Housing violations · Norwood
3301 Decatur Avenue, Bronx
10467 · 26 apartments · 5 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint13
- Other repairs6
- Roaches6
- Peeling paint and plaster6
- No heat or hot water3
- Mold3
- Plumbing, sinks and toilets3
- Mice or rats3
- Leaks and water damage3
- Electrical problems1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 110 closed · NYC typical: 87 days
from 103 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 23, 2026 · fix by Mar 21, 2026 overdue · rent impairing · Violation #18732668
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the kitchenIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18584485
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and walls in the bathroomIssued Dec 2, 2025 · fix by Jan 6, 2026 overdue · Violation #18480549
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 2, 2025 · fix by Dec 2, 2025 overdue · rent impairing · Violation #18480547
- COther repairsProperly repair or replace the broken or defective cold radiator in the 2nd room from eastIssued Nov 19, 2025 · fix by Nov 25, 2025 overdue · Violation #18404920
- COther repairsProperly repair or replace the broken or defective cold radiator in the 1st room from eastIssued Nov 19, 2025 · fix by Nov 25, 2025 overdue · Violation #18404915
- BOther repairsProperly repair or replace the broken or defective window balance lower sash at south wall in the 3rd room from northIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18372217
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at wash basin in the bathroomIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · rent impairing · Violation #18372207
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the private hallwayIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18372205
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in water clogged at wash basin in the bathroomIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · rent impairing · Violation #18372206
- BElectrical problemsReplace with new the missing electrical switch cover at south wall in the private hallwayIssued Nov 14, 2025 · fix by Dec 19, 2025 overdue · Violation #18372203
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around diverter tub spout at bathtub in the bathroomIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18321993
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Oct 23, 2025 · fix by Nov 27, 2025 overdue · Violation #18321990
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 19, 2025 · fix by Oct 15, 2025 overdue · Violation #18243707
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Sep 27, 2024 · fix by Nov 1, 2024 overdue · Violation #17308244
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Sep 27, 2024 · fix by Nov 1, 2024 overdue · Violation #17308247
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 27, 2024 · fix by Oct 23, 2024 overdue · Violation #17308272
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 27, 2024 · fix by Oct 23, 2024 overdue · Violation #17308273
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 23, 2024 · fix by Sep 18, 2024 overdue · Violation #17219109
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 23, 2024 · fix by Sep 18, 2024 overdue · Violation #17219108
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2024 · fix by Sep 2, 2024 overdue · Violation #17174252
- CLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 7, 2024 · fix by Aug 13, 2024 overdue · Violation #17174248
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 7, 2024 · fix by Aug 13, 2024 overdue · Violation #17174236
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 10, 2024 · fix by May 6, 2024 overdue · Violation #16848604
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 3, 2024 · fix by Jan 27, 2024 overdue · Violation #16566461
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 12, 2023 · fix by Jan 5, 2024 overdue · Violation #16522833
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 3rd room from eastIssued Dec 12, 2023 · fix by Jan 16, 2024 overdue · Violation #16514251
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 12, 2023 · fix by Jan 5, 2024 overdue · Violation #16522835
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 12, 2023 · fix by Jan 5, 2024 overdue · Violation #16522832
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Dec 12, 2023 · fix by Jan 5, 2024 overdue · Violation #16522834
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 28, 2023 · fix by Dec 22, 2023 overdue · Violation #16469129
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 28, 2023 · fix by Dec 22, 2023 overdue · Violation #16469127
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 17, 2023 · fix by Sep 10, 2023 overdue · Violation #16170782
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 16, 2023 · fix by Sep 9, 2023 overdue · Violation #16170350
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 16, 2023 · fix by Sep 9, 2023 overdue · Violation #16170348
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from eastIssued Aug 3, 2022 · fix by Aug 9, 2022 overdue · Violation #15296939
- CMice or ratsAbate the infestation consisting of rodents rats court at eastIssued Jan 24, 2022 · fix by Feb 19, 2022 overdue · rent impairing · Violation #14783874
- BMoldTrace and repair the source and abate the visible mold condition at east wall approx. 1 sq.ft in the bathroomIssued Oct 12, 2021 · fix by Nov 16, 2021 overdue · Violation #14618814
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 10, 2021 · fix by Oct 4, 2021 overdue · Violation #14546129
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Aug 23, 2021 · fix by Sep 27, 2021 overdue · Violation #14512554
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 23, 2021 · fix by Sep 18, 2021 overdue · Violation #14512551
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 30, 2015 · fix by Dec 28, 2015 overdue · Violation #11017818
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 30, 2015 · fix by Dec 28, 2015 overdue · Violation #11017817
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.