Housing violations · Belmont
693 East 189 Street, Bronx
10458 · 20 apartments · 5 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
13 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs65
- Peeling paint and plaster63
- Leaks and water damage33
- Broken doors or locks14
- Lead paint10
- Plumbing, sinks and toilets7
- Missing smoke or CO detector7
- Mice or rats6
- Roaches5
- Mold5
- Electrical problems1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 87 closed · NYC typical: 87 days
from 52 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19289946
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19289940
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19289939
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19241001
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19241002
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchenIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19187813
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchenIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19187814
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective basin cabinet wood floor under sink in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19187820
- CMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19142671
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049560
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049569
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · rent impairing · Violation #19049568
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · rent impairing · Violation #19049555
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the kitchenIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · rent impairing · Violation #19049559
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049557
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049556
- COther repairsProperly repair with similar material the broken or defective bricks and mortar west exterior wall 1st story at building east side , 1st storyIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049563
- COther repairsProperly repair or replace the broken or defective covering at entire roofIssued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049562
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18980484
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18980485
- COther repairsProperly repair with similar material the broken or defective bricks and mortar at west exterior parapet wall at west yard , 5th storyIssued Jun 5, 2026 · fix by Jun 11, 2026 overdue · Violation #18983126
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from east at northIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863539
- COther repairsProperly repair with similar material the broken or defective fire retardant material at north wall east wall and west wall at 1st public hall bulkhead from…Issued May 5, 2026 · fix by May 11, 2026 overdue · Violation #18863550
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north wall east at intermediate landing at public hall stairs, 4th…Issued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863555
- BOther repairsProperly repair or replace the broken or defective glass at lower sash north wall at public hall stairs, 1st storyIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863566
- BOther repairsProperly repair or replace the broken or defective porcelain glaze at bath tub in the bathroomIssued May 5, 2026 · fix by Jun 9, 2026 overdue · Violation #18863617
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18784430
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18784449
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18784426
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles at east wall at bathtub in the bathroomIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18784447
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18784440
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 13, 2026 · fix by Apr 19, 2026 overdue · Violation #18784442
- COther repairsProperly repair with similar material the broken or defective bricks and mortar east exterior wall at parapetIssued Apr 10, 2026 · fix by Apr 16, 2026 overdue · Violation #18764022
- COther repairsProperly repair with similar material the broken or defective fire retardant material north wall at intermediat landing between 2nd and 3rd story at public…Issued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18717142
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st storyIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18717135
- BLead paintProperly repair or replace the broken or defective iron fence at stairs leading to rear yard at public hall, 1st storyIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18708655
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678885
- COther repairsProperly secure the loose frame at protection screen under skiylight a t bulkhead at public hall, 5th storyIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678867
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678896
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18678879
- CLeaks and water damageRepair the roof so that it will not leak over ceiling at bulkhead at public hall, 5th storyIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · rent impairing · Violation #18678849
- BOther repairsProperly repair with similar material the broken or defective at ceiling at bulkhead at public hall, 5th storyIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18678851
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective cabinet under wash basin in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18678899
- BOther repairsProperly repair or replace the broken or defective bell and buzzer at north wall in the kitchenIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18678893
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18678902
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678877
- COther repairsProperly repair or replace the broken or defective entire bell and buzzers at front entrance to the building , 1st storyIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678914
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the kitchenIssued Mar 2, 2026 · fix by Mar 8, 2026 overdue · Violation #18678901
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall and and west wall in the 1st room from east at northIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663739
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and west wall in the 1st room from east at northIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663741
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from eastIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663744
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling bulkheadIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663761
- CLeaks and water damageRepair the roof so that it will not leak over ceiling at bulkheadIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · rent impairing · Violation #18663752
- BOther repairsProperly repair with similar material the broken or defective roof material flashing at duwbwaiterIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663756
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663730
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18663736
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Jan 26, 2026 · fix by Feb 1, 2026 overdue · Violation #18595088
- BBroken doors or locksProperly repair or replace the broken or defective latch and it's assemblies at building entrance door 1st storyIssued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18378366
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2025 · fix by Dec 1, 2025 overdue · Violation #18343465
- BLeaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18325107
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.