Housing violations · Mott Haven-Port Morris
541 Union Avenue, Bronx
10455 · 51 apartments · 6 stories · City Council district 8
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs29
- Peeling paint and plaster24
- Lead paint13
- Broken doors or locks12
- Leaks and water damage9
- Plumbing, sinks and toilets8
- Roaches6
- Electrical problems5
- Missing smoke or CO detector4
- Mice or rats3
- Mold2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 93 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 6, 2026 · fix by Nov 30, 2026 · Violation #19362708
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at north wall in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347988
- BOther repairsProperly repair or replace the broken or defective upper and lower window sashes spring balances at north wall in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347991
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at north, west, and east walls in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347990
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347989
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19356936
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19356935
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19356934
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19356933
- BBroken doors or locksProperly repair or replace the broken or defective door at entrance in the foyerIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19348000
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347999
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347998
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at west wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347997
- COther repairsRemove all obstructions from water closet in the bathroomIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · rent impairing · Violation #19347996
- BOther repairsProperly repair with similar material the broken or defective marble saddle at entrance in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347995
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective enamel glaze surface finish at bathtub in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347993
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19347992
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 3, 2026 · fix by Apr 9, 2026 overdue · Violation #18759133
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Feb 17, 2026 · fix by Mar 13, 2026 overdue · Violation #18650722
- BBroken doors or locksProperly repair or replace the broken or defective door frame in the bathroomIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17876855
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17766867
- BOther repairsProperly repair or replace the broken or defective base cabinet at south wall in the kitchenIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · Violation #17784960
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in drain pipe at washbasin in the bathroomIssued Mar 24, 2025 · fix by Apr 28, 2025 overdue · rent impairing · Violation #17766872
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Mar 24, 2025 · fix by Mar 30, 2025 overdue · Violation #17766868
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17766866
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at southIssued Mar 24, 2025 · fix by Mar 30, 2025 overdue · Violation #17766869
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges on fire rated door in the entranceIssued Dec 20, 2024 · fix by Jan 3, 2025 overdue · Violation #17566122
- BOther repairsProperly repair or replace the broken or defective bell and returned buzzer from vestibule to panel on west wall in the foyerIssued Dec 20, 2024 · fix by Jan 24, 2025 overdue · Violation #17566104
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2024 · fix by Dec 8, 2024 overdue · Violation #17406069
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 12, 2024 · fix by Dec 8, 2024 overdue · Violation #17406067
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 12, 2024 · fix by Dec 6, 2024 overdue · Violation #17414368
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of bedframe partially blocking window to fire escape in the 2nd room from east at southIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17406071
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 12, 2024 · fix by Dec 6, 2024 overdue · Violation #17414370
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Nov 12, 2024 · fix by Dec 6, 2024 overdue · Violation #17414369
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at southIssued Nov 12, 2024 · fix by Nov 18, 2024 overdue · Violation #17406060
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 12, 2024 · fix by Nov 18, 2024 overdue · Violation #17406061
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 12, 2024 · fix by Dec 17, 2024 overdue · Violation #17406062
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2024 · fix by Dec 8, 2024 overdue · Violation #17406068
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 12, 2024 · fix by Dec 6, 2024 overdue · Violation #17414367
- BOther repairsProperly repair with similar material the broken or defective lilfting ceramic floor tiles near riser in the bathroomIssued Oct 31, 2024 · fix by Dec 5, 2024 overdue · Violation #17382884
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood under sink base cabinet (water damage) in the kitchenIssued Oct 31, 2024 · fix by Dec 5, 2024 overdue · Violation #17382886
- BOther repairs& 309 m/d law abate the nuisance consisting of cracked vinyl floor tiles in the kitchenIssued Oct 31, 2024 · fix by Dec 5, 2024 overdue · Violation #17382885
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 11, 2024 · fix by Oct 7, 2024 overdue · Violation #17260170
- CRoachesAbate the infestation consisting of roaches in the foyerIssued Jul 29, 2024 · fix by Aug 24, 2024 overdue · Violation #17144881
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2024 · fix by Aug 24, 2024 overdue · Violation #17144867
- BOther repairsProperly repair or replace the broken or defective bell/buzzer intercom system in the foyerIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17144868
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective (defective spring loaded hinges) in the entranceIssued Jul 29, 2024 · fix by Aug 12, 2024 overdue · Violation #17144878
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenetteIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17144870
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17144872
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 17, 2024 · fix by May 22, 2024 overdue · Violation #16880930
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at southIssued Apr 17, 2024 · fix by May 22, 2024 overdue · Violation #16880932
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at southIssued Apr 17, 2024 · fix by May 22, 2024 overdue · Violation #16880931
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 17, 2024 · fix by May 22, 2024 overdue · Violation #16880929
- BOther repairsProperly repair with similar material the broken or defective 3rd marble tread up from bottom at vestibule at public hall, 1st storyIssued Mar 18, 2024 · fix by Apr 22, 2024 overdue · Violation #16741815
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Mar 6, 2024 · fix by Apr 10, 2024 overdue · Violation #16719319
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 6, 2024 · fix by Apr 1, 2024 overdue · Violation #16719314
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Mar 6, 2024 · fix by Apr 10, 2024 overdue · Violation #16719317
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 6, 2024 · fix by Apr 1, 2024 overdue · Violation #16719315
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchenIssued Mar 6, 2024 · fix by Apr 10, 2024 overdue · Violation #16719318
- BOther repairsProperly repair or replace the broken or defective upper base cabinet at south wall in the kitchenIssued Mar 6, 2024 · fix by Apr 10, 2024 overdue · Violation #16719320
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.