Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Parkchester

1410 East Avenue, Bronx

10462 · 49 apartments · 8 stories · City Council district 18

By · Updated · Data from NYC HPD

C
30open immediately hazardous violations · 61 per 100 apartments
B34Hazardous, open
A6Non-hazardous, open
!69Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyTHE PARKCHESTER SOUTH CONDOMINIUM, INC.
Landlord (head officer or owner)Juan Torres

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    28
  2. Lead paint
    20
  3. Leaks and water damage
    10
  4. Broken doors or locks
    3
  5. Mold
    3
  6. No heat or hot water
    1
  7. Other repairs
    1
  8. Plumbing, sinks and toilets
    1
  9. Roaches
    1
  10. Missing smoke or CO detector
    1
  11. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C85 days
from 9 closed · NYC typical: 87 days
B94 days
from 10 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19368154
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19368153
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 27, 2025 · fix by Jun 2, 2025 overdue · Violation #17916166
  • B
    Other repairsProperly repair or replace the broken or defective bottom base cabinet at north wall in the kitchenIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916163
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by methor of reglazing at bathtub in the bathroomIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17916162
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · Violation #17159268
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 1, 2024 · fix by Aug 27, 2024 overdue · Violation #17159269
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 2nd room from northIssued Aug 1, 2024 · fix by Sep 5, 2024 overdue · rent impairing · Violation #17159267
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at northIssued Jul 24, 2024 · fix by Aug 28, 2024 overdue · Violation #17135321
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and the north wall in the 1st room from east at northIssued Jul 24, 2024 · fix by Aug 28, 2024 overdue · Violation #17135320
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the 2nd room from northIssued Apr 12, 2024 · fix by May 17, 2024 overdue · Violation #16829598
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16829605
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling and the north wall in the foyerIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16829602
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the foyerIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16829603
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and west wall in the kitchenIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16829607
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 16, 2023 · fix by Jul 21, 2023 overdue · Violation #16032974
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16032969
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · rent impairing · Violation #16032970
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16032973
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16032971
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the foyerIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · rent impairing · Violation #16032972
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchenIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16032968
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15465341
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at window frame from north at east wall in the 1st room from east at northIssued Apr 15, 2021 · fix by May 20, 2021 overdue · Violation #14240423
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at south wall, north wall in the foyerIssued Apr 15, 2021 · fix by May 20, 2021 overdue · Violation #14240422
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, east wall, south wall, west wall in the private hallwayIssued Mar 31, 2021 · fix by May 5, 2021 overdue · Violation #14099575
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, east wall, south wall in the foyerIssued Mar 31, 2021 · fix by May 5, 2021 overdue · Violation #14099571
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling in the 1st room from eastIssued Mar 31, 2021 · fix by May 5, 2021 overdue · Violation #14099576
  • C
    Leaks and water damageRepair the roof so that it will not leak over the in the 2nd room from eastIssued Mar 31, 2021 · fix by Apr 6, 2021 overdue · rent impairing · Violation #14099578
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, west wall, east wall, ceiling, north wall in the 2nd room from…Issued Mar 31, 2021 · fix by May 5, 2021 overdue · Violation #14099579
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 3rd room from eastIssued Mar 31, 2021 · fix by May 5, 2021 overdue · Violation #14099580
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Mar 31, 2021 · fix by May 5, 2021 overdue · Violation #14099581
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Mar 30, 2021 · fix by Apr 5, 2021 overdue · Violation #14097788
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallwayIssued Mar 30, 2021 · fix by Apr 5, 2021 overdue · Violation #14097794
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyerIssued Mar 30, 2021 · fix by Apr 5, 2021 overdue · Violation #14097784
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 20 square feet at north wall, 20 square feet at west wall, 20 square feet at east…Issued Mar 30, 2021 · fix by Apr 25, 2021 overdue · Violation #14097780
  • C
    Leaks and water damageRepair the roof so that it will not leak from the ceilingIssued Mar 30, 2021 · fix by Apr 5, 2021 overdue · rent impairing · Violation #14097774
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 28, 2020 · fix by Jan 1, 2021 overdue · Violation #13955743
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 28, 2020 · fix by Jan 1, 2021 overdue · Violation #13955741
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 28, 2020 · fix by Jan 1, 2021 overdue · Violation #13955740
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 28, 2020 · fix by Jan 1, 2021 overdue · Violation #13955739
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 28, 2020 · fix by Jan 1, 2021 overdue · Violation #13955738
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 28, 2020 · fix by Jan 1, 2021 overdue · Violation #13955737
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall, north wall, east wall, west wall, ceiling in the 2nd room from…Issued Dec 16, 2020 · fix by Jan 20, 2021 overdue · Violation #13935856
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 3rd room from east at northIssued Dec 16, 2020 · fix by Jan 20, 2021 overdue · Violation #13935851
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from east at northIssued Dec 16, 2020 · fix by Jan 20, 2021 overdue · Violation #13935849
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall, west wall, north wall, east wall, ceiling in the private hallwayIssued Dec 16, 2020 · fix by Jan 20, 2021 overdue · Violation #13935828
  • B
    Broken doors or locksRepair the broken or defective plastered surfaces and paint in a uniform color at south wall, 1st closet from north at east wall door frame, 1st closet from…Issued Dec 16, 2020 · fix by Jan 20, 2021 overdue · Violation #13935754
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall, north wall, east wall in the foyerIssued Dec 16, 2020 · fix by Jan 20, 2021 overdue · Violation #13935749
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 16, 2020 · fix by Dec 20, 2020 overdue · Violation #13930004
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 16, 2020 · fix by Dec 20, 2020 overdue · Violation #13930001
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 11, 2020 · fix by Dec 15, 2020 overdue · Violation #13930444
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Dec 11, 2020 · fix by Dec 15, 2020 overdue · Violation #13930003
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 11, 2020 · fix by Dec 15, 2020 overdue · Violation #13930002
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 11, 2020 · fix by Dec 15, 2020 overdue · Violation #13930005
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and…Issued Dec 10, 2020 · fix by Dec 14, 2020 overdue · Violation #13930436
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 1, 2020 · fix by Jul 5, 2020 overdue · Violation #13710364
  • B
    BedbugsAbate the nuisance consisting of bedbugs in the entire apartmentIssued Jan 2, 2020 · fix by Feb 6, 2020 overdue · Violation #8441905
  • C
    Lead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint ceiling 5th sty southIssued Feb 3, 1998 · fix by Feb 23, 1998 overdue · Violation #920505
  • C
    Lead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint walls 5th sty southIssued Feb 3, 1998 · fix by Feb 23, 1998 overdue · Violation #920506

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
342020
372021
12022
92023
182024
142025
82026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 129 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.