Housing violations · Mount Hope
110 East 177 Street, Bronx
10453 · 55 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster145
- Other repairs114
- Broken doors or locks64
- Leaks and water damage51
- Missing smoke or CO detector47
- Roaches37
- Mold33
- Lead paint30
- Mice or rats28
- Plumbing, sinks and toilets20
- No heat or hot water6
- Electrical problems5
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 90 closed · NYC typical: 87 days
from 155 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 5, 2026 · fix by Nov 19, 2026 · Violation #19350356
- BOther repairsProperly repair or replace the broken or defective spring balance upper and lower window sash second window from west at south in the 3rd room from north at…Issued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19350615
- BOther repairsReplace with new the missing marble tiles at north wall at vestibule at public hall, 1st storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341015
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall behind the gas stove in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19299944
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19299943
- BMoldTrace and repair the source and abate the visible mold condition less than 15sqft at window in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19274015
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east and south wall in the kitchenIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255985
- BOther repairsProperly repair or replace the broken or defective buzzer and return voice system from building entrance up to panel at north wall in the private hallwayIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19247079
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19247076
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19247077
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19253895
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238442
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238441
- BOther repairsProperly repair or replace the broken or defective buzzer and return voice system from building vestibule up to panel at north wall in the private hallwayIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19238446
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2026 · fix by Oct 21, 2026 overdue · Violation #19253922
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19253896
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Sep 23, 2026 · fix by Oct 28, 2026 overdue · Violation #19236024
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding over 130 degrees at all plumbing fixtures in the kitchenIssued Sep 23, 2026 · fix by Sep 29, 2026 overdue · Violation #19236026
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 23, 2026 · fix by Sep 29, 2026 overdue · Violation #19236023
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19228895
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19228892
- BBroken doors or locksProperly repair or replace the broken or defective intercom system from building entrance door to panel at north wall in the foyerIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19228894
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19228893
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19220269
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19220270
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221923
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19225092
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and north wall in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19221922
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219163
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219158
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219157
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219155
- BOther repairsProperly repair or replace the broken or defective buzzer and return voice system from building vestibule up to panel at north wall in the entranceIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19219159
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft at ceiling in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19220461
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19209480
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19209479
- BOther repairsProperly repair or replace the broken or defective intercom at south wall in the private hallwayIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202136
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202133
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall and ceiling at public hall, 6th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191364
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at all walls and ceiling at 1st public hall bulkhead from north, 6th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191362
- BBroken doors or locksProperly repair or replace the broken or defective bell buzer intercom system from building entrance door to wall panel at north wall in the foyerIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192216
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19192215
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof at 1st public hall bulkhead from north, 6th storyIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19191366
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at west wall in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19206650
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19183775
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 4, 2026 · fix by Sep 30, 2026 overdue · Violation #19183774
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entranceIssued Sep 4, 2026 · fix by Sep 18, 2026 overdue · Violation #19183773
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entranceIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19183782
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entranceIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19183800
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment entrance door in the entranceIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19183793
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at window in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19194478
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183799
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183798
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183776
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183760
- BMoldTrace and repair the source and abate the visible mold condition more than 10 less than 30 square feet at ceiling and all walls in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183762
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Sep 3, 2026 · fix by Sep 17, 2026 overdue · Violation #19183766
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19183783
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19183784
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19183789
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.