Housing violations · Mott Haven-Port Morris
424 East 138 Street, Bronx
10454 · 8 apartments · 5 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Mold11
- Other repairs9
- Peeling paint and plaster5
- Leaks and water damage5
- No heat or hot water2
- Broken doors or locks2
- Plumbing, sinks and toilets1
- Lead paint1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 19 closed · NYC typical: 87 days
from 22 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degrees at sink in the kitchen in the entire apartmentIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19307417
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307419
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19307421
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19307422
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19307418
- BOther repairsProperly repair or replace the broken or defective intercom system at west wall in the private hallwayIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19182752
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19182751
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 4th room from northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19182749
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding 130 degree in the kitchenIssued Aug 21, 2026 · fix by Aug 27, 2026 overdue · Violation #19153548
- BMoldTrace and repair the source and abate the visible mold condition less than 1o square feet at the south wall in the 4th room from northIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025509
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at vestibule ceiling at public hall, 1st storyIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18958901
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 1, 2026 · fix by Jun 7, 2026 overdue · Violation #18958904
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at vestibule ceiling at public hall, 1st storyIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18958902
- BMoldTrace and repair the source and abate the visible mold condition less than 30 sqft of mold at north wall, window casing and ceiling in the 1st room from north…Issued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18958898
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18958900
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the 4th room from north at westIssued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18958899
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling and all walls in the 2nd room from northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807559
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling and all walls in the 1st room from northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807558
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling and all walls in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18807557
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the kitchenIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18731617
- BMoldTrace and repair the source and abate the visible mold condition grader than 10 sq feet at ceiling and north wall in the 1st room from north at eastIssued Feb 12, 2026 · fix by Mar 19, 2026 overdue · Violation #18635461
- BMoldTrace and repair the source and abate the visible mold condition at north wall, ceiling and around window frame less than 30 sq. ft in the 1st room from northIssued Feb 10, 2026 · fix by Mar 17, 2026 overdue · Violation #18629632
- CBroken doors or locksRemove the illegal fastening lockable slide bolt installed at roof door at 1st public hall bulkhead from north, 5th storyIssued Jan 13, 2026 · fix by Jan 19, 2026 overdue · rent impairing · Violation #18566161
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jan 13, 2026 · fix by Jan 19, 2026 overdue · Violation #18566162
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Nov 20, 2025 · fix by Nov 26, 2025 overdue · Violation #18392080
- CBroken doors or locksRemove the illegal fastening consisting of lockable slide bolt installed at roof door at 1st public hall bulkhead from north, 5th storyIssued Nov 6, 2025 · fix by Nov 12, 2025 overdue · rent impairing · Violation #18348558
- BOther repairsReplace with new the missing terracotta coping stones at north parapet wallIssued Nov 6, 2025 · fix by Dec 11, 2025 overdue · Violation #18348559
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 6, 2025 · fix by Oct 12, 2025 overdue · Violation #18283820
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 11, 2025 · fix by Aug 6, 2025 overdue · Violation #18082744
- BMoldTrace and repair the source and abate the visible mold condition less than 30sqft at ceiling in the bathroomIssued Jul 11, 2025 · fix by Aug 15, 2025 overdue · Violation #18082745
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.