Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crotona Park East

899 East 169 Street, Bronx

10459 · 34 apartments · 5 stories · City Council district 17

By · Updated · Data from NYC HPD

C
12open immediately hazardous violations · 35 per 100 apartments
B21Hazardous, open
A6Non-hazardous, open
!33Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company899 E. 169th St. LLC
Landlord (head officer or owner)Rick Herman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    12
  2. Other repairs
    12
  3. Leaks and water damage
    4
  4. Mice or rats
    3
  5. Lead paint
    3
  6. Roaches
    2
  7. Broken doors or locks
    1
  8. Plumbing, sinks and toilets
    1
  9. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C88 days
from 23 closed · NYC typical: 87 days
B115 days
from 32 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at west and north walls in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361282
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at entrance door in the entranceIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361286
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19361281
  • B
    Other repairsProperly repair or replace the broken or defective upper escutcheon plate at riser in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361283
  • B
    Other repairsProperly repair or replace the broken or defective upper escutcheon plate at riser in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361287
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19361280
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19361284
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling and behind all walls in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279349
  • B
    Other repairsProperly repair with similar material the broken or defective cracked and erroded wood base cabinet in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279352
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279350
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279348
  • C
    Other repairsProperly repair with similar material the broken or defective cracked ceramic tiles at floor in the bathroomIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19279351
  • B
    Lead paintProvide lock and assembly at fire door at north leading to yard at public hall, 1st storyIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18822827
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and north wall at intermediate landing at public hall stairs,…Issued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18822837
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 21, 2025 · fix by Nov 25, 2025 overdue · Violation #18315685
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 7, 2025 · fix by Aug 2, 2025 overdue · rent impairing · Violation #18067506
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 1, 2024 · fix by Jul 27, 2024 overdue · Violation #17084195
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective lower base cabinet at the sink and east wall cabinets in the kitchenIssued Jul 1, 2024 · fix by Aug 5, 2024 overdue · Violation #17084197
  • B
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide ,at front of building, at fire escapeIssued May 18, 2023 · fix by Jun 22, 2023 overdue · rent impairing · Violation #15992968
  • B
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 1st fire escape from east at southIssued May 15, 2023 · fix by Jun 19, 2023 overdue · rent impairing · Violation #15976922
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of wood panneling at all walls in the 1st room from eastIssued Dec 12, 2022 · fix by Jan 16, 2023 overdue · Violation #15599432
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 1 sq ft and east wall approx 1 sq ft in the bathroomIssued Sep 15, 2022 · fix by Oct 20, 2022 overdue · Violation #15378088
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 29, 2022 · fix by Sep 24, 2022 overdue · Violation #15334218
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall and east wall in the bathroomIssued May 18, 2022 · fix by Jun 22, 2022 overdue · Violation #15168551
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 18, 2022 · fix by Jun 22, 2022 overdue · Violation #15168549
  • C
    Other repairsReplace with new the broken or defective upper window sash glass pane in the kitchenIssued May 18, 2022 · fix by May 24, 2022 overdue · Violation #15168554
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Mar 26, 2021 · fix by Mar 30, 2021 overdue · Violation #14087563
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Mar 19, 2021 · fix by Mar 23, 2021 overdue · Violation #14078871
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from eastIssued Aug 7, 2017 · fix by Sep 11, 2017 overdue · Violation #11911629
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from eastIssued Aug 7, 2017 · fix by Sep 11, 2017 overdue · rent impairing · Violation #11911628
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from eastIssued Jul 12, 2017 · fix by Jul 20, 2017 overdue · Violation #11872141
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Jun 29, 2017 · fix by Aug 3, 2017 overdue · Violation #11848795
  • B
    RoachesAbate the nuisance consisting of vermin roachesIssued Sep 20, 2007 · fix by Oct 25, 2007 overdue · Violation #6932758

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

142017
332018
112019
92020
472021
642022
232023
52024
192025
382026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 340 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.