Housing violations · Ridgewood
1819 George Street, Queens
11385 · 6 apartments · 3 stories · City Council district 34
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
68 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs86
- Electrical problems45
- Broken doors or locks42
- Peeling paint and plaster24
- No heat or hot water21
- Leaks and water damage15
- Lead paint10
- Mold9
- Plumbing, sinks and toilets7
- Missing smoke or CO detector6
- Roaches3
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 64 closed · NYC typical: 87 days
from 28 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures throughout entire apartment at ceiling and all walls in the entire apartmentIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19358453
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · rent impairing · Violation #19358452
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles floor in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19353152
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19353150
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19353151
- BOther repairsProvide adequate light of not less than 60 watts incandescent or equivalent illumination , at public hall, 3rd storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19332858
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures ceiling and all walls in the entire apartmentIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338290
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338293
- BOther repairsProperly repair or replace the broken or defective lower sash and upper sash counter balance 2nd window at west wall. in the 1st room from eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338292
- BOther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · rent impairing · Violation #19338291
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19328000
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures all walls and ceiling in the entire apartmentIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19328004
- CBroken doors or locksProvide ready access to buildings heating system door locked at public hall 1st story at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19328001
- COther repairsProperly repair or replace the broken or defective counter balance at lower sash at fire escape window in the kitchenIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19328003
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19328002
- CNo heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19305481
- CLead paintProvide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19306373
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at 2nd window from west at north wall in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19305485
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at secondary egress door in the 5th room from northIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19306374
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 19, 2026 · fix by Oct 17, 2026 overdue · rent impairing · Violation #19305483
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19305486
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 19, 2026 · fix by Oct 18, 2026 overdue · rent impairing · Violation #19306372
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306371
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft and less than 30 sq ft observed at ceiling and west wall in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306370
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19305482
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · rent impairing · Violation #19298337
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures all walls and ceiling in the entire apartmentIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19298336
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of padlockable slide bolt installed at door in the entranceIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19298340
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297147
- CBroken doors or locksProvide ready access to buildings heating system door to basement locked at 1st story public hall at boiler roomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19297149
- CBroken doors or locksProvide ready access to buildings heating system door locked at 1st story public hall. at boiler room, 1st storyIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19298335
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19298338
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 15, 2026 · fix by Oct 29, 2026 overdue · Violation #19298339
- CLead paintProvide ready access to buildings heating system door leading to boiler room locked at public hall at 1st story at boiler room, 1st storyIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19293627
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277207
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19277206
- COther repairsProvide ready access to buildings heating system no access to boiler room at basement at boiler roomIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19276148
- BOther repairsProperly repair or replace the broken or defective glass pane at upper window sash in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19263335
- BBroken doors or locksProvide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19263337
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19258905
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258909
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258908
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258907
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258904
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258901
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19258900
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline under sink in the kitchenIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19258899
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19258897
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from northIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19258898
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective fire door missing at boiler room at basement story at public hallIssued Sep 30, 2026 · fix by Oct 14, 2026 overdue · Violation #19257577
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257572
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257571
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258673
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258894
- BOther repairsProperly repair or replace the broken or defective ventilation fan at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258895
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges and latch set at fire door to basement at public hall, 1st storyIssued Sep 30, 2026 · fix by Oct 14, 2026 overdue · Violation #19257579
- BBroken doors or locksProperly repair or replace the broken or defective latch set at fire door to basement at public hall, 1st storyIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19257580
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 30, 2026 · fix by Sep 30, 2026 overdue · rent impairing · Violation #19257575
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258670
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 30, 2026 · fix by Nov 4, 2026 overdue · Violation #19258671
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.