Housing violations · Elmhurst
41-40 Denman Street, Queens
11373 · 120 apartments · 6 stories · City Council district 21
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
70 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs237
- Peeling paint and plaster93
- Leaks and water damage54
- Mold53
- Broken doors or locks42
- Electrical problems39
- Roaches26
- Missing smoke or CO detector20
- Lead paint19
- Mice or rats15
- Plumbing, sinks and toilets10
- Missing window guards7
- No heat or hot water4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 94 closed · NYC typical: 87 days
from 20 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the west 1 and west 2 windows in the 1st room from north at eastIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132537
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the west 1 and west 2 windows in the 1st room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132536
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at the west wall in the kitchenIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132535
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at the north wall in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132531
- BOther repairsProperly repair with similar material the broken or defective grout and mortar joints at north, east and south walls in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132533
- BOther repairsProperly repair or replace the broken or defective intercommunication system from building front to west wall panel in the private hallwayIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132538
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at the east wall in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19132534
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at the west wall in the kitchenIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132545
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east 1 and east 2 window frame in the 1st room from east at southIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132552
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132548
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the west 1 window in the 2nd room from northIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132802
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at the north wall in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132805
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east window frame in the 1st room from east at northIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132553
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 11, 2026 · fix by Sep 6, 2026 overdue · Violation #19132554
- BLeaks and water damageRepair the leaky and/or defective faucets at the washbasin in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132547
- BOther repairsProperly repair or replace the broken or defective intercommunication system from the building front to the north wall panel in the foyerIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132546
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at west wall in the kitchenIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132798
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · Violation #19132550
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the bathroomIssued Aug 11, 2026 · fix by Sep 15, 2026 overdue · rent impairing · Violation #19132549
- BOther repairsProperly repair with similar material the broken or defective fire retardant material approx 30 sq feet at ceiling at boiler roomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19132762
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19108571
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from east at southIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108573
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east walls in the 2nd room from east at southIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108574
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, and east walls in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108575
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east walls in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108576
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at east wall in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108577
- BOther repairsProperly repair or replace the broken or defective intercommunication system from building front to north wall panel in the foyerIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108579
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at west in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108580
- BOther repairsProperly repair or replace the broken or defective intercommunication system at south wall panel in the foyerIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108582
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, east and south walls in the 1st room from east at southIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108584
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east, and south walls in the 1st room from east at southIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108585
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108555
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south, north , east, west walls and ceiling in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108581
- COther repairsProperly repair or replace the broken or defective lower counter balance at the east 1 and 2 window in the 1st room from east at southIssued Aug 4, 2026 · fix by Aug 10, 2026 overdue · Violation #19108583
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 4, 2026 · fix by Aug 18, 2026 overdue · Violation #19108578
- BOther repairsProperly repair or replace the broken or defective lower counter balance at the east 1 and east 2 windows in the 1st room from east at northIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108565
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash at the north window in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108557
- BPlumbing, sinks and toiletsRepair the broken or defective connection at waste drain line at the sink in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108568
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wash basin in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · rent impairing · Violation #19108564
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at south wall in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108561
- BOther repairsProperly repair with similar material the broken or defective vinyl floors in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108556
- BPlumbing, sinks and toiletsRepair the broken or defective connection at waste drain line at sink in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108558
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at north wall and ceiling in the bathroomIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108560
- CMoldTrace and repair the source and abate the visible mold condition greater then 30 sq feet at the east and south walls in the 1st room from east at southIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19108566
- BOther repairsProperly repair with similar material the broken or defective east wood base cabinet floor in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108567
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at the north wall in the kitchenIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108569
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 4, 2026 · fix by Aug 30, 2026 overdue · Violation #19108570
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east at northIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19108572
- BBroken doors or locksProperly repair or replace the broken or defective closet door at south wall in the foyerIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19087472
- BOther repairsProperly repair or replace the broken or defective intercom from vestibule to west wall in the foyerIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19087471
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of window blocked up by plywood. in the 3rd room from north at eastIssued Jul 24, 2026 · fix by Jul 30, 2026 overdue · Violation #19087474
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 24, 2026 · fix by Aug 19, 2026 overdue · Violation #19087480
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 24, 2026 · fix by Aug 19, 2026 overdue · Violation #19087479
- BOther repairsProperly repair or replace the broken or defective countertop in the kitchenIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19087477
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19087476
- BBroken doors or locksProperly repair or replace the broken or defective intercom system from building entrance door to west wall in the foyerIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19098126
- CLead paintReplace or repair the self-closing doors that is missing or defective firedoor leading to stair case ''a'' at public hall, 5th story, section at westIssued Jul 20, 2026 · fix by Aug 3, 2026 overdue · Violation #19082131
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at compactor closet, 6th story, section at westIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · rent impairing · Violation #19082120
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead , section at westIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082115
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door at bulkhead , section at westIssued Jul 20, 2026 · fix by Aug 3, 2026 overdue · Violation #19082112
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.