Housing violations · Longwood
960 East 163 Street, Bronx
10459 · 25 apartments · 5 stories · City Council district 17
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks7
- Peeling paint and plaster4
- Other repairs3
- Plumbing, sinks and toilets3
- No heat or hot water3
- Leaks and water damage2
- Missing smoke or CO detector2
- Mold1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 87 days
from 12 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the 2nd bathroom from eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237019
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash, 3rd window from south at west wall in the 2nd room from north at westIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237022
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north at eastIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19237021
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at washbasin in the bathroomIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · Violation #18075154
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at sink in the kitchenIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · rent impairing · Violation #18075159
- BOther repairsProperly repair with similar material the broken or defective decorative concrete moulding above 1st story window at entrance to building at eastIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · Violation #18081224
- BBroken doors or locksProperly repair or replace the broken or defective closet door at west wall in the 1st room from east at northIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · Violation #18075155
- BBroken doors or locksProperly repair or replace the broken or defective closet door at north wall in the 3rd room from east at southIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · Violation #18075156
- BBroken doors or locksProperly repair or replace the broken or defective closet door at south wall in the private hallwayIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · Violation #18075157
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 9, 2025 · fix by Aug 4, 2025 overdue · Violation #18075158
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jul 9, 2025 · fix by Aug 13, 2025 overdue · Violation #18075151
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jan 24, 2025 · fix by Feb 28, 2025 overdue · Violation #17643754
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Jan 24, 2025 · fix by Feb 28, 2025 overdue · Violation #17643753
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 22, 2024 · fix by Jan 21, 2024 overdue · rent impairing · Violation #16607746
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 22, 2024 · fix by Jan 21, 2024 overdue · rent impairing · Violation #16607747
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 22, 2024 · fix by Jan 28, 2024 overdue · Violation #16607748
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 4, 2023 · fix by Oct 4, 2023 overdue · rent impairing · Violation #16280896
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 4, 2023 · fix by Oct 10, 2023 overdue · Violation #16280897
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 27, 2023 · fix by Aug 1, 2023 overdue · Violation #16060409
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from northIssued Jun 27, 2023 · fix by Aug 1, 2023 overdue · Violation #16060407
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door at public hall, 1st storyIssued Apr 28, 2023 · fix by May 4, 2023 overdue · Violation #15946213
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 18, 2022 · fix by Sep 22, 2022 overdue · Violation #15313699
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Aug 18, 2022 · fix by Sep 22, 2022 overdue · Violation #15313698
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.