Housing violations · Fordham Heights
355 East 187 Street, Bronx
10458 · 129 apartments · 6 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
33 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs100
- Peeling paint and plaster95
- Broken doors or locks90
- Lead paint54
- Missing smoke or CO detector47
- Leaks and water damage38
- Mice or rats34
- Roaches27
- Mold26
- Plumbing, sinks and toilets17
- Electrical problems11
- No heat or hot water10
- Missing window guards4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 147 closed · NYC typical: 87 days
from 93 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at building entrance door at public hall, 2nd story, section ''j''Issued Nov 16, 2026 · Violation #19371512
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assembly at building entrance door at public hall, 2nd story, section ''j''Issued Nov 16, 2026 · Violation #19371511
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 2nd story, section ''j''Issued Nov 16, 2026 · Violation #19371510
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 16, 2026 · Violation #19371501
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Nov 16, 2026 · Violation #19371502
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 16, 2026 · Violation #19371503
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Nov 16, 2026 · Violation #19371504
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 16, 2026 · Violation #19371505
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at westIssued Nov 16, 2026 · Violation #19371506
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at westIssued Nov 16, 2026 · Violation #19371507
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19371508
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 16, 2026 · Violation #19371509
- BBroken doors or locksProvide glass in lieu of plexi at building entrance door at public hall, 2nd story, section ''a''Issued Nov 16, 2026 · Violation #19371516
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at building entrance door at public hall, 2nd story, section ''a''Issued Nov 16, 2026 · Violation #19371515
- BBroken doors or locksProvide glass in lieu of plexi at building entrance door at public hall, 2nd story, section ''j''Issued Nov 16, 2026 · Violation #19371513
- BBroken doors or locksProperly repair or replace the broken or defective 3rd cabinet door from east at south wall in the kitchenIssued Nov 16, 2026 · Violation #19371496
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 16, 2026 · Violation #19371497
- BBroken doors or locksProperly repair or replace the broken or defective latch and its assembly at building entrance door at public hall, 2nd story, section ''a''Issued Nov 16, 2026 · Violation #19371518
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 2nd story, section ''a''Issued Nov 16, 2026 · Violation #19371517
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 16, 2026 · Violation #19371498
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 16, 2026 · Violation #19371500
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19324549
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19324545
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at westIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19310671
- COther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · Violation #19310668
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet at the west wall in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19310669
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19310673
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 20, 2026 · fix by Nov 15, 2026 overdue · rent impairing · Violation #19310675
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19310674
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 20, 2026 · fix by Nov 15, 2026 overdue · rent impairing · Violation #19310672
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19298359
- BLead paintProvide approved glass at building entrance door leading to public hall at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19298912
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19305619
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 2nd room from northIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19298358
- BOther repairsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19298360
- COther repairsAbate the nuisance consisting of excessive storage of material household items at floor (causing fire hazard) in the entire apartmentIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19298362
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19298364
- CLead paintProperly repair or replace the broken or defective heavy duty mortise lock at building entrance door leading to public hall , 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19298366
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 19, 2026 · fix by Nov 14, 2026 overdue · rent impairing · Violation #19298367
- CLead paintReplace or repair the self-closing doors that is missing or defective latch at building entrance door leading to public hall at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19298904
- BBroken doors or locksProperly repair or replace the broken or defective latch set and assemblies at building entrance door at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19298905
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19298907
- CLead paintReplace or repair the self-closing doors that is missing or defective latch at building entrance door leading to public hall at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19298908
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19298910
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door at public hall, 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19298911
- BOther repairsProperly repair with similar material the broken or defective fire retarded material at east wall at public hall stairs, 3rd storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19298913
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303819
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303820
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303821
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303822
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303823
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303824
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303825
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303828
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at bulkhead area at north wall and south wall at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303830
- CBroken doors or locksProperly repair or replace the broken or defective lock set and assemblies at building entrance door at b section , 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303832
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexiglass installed at building entrance door , 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303833
- BBroken doors or locksProvide approved glass in the place of building entrance door , 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303834
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19304264
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at door in the entranceIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19304265
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.