdue · Violation #14748542
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 22, 2021 · fix by Jan 17, 2022 overdue · Violation #14748541
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748608
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748611
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748612
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Dec 22, 2021 · fix by Jan 15, 2022 overdue · Violation #14748609
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 19, 2021 · fix by Sep 14, 2021 overdue · Violation #14491030
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 6, 2020 · fix by Dec 11, 2020 overdue · Violation #13882001
  • C
    Lead paintProperly repair the broken or defective counter balance of lower sash of window leading to fire escape in the kitchenIssued Sep 1, 2020 · fix by Sep 7, 2020 overdue · Violation #13791292
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2020 · fix by Sep 8, 2020 overdue · Violation #13761818
  • B
    Other repairsProperly repair the broken or defective lower window sash balaces at west wall in the kitchenIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13760665
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line under sink in the kitchenIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13761846
  • B
    Other repairsProperly repair the broken or defective bell buzzer, intercom from building entrance to apartmentIssued Aug 10, 2020 · fix by Sep 14, 2020 overdue · Violation #13758884
  • B
    Other repairsReplace with new the broken or defective lower sash window counter balances. in the 1st room from eastIssued Aug 10, 2020 · fix by Sep 14, 2020 overdue · Violation #13758883
  • B
    Other repairsReplace with new the broken or defective lower sash window counter balances. in the kitchenIssued Aug 10, 2020 · fix by Sep 14, 2020 overdue · Violation #13758882
  • B
    Other repairsProperly repair the broken or defective intercom/ buzzer from builkding entrance toIssued Jun 8, 2020 · fix by Jul 13, 2020 overdue · Violation #13682057
  • B
    Other repairsReplace with new the broken or defective spring balance for upper and lower sash window in the kitchenIssued Jun 8, 2020 · fix by Jul 13, 2020 overdue · Violation #13682062
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 6, 2020 · fix by Apr 4, 2020 overdue · rent impairing · Violation #13661787
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Feb 26, 2020 · fix by Apr 1, 2020 overdue · Violation #13618161
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Feb 26, 2020 · fix by Apr 1, 2020 overdue · Violation #13618156
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Feb 26, 2020 · fix by Apr 1, 2020 overdue · Violation #13618154
  • B
    Other repairsReplace with new the broken or defective air - valve at steam -radiator in the 2nd room from northIssued Jan 13, 2020 · fix by Feb 17, 2020 overdue · Violation #13543365
  • B
    Other repairsRepair the broken or defective connection at shut -off valve of steam -radiator in the 2nd room from northIssued Jan 13, 2020 · fix by Feb 17, 2020 overdue · Violation #13543363
  • B
    MoldTrace and repair the source and abate the visible mold condition aprx 8 sq feet at ceiling and walls in the bathroomIssued Nov 22, 2019 · fix by Dec 27, 2019 overdue · Violation #13465395
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at west wall in the bathroomIssued Aug 9, 2019 · fix by Sep 13, 2019 overdue · Violation #13210536
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Aug 9, 2019 · fix by Sep 13, 2019 overdue · Violation #13210534
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missingIssued Aug 9, 2019 · fix by Sep 13, 2019 overdue · Violation #13210535
  • B
    MoldTrace and repair the source and abate the visible mold condition aprx 12 sq feet at ceiling and all walls in the bathroomIssued Aug 9, 2019 · fix by Sep 13, 2019 overdue · Violation #13210538
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Jun 13, 2019 · fix by Jul 18, 2019 overdue · Violation #13118670

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

162017
142018
252019
352020
382021
32022
32023
152024
122025
142026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 291 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.