Housing violations · Mount Hope
265 East 176 Street, Bronx
10457 · 21 apartments · 5 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster24
- Broken doors or locks22
- Other repairs22
- Roaches13
- Missing smoke or CO detector13
- Mice or rats11
- Lead paint11
- Mold8
- No heat or hot water7
- Leaks and water damage6
- Plumbing, sinks and toilets4
- Bedbugs2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 5 closed · NYC typical: 87 days
from 16 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at westIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346653
- BMoldTrace and repair the source and abate the visible mold condition observed less than 30 sqft at ceiling and north wall in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346652
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19346649
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at westIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346654
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19346656
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash 2nd window from east at south wall in the 4th room from north at westIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19346655
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19346651
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19346650
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346648
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash 1st window from east at south wall in the 4th room from north at eastIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19346647
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19176763
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19176764
- BOther repairsProperly repair or replace the broken or defective spring balance at lower and upper sashes at window in the 2nd room from northIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19137104
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19137099
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19137100
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 14, 2026 · fix by Sep 7, 2026 overdue · Violation #19143893
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Aug 14, 2026 · fix by Aug 28, 2026 overdue · Violation #19137101
- BOther repairsProperly repair or replace the broken or defective spring balance at lower and upper sashes at 1st and 2nd windows from east at south in the 4th room from…Issued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19137103
- BMoldTrace and repair the source and abate the visible mold condition mold less than 20sq feet at ceiling and all walls in the bathroomIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18688707
- BOther repairsProperly repair or replace the broken or defective upper window sash in the 2nd room from eastIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18688703
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from eastIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18688704
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 2nd room from eastIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18688706
- CLead paintProperly repair or replace the broken or defective spring counter balance at lower window sash causing guillontine effect leading to fire escape in the 2nd…Issued Mar 9, 2026 · fix by Mar 15, 2026 overdue · Violation #18688705
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges to entrance door in the entranceIssued Mar 9, 2026 · fix by Mar 23, 2026 overdue · Violation #18688708
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees in the entire apartmentIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18613151
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from eastIssued Feb 2, 2026 · fix by Feb 2, 2026 overdue · rent impairing · Violation #18613149
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18613150
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the boiler roomIssued Jan 26, 2026 · fix by Feb 9, 2026 overdue · Violation #18591611
- BOther repairsProperly repair or replace the broken or defective latch set at boiler room in the boiler roomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18591613
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door hinges in the meter roomIssued Jan 26, 2026 · fix by Feb 9, 2026 overdue · Violation #18591617
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door hnges in the entranceIssued Jan 26, 2026 · fix by Feb 9, 2026 overdue · Violation #18591620
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at upper window sash from north at east in the bathroomIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098770
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17915751
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallwayIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17915754
- BBroken doors or locksProperly repair or replace the broken or defective door in the 1st room from north at westIssued May 27, 2025 · fix by Jul 1, 2025 overdue · Violation #17915752
- BMoldTrace and repair the source and abate the visible mold condition less 10sq ft at ceiling and south in the bathroomIssued Apr 15, 2025 · fix by May 20, 2025 overdue · Violation #17833942
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash from north at east in the bathroomIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17758091
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty lock and assembly at building entrance door , 1st storyIssued Mar 17, 2025 · fix by Mar 23, 2025 overdue · Violation #17758082
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exeeding over 130 degrees fareinheint at kitchen and in the bathroomIssued Feb 13, 2025 · fix by Feb 19, 2025 overdue · Violation #17687862
- CBroken doors or locksProperly repair or replace the broken or defective key operated locking device at building entrance door at public hall, 1st storyIssued Feb 11, 2025 · fix by Feb 17, 2025 overdue · Violation #17681932
- CBroken doors or locksProperly repair or replace the broken or defective heavy duty mortise lock at door at building entrance , 1st storyIssued Feb 3, 2025 · fix by Feb 9, 2025 overdue · Violation #17665776
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Dec 30, 2024 · fix by Jan 5, 2025 overdue · Violation #17586179
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17552188
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17552189
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed loose ceiling (15 sqft) in the bathroomIssued Dec 16, 2024 · fix by Dec 22, 2024 overdue · Violation #17552187
- CBroken doors or locksProvide ready access to buildings heating system door lock at boiler roomIssued Dec 16, 2024 · fix by Dec 22, 2024 overdue · Violation #17552184
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17552192
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17552191
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 2nd room from north at eastIssued Dec 16, 2024 · fix by Dec 14, 2024 overdue · rent impairing · Violation #17552183
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water in excess of 133 degrees farenheit at the faucets at the bathroom and kitchen. (140 degrees)Issued Dec 16, 2024 · fix by Dec 22, 2024 overdue · Violation #17552185
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electric wires at the electric outlet at south wallIssued Dec 16, 2024 · fix by Dec 22, 2024 overdue · Violation #17552186
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 18, 2024 · fix by Dec 14, 2024 overdue · Violation #17423297
- CBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door [from street to vestibule] , 1st storyIssued Nov 12, 2024 · fix by Nov 18, 2024 overdue · Violation #17409770
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door (missing) [from vestibule to public hall] at public hall, 1st storyIssued Nov 12, 2024 · fix by Nov 26, 2024 overdue · Violation #17409768
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2024 · fix by Nov 3, 2024 overdue · Violation #17321235
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color approx 12 sq.ft unkeyed sheetrock at ceiling in the bathroomIssued Oct 8, 2024 · fix by Oct 14, 2024 overdue · Violation #17321233
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak active water leak at ceiling in the bathroomIssued Oct 8, 2024 · fix by Oct 14, 2024 overdue · Violation #17321234
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 8, 2024 · fix by Nov 3, 2024 overdue · Violation #17321236
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17138185
- COther repairsProperly repair with similar material the broken or defective glass pane at lower window sash in the kitchenIssued Jul 29, 2024 · fix by Aug 4, 2024 overdue · Violation #17138192
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.