Housing violations · Washington Heights (South)
189 Audubon Avenue, Manhattan
10033 · 15 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs20
- Peeling paint and plaster5
- Plumbing, sinks and toilets4
- Electrical problems2
- Roaches2
- No heat or hot water1
- Mice or rats1
- Broken doors or locks1
- Mold1
- Leaks and water damage1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 50 closed · NYC typical: 87 days
from 126 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Nov 16, 2026 · rent impairing · Violation #19359331
- BPlumbing, sinks and toiletsReplace the broken or defective wash/basin in the bathroomIssued Nov 16, 2026 · rent impairing · Violation #19359327
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall in the kitchenIssued Nov 16, 2026 · Violation #19359330
- CNo heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19359333
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · rent impairing · Violation #19359326
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at south wall in the 3rd room from eastIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19304251
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19304249
- BPlumbing, sinks and toiletsReplace the broken or defective /missing wash basin in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · rent impairing · Violation #19304250
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19304248
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · rent impairing · Violation #19275583
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275587
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at west wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275586
- BPlumbing, sinks and toiletsReplace with new the missing washbasin in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210172
- BOther repairsProperly repair or replace the broken or defective counter balance at upper sash at 2nd window from south at west in the 3rd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210176
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210173
- COther repairsProperly repair or replace the broken or defective counter balance at lower sash at 1st window from south at west in the 3rd room from northIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19210174
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210175
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 31, 2026 · fix by Sep 26, 2026 overdue · rent impairing · Violation #19170427
- BPlumbing, sinks and toiletsReplace with new the missing wash basin in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146709
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at 1st window from east at south in the 2nd room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146710
- BOther repairsProperly repair or replace the broken or defective spring balance at upper window sash at 2nd window from east at south in the 2nd room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146711
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 2nd room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146712
- BOther repairsReplace with new the missing shut off valve at radiator in the 2nd room from eastIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146713
- BBroken doors or locksProperly repair or replace the broken or defective latchset at door in the entranceIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19146714
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19079058
- BOther repairsProperly repair with similar material the broken or defective vinyl tile at floor in the 1st room from east at northIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663613
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663605
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at southIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663607
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from eastIssued Apr 4, 2025 · fix by May 9, 2025 overdue · Violation #17808266
- CMoldTrace and repair the source and abate the visible mold condition at ceiling ( approx 5 sqft ), at north wall ( approx 5 sqft ), at south wall ( approx 5 sqft…Issued Oct 2, 2024 · fix by Oct 28, 2024 overdue · Violation #17323255
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the kitchenIssued Aug 9, 2023 · fix by Sep 13, 2023 overdue · Violation #16154502
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the bathroomIssued Jul 14, 2023 · fix by Aug 18, 2023 overdue · Violation #16097023
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued May 13, 2021 · fix by Jun 6, 2021 overdue · Violation #14333066
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.