Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Concourse-Concourse Village

175 East 151 Street, Bronx

10451 · 98 apartments · 6 stories · City Council district 8

By · Updated · Data from NYC HPD

C
71open immediately hazardous violations · 72 per 100 apartments
B98Hazardous, open
A24Non-hazardous, open
!184Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company151ST AND WALTON LLC
Landlord (head officer or owner)Arthur Green

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    39
  2. Other repairs
    32
  3. Lead paint
    27
  4. Leaks and water damage
    16
  5. Broken doors or locks
    16
  6. Mice or rats
    14
  7. Roaches
    11
  8. Missing smoke or CO detector
    10
  9. Mold
    9
  10. Plumbing, sinks and toilets
    7
  11. No heat or hot water
    4
  12. Electrical problems
    4
  13. Missing window guards
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 117 closed · NYC typical: 87 days
B100 days
from 315 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19351737
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19290952
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290951
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the 2nd bathroom from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290947
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the 2nd bathroom from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290949
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19290945
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290948
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking aroung bathtub in the 2nd bathroom from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290950
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st bathroom from eastIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290944
  • C
    Broken doors or locksProperly repair or replace the broken or defective lower sash glass window at building entrance doorIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19290954
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe under sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290953
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192574
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower window sash at east wall in the 4th room from eastIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19192575
  • B
    Other repairsM/d law post a printed scale floor plan showing means of egress, at elevator at public hall, 4th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192578
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19192576
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door at entrance in the 3rd room from north at westIssued Jul 6, 2026 · fix by Aug 10, 2026 overdue · Violation #19051141
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq. ft at ceiling, north, west, and south walls in the bathroomIssued Jul 6, 2026 · fix by Aug 1, 2026 overdue · Violation #19051142
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19012561
  • B
    Other repairsM/d law post a printed scale floor plan showing means of egress, at elevator at public hall, 4th storyIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19012563
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective cracked ceramic tiles at bathtub area in the bathroomIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823556
  • B
    Other repairsProperly secure the loose light fixture at ceiling in the private hallwayIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823558
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from eastIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823557
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823552
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823555
  • B
    Other repairsProvide escucheon plate at upper and lower riser in the bathroomIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823554
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18823559
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18823560
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 1, 2026 · fix by Jun 5, 2026 overdue · Violation #18823553
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Apr 30, 2026 · fix by May 14, 2026 overdue · Violation #18824228
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 15, 2026 · fix by Jan 15, 2026 overdue · rent impairing · Violation #18569642
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 15, 2026 · fix by Jan 21, 2026 overdue · Violation #18569643
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at eastIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444176
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at eastIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18444175
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444179
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444180
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tile at north wall in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444181
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444182
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444183
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444184
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18444185
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18444178
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 28, 2025 · fix by Dec 24, 2025 overdue · Violation #18444177
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 23, 2025 · fix by Oct 23, 2025 overdue · rent impairing · Violation #18317706
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet north, south, east, and west walls in the bathroomIssued Jul 18, 2025 · fix by Aug 13, 2025 overdue · Violation #18107676
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2025 · fix by Aug 9, 2025 overdue · Violation #18083559
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 10, 2025 · fix by Jul 15, 2025 overdue · Violation #17978904
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 10, 2025 · fix by Jul 15, 2025 overdue · Violation #17978903
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Jun 3, 2025 · fix by Jun 7, 2025 overdue · Violation #17937098
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 3, 2025 · fix by Jun 7, 2025 overdue · Violation #17937099
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 30, 2025 · fix by May 26, 2025 overdue · Violation #17865535
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 30, 2025 · fix by Jun 4, 2025 overdue · Violation #17865538
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 30, 2025 · fix by Jun 4, 2025 overdue · Violation #17865539
  • B
    Other repairsProperly repair or replace the broken or defective upper and lower window sash counter balance at the 1st window from east at south in the kitchenIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17763659
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 5, 2025 · fix by Mar 31, 2025 overdue · Violation #17733875
  • B
    Broken doors or locksProperly repair or replace the broken or defective bell/buzzer system from building entrance door to wall at in the foyerIssued Mar 5, 2025 · fix by Apr 9, 2025 overdue · Violation #17733883
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). inoperable in the entire apartmentIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17716985
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 27, 2025 · fix by Mar 25, 2025 overdue · Violation #17716974
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17716984
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 27, 2025 · fix by Mar 25, 2025 overdue · Violation #17716975
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17716983

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

362017
312018
922019
52020
1072021
982022
1212023
3542024
1612025
432026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,456 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.