Housing violations · Washington Heights (North)
17 Arden Street, Manhattan
10040 · 16 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- No heat or hot water4
- Peeling paint and plaster3
- Other repairs2
- Broken doors or locks2
- Leaks and water damage1
- Plumbing, sinks and toilets1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 46 closed · NYC typical: 87 days
from 24 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 5th storyIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19334763
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19326420
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19326421
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures low volume in the kitchenIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19295029
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18997685
- BOther repairsProperly repair with similar material the broken or defective ceramic-tiles at north and east walls. in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18997689
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18997682
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective lower base cabinet at sink in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18997686
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17929882
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 20, 2025 · fix by Mar 18, 2025 overdue · Violation #17706873
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 3, 2023 · fix by Nov 2, 2023 overdue · rent impairing · Violation #16351798
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 25, 2023 · fix by Nov 8, 2023 overdue · Violation #16330296
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 12, 2023 · fix by Oct 11, 2023 overdue · rent impairing · Violation #16300174
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.