Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Tremont

710 East 175 Street, Bronx

10457 · 8 apartments · 4 stories · City Council district 17

By · Updated · Data from NYC HPD

C
58open immediately hazardous violations · 725 per 100 apartments
B198Hazardous, open
A43Non-hazardous, open
!299Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

15 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyCARROLL BURKE DEVELOPMENT CORP.

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    95
  2. Peeling paint and plaster
    73
  3. Leaks and water damage
    39
  4. Mold
    20
  5. Broken doors or locks
    15
  6. Electrical problems
    14
  7. Missing smoke or CO detector
    14
  8. Roaches
    13
  9. Mice or rats
    8
  10. Plumbing, sinks and toilets
    4
  11. Lead paint
    2
  12. Missing window guards
    2
  13. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C92 days
from 73 closed · NYC typical: 87 days
B133 days
from 15 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18663060
  • B
    Other repairsProperly repair or replace the broken or defective mortise latchset in the entranceIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18358869
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling and north wall in the bathroomIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18358863
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18358859
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl flooring in the kitchenIssued Nov 12, 2025 · fix by Dec 17, 2025 overdue · Violation #18358865
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from northIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18321375
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at walls in the kitchenIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321373
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling and all walls in the bathroomIssued Oct 22, 2025 · fix by Nov 17, 2025 overdue · Violation #18321357
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18321372
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of plants preventing free egress at fire escape, rear yardIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18321369
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321367
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321366
  • B
    Broken doors or locksReplace with new the missing wall cabinet doors at east wall in the kitchenIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321365
  • C
    Other repairsProperly repair with similar material the broken or defective marble saddle at bathroom entrance in the bathroomIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18321361
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor. in the bathroomIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321358
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2025 · fix by Nov 17, 2025 overdue · Violation #18321370
  • B
    Broken doors or locksReplace with new the missing base cabinet door at east wall in the kitchenIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321364
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18321363
  • C
    Other repairsReplace with new the missing vinyl tiles at floor at public hall, 3rd storyIssued Oct 22, 2025 · fix by Oct 28, 2025 overdue · Violation #18321368
  • B
    Other repairsReplace with new the missing ceramic tiles at east wall at public hall, 1st storyIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321345
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the kitchenIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321362
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from northIssued Oct 22, 2025 · fix by Nov 26, 2025 overdue · Violation #18321376
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18099744
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 21, 2025 · fix by Feb 16, 2025 overdue · Violation #17633988
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 14, 2025 · fix by Jan 20, 2025 overdue · Violation #17619753
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Jan 2, 2025 · fix by Feb 6, 2025 overdue · Violation #17591468
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Jan 2, 2025 · fix by Feb 6, 2025 overdue · rent impairing · Violation #17591469
  • B
    Other repairsProperly repair or replace the broken or defective window balance at lower sash in the kitchenIssued Dec 27, 2024 · fix by Jan 31, 2025 overdue · Violation #17577052
  • C
    Other repairsProperly repair or replace the broken or defective base cabinet in the kitchenIssued Dec 27, 2024 · fix by Jan 2, 2025 overdue · Violation #17577048
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Dec 3, 2024 · fix by Jan 7, 2025 overdue · rent impairing · Violation #17507589
  • B
    Other repairsProperly repair with similar material the broken or defective defective 1st concrete tread from the bottom at north yardIssued Dec 3, 2024 · fix by Jan 7, 2025 overdue · Violation #17507595
  • B
    Other repairsProperly repair with similar material the broken or defective wood treads 1, 2,3 4,5, 6 from bottom at public hall stairs, 2nd storyIssued Nov 21, 2024 · fix by Dec 26, 2024 overdue · Violation #17435660
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · rent impairing · Violation #17435656
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tile in the private hallwayIssued Nov 20, 2024 · fix by Dec 25, 2024 overdue · Violation #17435655
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the kitchenIssued Nov 8, 2024 · fix by Dec 13, 2024 overdue · Violation #17407818
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · Violation #17385207
  • C
    Other repairsProperly repair or replace the broken or defective radiator air valve in the 5th room from northIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · Violation #17385218
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · Violation #17385211
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · rent impairing · Violation #17385230
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tile in the private hallwayIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17385206
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Oct 30, 2024 · fix by Dec 4, 2024 overdue · Violation #17385204
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at west and east wall at vestibule at public hall, 1st storyIssued Oct 23, 2024 · fix by Nov 27, 2024 overdue · Violation #17369368
  • B
    Other repairsProperly repair or replace the broken or defective ceramic soap holder at north wall in the bathroomIssued Oct 9, 2024 · fix by Nov 13, 2024 overdue · Violation #17323583
  • C
    Other repairsProperly repair with similar material the broken or defective rubberize roof coveringIssued Oct 9, 2024 · fix by Oct 15, 2024 overdue · Violation #17323543
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 12, 2024 · fix by Oct 8, 2024 overdue · Violation #17270690
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 12, 2024 · fix by Oct 8, 2024 overdue · Violation #17270688
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Sep 12, 2024 · fix by Oct 17, 2024 overdue · Violation #17270692
  • B
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the garbage at front yardIssued Sep 12, 2024 · fix by Oct 17, 2024 overdue · rent impairing · Violation #17270702
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material east wall at vestibule at public hall, 1st storyIssued Sep 12, 2024 · fix by Oct 17, 2024 overdue · Violation #17270698
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallwayIssued Sep 11, 2024 · fix by Sep 17, 2024 overdue · Violation #17263407
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17219266
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in private hall in the private hallwayIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17219637
  • C
    RoachesAbate the infestation consisting of roaches in the private hallwayIssued Aug 27, 2024 · fix by Sep 22, 2024 overdue · Violation #17219645
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at bath tub in bathroom in the bathroomIssued Aug 27, 2024 · fix by Oct 1, 2024 overdue · Violation #17226219
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 4th storyIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · rent impairing · Violation #17165084
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tile floor in the kitchenIssued Jul 1, 2024 · fix by Aug 5, 2024 overdue · Violation #17089886
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 1, 2024 · fix by Jul 27, 2024 overdue · Violation #17089880
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the front area way at public hallIssued May 31, 2024 · fix by Jul 5, 2024 overdue · Violation #17010795
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of lifting vinyl tiles at floor approx 5 sqft in the kitchenIssued May 31, 2024 · fix by Jul 5, 2024 overdue · Violation #17010779
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the building frontIssued Apr 22, 2024 · fix by May 27, 2024 overdue · Violation #16901530

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

262017
342018
152019
52020
972021
1142022
712023
1352024
422025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 594 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.