Housing violations · Soundview-Bruckner-Bronx River
1670 East 174 Street, Bronx
10472 · 64 apartments · 8 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks26
- Other repairs18
- Peeling paint and plaster12
- Mold10
- Roaches6
- Mice or rats5
- Electrical problems3
- Leaks and water damage2
- Plumbing, sinks and toilets2
- Lead paint2
- Missing smoke or CO detector2
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 87 closed · NYC typical: 87 days
from 111 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BElectrical problemsReplace with new the missing electrical outlet covers at west wall at public hall, 3rd storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211839
- BElectrical problemsProperly repair or replace the broken or defective defective electrical outlet at west wall at public hall, 3rd storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211838
- BOther repairsProvide approved glass at building entrance and vestibule at public hall, 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211841
- BOther repairs& 309 m/d law abate the nuisance consisting of plexiglass installed at vestibule and building entrance at public hall, 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19211840
- BOther repairsProperly repair or replace the broken or defective base cabinet at west wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176150
- BBroken doors or locksProperly repair or replace the broken or defective door at north in the 1st room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176158
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176160
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over the ceiling in the 1st bathroom from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176147
- BOther repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176149
- BPlumbing, sinks and toiletsRepair the broken or defective connection drain pipe at wash basin in the 1st bathroom from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176152
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176159
- BOther repairsProperly repair or replace the broken or defective upper cabinet at east wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176148
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176154
- BBroken doors or locksProperly repair or replace the broken or defective closet door at west wall in the 1st room from east at centerIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176155
- BPlumbing, sinks and toiletsRepair the broken or defective connection drain pipe under sink in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176151
- BBroken doors or locksProperly repair or replace the broken or defective door at west wall in the 1st room from east at centerIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176156
- BBroken doors or locksProperly repair or replace the broken or defective closet door at west wall in the 1st room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19176157
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176161
- BMoldTrace and repair the source and abate the visible mold condition at west wall less than 10 sq ft in the bathroomIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19098297
- COther repairsImmediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect…Issued Jul 8, 2026 · fix by Jul 5, 2026 overdue · Violation #19061410
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass pane at entrance door, display window and vestibule door , 1st storyIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564392
- BOther repairsProperly repair with similar material the broken or defective ceiling and west wall with fire retardant materials at public hall, 1st storyIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18428878
- CBroken doors or locksProperly repair or replace the broken or defective latch and assembly at 2nd fire door from west at north (stairwell ''b'') at public hall, 1st storyIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18284122
- BBroken doors or locksProperly repair or replace the broken or defective latch and assembly at door to compactor closet 1st sty at compactor closetIssued Aug 18, 2025 · fix by Sep 22, 2025 overdue · Violation #18156013
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall and ceiling in the kitchenIssued Mar 7, 2025 · fix by Mar 13, 2025 overdue · Violation #17741051
- BMoldTrace and repair the source and abate the visible mold condition less than 20sqft ceiling at east and south wall in the 1st bathroom from northIssued Feb 24, 2025 · fix by Mar 31, 2025 overdue · Violation #17711020
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 30, 2025 · fix by Feb 25, 2025 overdue · Violation #17659890
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 30, 2025 · fix by Jan 30, 2025 overdue · rent impairing · Violation #17659891
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 30, 2025 · fix by Feb 5, 2025 overdue · Violation #17659893
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door at vestibule to 1st story public hall , 1st storyIssued Oct 18, 2024 · fix by Nov 1, 2024 overdue · Violation #17356124
