Housing violations · University Heights (North)-Fordham
2492 Devoe Terrace, Bronx
10468 · 50 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs40
- Lead paint33
- Peeling paint and plaster25
- Broken doors or locks10
- Mold10
- Leaks and water damage9
- Roaches3
- Electrical problems3
- Plumbing, sinks and toilets3
- Mice or rats2
- Missing smoke or CO detector2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 142 closed · NYC typical: 87 days
from 123 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at lower and upper sash at building entrance door (street to vestibule) , 1st storyIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19369658
- BBroken doors or locksProvide glass that is not plexi at lower and upper sash at building entrance door (street to vestibule) , 1st storyIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19369659
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at the south wall in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344743
- BOther repairsProperly repair or replace the broken or defective lower springs at the south window in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344740
- BLeaks and water damageRepair the leaky and/or defective faucets at the sink in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344739
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344735
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at the metal door in the entranceIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344745
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling in the 1st room from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344744
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344742
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344741
- BOther repairsProperly repair or replace the broken or defective lower spring balance at the north window in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344738
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344729
- BElectrical problemsReplace with new the missing electrical outlet cover plate at the elecrical outlets at the north wall amd the west wall in the 3rd room from north at westIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344730
- BOther repairsReplace with new the missing metal radiator at the south wall in the 2nd room from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344737
- BElectrical problemsReplace with new the missing electrical outlet cover plate at the elecrical outlet at the south wall in the 2nd room from northIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344736
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344746
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19344734
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19344733
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east and south walls in 1st closet from north at east in the…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307626
- BOther repairsRemove all encumbrances consisting of e-bike at public hall, 2nd story, section at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307632
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307639
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 2nd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307638
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door , 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307637
- BOther repairsProperly repair with similar material the broken or defective at ceiling and south and west walls at 1st public hall bulkhead from north, 6th story, section at…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307634
- BOther repairsFire egress defective. remove the obstruction in fireproof passageway consisting of refuse at fire passage wayIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307631
- BOther repairsRemove all encumbrances consisting of household items at public hall, 4th story, section at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307630
- BOther repairsRemove all encumbrances consisting of household items at public hall, 5th story, section at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307629
- BOther repairsRemove all encumbrances consisting of household items at public hall, 6th story, section at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307628
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307627
- BLeaks and water damageRepair the roof so that it will not leak at ceiling at 1st public hall bulkhead from north, 6th story, section at southIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307633
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in 1st closet from north at east in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307625
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218094
- BOther repairsProperly repair with similar material the broken or defective slopping hardwood floor in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218097
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218096
- BBroken doors or locksProperly repair or replace the broken or defective door lock at door in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218099
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the private hallwayIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218098
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from east at northIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218100
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze finish by method of reglazing the bathtub in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218095
- BMoldTrace and repair the source and abate the visible mold condition observed more than 10 sq ft at ceiling in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217052
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217045
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the private hallwayIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217048
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217049
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217053
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217051
- BOther repairsProperly repair with similar material the broken or defective uneven wood floor in the kitchenIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19217058
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 15, 2026 · fix by Sep 21, 2026 overdue · Violation #19217057
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 28, 2026 · fix by Sep 21, 2026 overdue · Violation #19179992
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 28, 2026 · fix by Sep 21, 2026 overdue · Violation #19179991
- BOther repairs& 309 m/d law abate the nuisance consisting of uncapped radiator valve at south wall in the 2nd room from northIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170498
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance at 1st window from east at south in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170497
- BElectrical problemsReplace with new the missing electrical outlet cover plate at north wall and west wall in the 3rd room from north at westIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170496
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 28, 2026 · fix by Sep 21, 2026 overdue · Violation #19179993
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170485
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170486
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170487
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall in the kitchenIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170488
- COther repairsProperly repair with similar material the broken or defective concrete floor and ceramic tiles at floor in the kitchenIssued Aug 28, 2026 · fix by Sep 3, 2026 overdue · Violation #19170493
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 28, 2026 · fix by Sep 21, 2026 overdue · Violation #19179994
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance at 1st window from west at north in the kitchenIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170494
- BOther repairs& 309 m/d law abate the nuisance consisting of uncapped radiator valve north wall in the 3rd room from north at westIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19170495
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.