Housing violations · Mott Haven-Port Morris
514 East 138 Street, Bronx
10454 · 23 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs17
- Peeling paint and plaster12
- Mice or rats6
- Leaks and water damage5
- Broken doors or locks4
- Plumbing, sinks and toilets4
- Roaches3
- Missing smoke or CO detector2
- Mold2
- Lead paint1
- Missing window guards1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 126 closed · NYC typical: 87 days
from 145 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch in the entranceIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19327216
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327220
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327219
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at fire door leading to east yard at public hall, 1st storyIssued Oct 29, 2026 · fix by Nov 12, 2026 overdue · Violation #19327221
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assemblies at door in the entranceIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19327217
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19206115
- BOther repairsProperly repair or replace the broken or defective mailbox , 1st storyIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19206113
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 11, 2026 · fix by Oct 7, 2026 overdue · Violation #19206116
- BOther repairsProperly repair or replace the broken or defective intercom system from the building entrance to the tenant's phone in the entire apartmentIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19206114
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 21, 2026 · fix by Sep 4, 2026 overdue · Violation #19158569
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the private hallwayIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19158571
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash on east wall in the kitchenIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19158577
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18989533
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18989531
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18989530
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18989532
- BOther repairsProperly repair or replace the broken or defective intercom system in the foyerIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18748928
- COther repairsProperly repair or replace the broken or defective counter balance at lower window sash in the kitchenIssued Mar 17, 2026 · fix by Mar 23, 2026 overdue · Violation #18715813
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 17, 2026 · fix by Apr 12, 2026 overdue · Violation #18717237
- BOther repairsReplace with new the missing radiator in the 1st room from northIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18692238
- COther repairsProperly repair or replace the broken or defective air release valve at radiator in the 4th room from northIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18692242
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18692240
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles at east wall at bathtub in the bathroomIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18692239
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18624741
- BOther repairsProperly repair with similar material the broken or defective sloping wood floor in the private hallwayIssued Feb 6, 2026 · fix by Mar 13, 2026 overdue · Violation #18624742
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18585317
- COther repairsProperly repair or replace the broken or defective metal window frame at south wall in the 4th room from northIssued Mar 10, 2025 · fix by Mar 16, 2025 overdue · Violation #17751335
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 10, 2025 · fix by Apr 5, 2025 overdue · Violation #17751342
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak around steam riser at ceiling in the kitchenIssued Dec 30, 2024 · fix by Jan 5, 2025 overdue · Violation #17590999
- COther repairsProperly repair or replace the broken or defective counter balance at lower window sash in the 4th room from east at southIssued Dec 30, 2024 · fix by Jan 5, 2025 overdue · Violation #17590994
- BOther repairsReplace with new the missing upper wall cabinet in the kitchenIssued Nov 22, 2024 · fix by Dec 27, 2024 overdue · Violation #17442611
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood floor underneath sink in the kitchenIssued Nov 22, 2024 · fix by Dec 27, 2024 overdue · Violation #17442610
- BOther repairsProperly repair or replace the broken or defective lower sash window balances in the 5th room from northIssued Jan 29, 2024 · fix by Mar 4, 2024 overdue · Violation #16636794
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Jan 22, 2024 · fix by Feb 26, 2024 overdue · Violation #16610983
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued Jan 22, 2024 · fix by Feb 26, 2024 overdue · Violation #16610981
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 25, 2023 · fix by Nov 20, 2023 overdue · Violation #16334311
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall and ceiling in the bathroomIssued Sep 14, 2023 · fix by Sep 20, 2023 overdue · Violation #16225357
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 5, 2023 · fix by Sep 11, 2023 overdue · Violation #16209524
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 5, 2023 · fix by Oct 10, 2023 overdue · Violation #16209525
- CBroken doors or locksProperly repair or replace the broken or defective lock at apartment entrance door in the entranceIssued Aug 30, 2023 · fix by Sep 5, 2023 overdue · Violation #16195760
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Aug 17, 2023 · fix by Sep 21, 2023 overdue · Violation #16170400
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 17, 2023 · fix by Sep 21, 2023 overdue · Violation #16170401
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet cover plate at west wall. in the 2nd room from northIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16142361
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2023 · fix by Sep 2, 2023 overdue · Violation #16142360
- CPlumbing, sinks and toiletsReplace the broken or defective washbasin in the 2nd bathroom from northIssued Jul 26, 2023 · fix by Aug 1, 2023 overdue · rent impairing · Violation #16122228
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 3 sq ft in the bathroomIssued Oct 28, 2021 · fix by Dec 2, 2021 overdue · Violation #14654967
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2021 · fix by Nov 17, 2021 overdue · Violation #14633164
- BOther repairsProperly repair the broken or defective spring balance at lower window sash in the bathroomIssued Oct 22, 2021 · fix by Nov 26, 2021 overdue · Violation #14633163
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 22, 2021 · fix by Nov 17, 2021 overdue · Violation #14633165
- BOther repairsProperly repair the broken or defective spring balance at lower sash window at east wal in the 3rd room from eastIssued Oct 22, 2021 · fix by Nov 26, 2021 overdue · Violation #14633157
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the 4th room from northIssued Jun 30, 2021 · fix by Aug 4, 2021 overdue · Violation #14416070
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jun 30, 2021 · fix by Aug 4, 2021 overdue · Violation #14416077
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 30, 2021 · fix by Jul 6, 2021 overdue · Violation #14416073
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.