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door to 1st story public hall , 1st storyIssued Sep 11, 2024 · fix by Sep 25, 2024 overdue · Violation #17257839
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 11, 2024 · fix by Oct 7, 2024 overdue · Violation #17257834
- CLead paintReplace or repair the self-closing doors that is missing or defective latch set at fire door leading to staircase ''a'' at public hall, 8th storyIssued Aug 6, 2024 · fix by Aug 20, 2024 overdue · Violation #17173831
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective [latch] at staircase ''a'' door at public hall, 4th storyIssued May 22, 2024 · fix by Jun 5, 2024 overdue · Violation #16994195
- BMoldTrace and repair the source and abate the visible mold condition inside closet at ceiling apprx. 8 sq ft. at west wall approz 6 sq ft. in the private hallwayIssued May 22, 2024 · fix by Jun 26, 2024 overdue · Violation #16993793
- CBroken doors or locksProperly repair or replace the broken or defective latch set at staircase a door at public hall, 4th storyIssued May 22, 2024 · fix by May 28, 2024 overdue · Violation #16992705
- CBroken doors or locksProperly repair or replace the broken or defective latch set at staircase b door at public hall, 4th storyIssued May 22, 2024 · fix by May 28, 2024 overdue · Violation #16992715
- CBroken doors or locksProperly repair or replace the broken or defective latch at door to staircase a at 4th story publi`c hallIssued Feb 29, 2024 · fix by Mar 6, 2024 overdue · Violation #16701899
- BBroken doors or locksProvide security in the event of a power outage by means of an acceptable mechical heavy duty lock and latch set at door from vestibule to 1st story public hallIssued Feb 29, 2024 · fix by Apr 4, 2024 overdue · Violation #16707723
- CMoldTrace and repair the source and abate the visible mold condition approx 30 sqft at ceiling in the kitchenIssued Feb 29, 2024 · fix by Mar 26, 2024 overdue · Violation #16707702
- BBroken doors or locksProperly repair or replace the broken or defective latch set at fire stairs door '' a '' 5th storyIssued Dec 5, 2023 · fix by Jan 9, 2024 overdue · Violation #16501861
- BBroken doors or locksProperly repair or replace the broken or defective latch set at fire stairs door '' b '' 5th storyIssued Dec 5, 2023 · fix by Jan 9, 2024 overdue · Violation #16501864
- BBroken doors or locksProperly repair or replace the broken or defective latch set at compactor closet door, 7th story public hallwayIssued Dec 5, 2023 · fix by Jan 9, 2024 overdue · Violation #16501843
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 21, 2023 · fix by Dec 17, 2023 overdue · Violation #16395069
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 21, 2023 · fix by Dec 17, 2023 overdue · Violation #16395075
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 21, 2023 · fix by Dec 17, 2023 overdue · Violation #16395072
- BMoldTrace and repair the source and abate the visible mold condition approx 20 sq ft at celing in the private hallwayIssued Nov 8, 2023 · fix by Dec 13, 2023 overdue · Violation #16364082
- CBroken doors or locksRemove the illegal fastening unacceptable two motion electromagnetic locking device installed at vestibule door (vestibule to 1st sty public hallway)Issued Nov 8, 2023 · fix by Nov 14, 2023 overdue · rent impairing · Violation #16364079
- BMoldTrace and repair the source and abate the visible mold condition approx 15 sq ft at ceiling in the 2nd room from east at southIssued Nov 8, 2023 · fix by Dec 13, 2023 overdue · Violation #16364081
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 6, 2023 · fix by Nov 1, 2023 overdue · Violation #16287571
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at westIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15484701
- CMoldTrace and repair the source and abate the visible mold condition at ceiling appr 16 sq ft, north wall appr 4 sq ft, south wall appr. 4 sq ft, east wall appr 6…Issued Nov 7, 2022 · fix by Dec 3, 2022 overdue · Violation #15484704
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15484700
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15484703
- BOther repairsProperly repair with similar material the broken or defective wood base board at east and north wall in the 1st room from north at westIssued Nov 7, 2022 · fix by Dec 12, 2022 overdue · Violation #15484709
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 4 sq ft in the bathroomIssued Oct 21, 2021 · fix by Nov 25, 2021 overdue · Violation #14638654
- CBroken doors or locksRemove the illegal fastening consisting of an unacceptable eltromagnetic locking device installed at the building entrance doorIssued Jul 30, 2021 · fix by Aug 5, 2021 overdue · rent impairing · Violation #14469131
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Oct 28, 2020 · fix by Dec 2, 2020 overdue · Violation #13869956
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Oct 28, 2020 · fix by Dec 2, 2020 overdue · Violation #13869958
- BMoldTrace and repair the source and abate the visible mold condition at the east wall (approx. 6 sq. ft.) in the 1st room from eastIssued Jan 27, 2020 · fix by Mar 2, 2020 overdue · Violation #13567320
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.