Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (North)

460 Audubon Avenue, Manhattan

10040 · 49 apartments · 5 stories · City Council district 10

By · Updated · Data from NYC HPD

C
28open immediately hazardous violations · 57 per 100 apartments
B57Hazardous, open
A4Non-hazardous, open
!80Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyFOUR SIXTY ASSOCIATES LLC
Landlord (head officer or owner)Tony Huang

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    31
  2. Peeling paint and plaster
    16
  3. Roaches
    11
  4. Mice or rats
    10
  5. Missing smoke or CO detector
    6
  6. Plumbing, sinks and toilets
    5
  7. Leaks and water damage
    4
  8. Electrical problems
    4
  9. Broken doors or locks
    2
  10. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C117 days
from 229 closed · NYC typical: 87 days
B132 days
from 446 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19350594
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318579
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 23, 2026 · fix by Nov 18, 2026 · Violation #19318577
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318578
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19318580
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311860
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311858
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical switch at east wall in the 4th room from eastIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311859
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at upper window sash in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311857
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19299393
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19299394
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19299392
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279158
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279160
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 2nd room from northIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279159
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19279157
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19145671
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19145670
  • C
    Other repairsProperly repair or replace the broken or defective upper sash glass pane at window on east wall in the 1st room from northIssued Jun 26, 2026 · fix by Jul 2, 2026 overdue · Violation #19034690
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018765
  • B
    Other repairsReplace with new the missing upper escutcheon plate at heat riser pipe in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018769
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · rent impairing · Violation #18997806
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash window to fire escape in the 1st room from east at northIssued Jun 15, 2026 · fix by Jun 21, 2026 overdue · Violation #18997824
  • B
    Other repairsProperly repair or replace the broken or defective 2nd window from north at east wall in the 3rd room from northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18997863
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floors in the 1st room from northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18997860
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · rent impairing · Violation #18997807
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 1, 2026 · fix by Jun 27, 2026 overdue · Violation #18975272
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 1, 2026 · fix by Jun 27, 2026 overdue · Violation #18975273
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 28, 2026 · fix by Jun 23, 2026 overdue · Violation #18959725
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at floor in the kitchenIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18959726
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18959724
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 28, 2026 · fix by Jun 3, 2026 overdue · Violation #18959723
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913625
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash 1st window from north at east wall in the 1st room from east at northIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913624
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash 1st window from north at east wall in the 1st room from east at southIssued May 13, 2026 · fix by Jun 17, 2026 overdue · Violation #18913626
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued May 13, 2026 · fix by Jun 17, 2026 overdue · rent impairing · Violation #18913622
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at sink in the kitchenIssued May 13, 2026 · fix by Jun 17, 2026 overdue · rent impairing · Violation #18913623
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18850027
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18850023
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower window sash in the 1st room from east at northIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18850024
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18850028
  • B
    Other repairsProperly repair or replace the broken or defective ceiling light fixture in the kitchenIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18850026
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower window sash at 1st window from north at east wall in the 2nd room from east at northIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18850029
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at sink in the kitchenIssued May 5, 2026 · fix by Jun 9, 2026 overdue · rent impairing · Violation #18850030
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west and south wall in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849600
  • B
    Other repairsProperly repair with similar material the broken or defective wood flooring in the foyerIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849601
  • B
    Other repairsProperly repair with similar material the broken or defective wood flooring in the 3rd room from eastIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849602
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724959
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18724958
  • B
    Other repairsProperly repair or replace the broken or defective window stool in the 1st room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724960
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724961
  • B
    Other repairsProperly repair or replace the broken or defective base board at east wall in the 1st room from east at northIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724962
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from east at southIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724964
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18724977
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 20, 2026 · fix by Apr 15, 2026 overdue · Violation #18724978
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and east walls in the 3rd room from northIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671024
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671021
  • B
    Other repairsRefit lower sash at east 1 window in the 1st room from east at northIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671018
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671019
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Feb 24, 2026 · fix by Mar 31, 2026 overdue · Violation #18671023

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

352017
772018
312019
572020
1662021
982022
3232023
2322024
1582025
1762026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,540 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.