Housing violations · Bedford Park
219 East 196 Street, Bronx
10458 · 54 apartments · 5 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint21
- Other repairs14
- Broken doors or locks10
- Peeling paint and plaster9
- Roaches6
- Mice or rats6
- Plumbing, sinks and toilets6
- No heat or hot water5
- Leaks and water damage5
- Mold2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 36 closed · NYC typical: 87 days
from 60 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door at 1st public hall bulkhead from east, 5th story, section ''east''Issued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311049
- BOther repairsReplace with new the missing 2nd baluster up from bottom at 1st staircase at public hall stairs, 4th story, section ''west''Issued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311050
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311047
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at roof door at 2nd public hall bulkhead from east, 5th story, section ''west''Issued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311051
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 20, 2026 · fix by Nov 15, 2026 overdue · Violation #19311048
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19297960
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19297959
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19297513
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19297511
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · Violation #19297512
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19297514
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278541
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19278537
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 8, 2026 · fix by Nov 3, 2026 overdue · Violation #19278536
- BOther repairsProperly secure the loose upper cabinets at north wall in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278540
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 6, 2026 · fix by Oct 30, 2026 overdue · Violation #19280770
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270525
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275529
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275525
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275524
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275523
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275527
- BOther repairsRemove all encumbrances consisting of household items at floor landing at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270528
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270526
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275526
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 5, 2026 · fix by Oct 29, 2026 overdue · Violation #19275528
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 29, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19256857
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Sep 29, 2026 · fix by Oct 5, 2026 overdue · Violation #19256858
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 29, 2026 · fix by Oct 25, 2026 overdue · Violation #19256859
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19247210
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19247209
- BOther repairsProperly repair with similar material the broken or defective west retaining wall at west yardIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19084053
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047279
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047277
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047276
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047275
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047278
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047281
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 29, 2026 · fix by Jul 23, 2026 overdue · Violation #19047280
- BBroken doors or locksProperly repair with similar material the broken or defective door frame wood casing in the entranceIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18940865
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2026 · fix by Jun 14, 2026 overdue · Violation #18940863
- BBroken doors or locksRefit door in the entranceIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18940864
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 19, 2026 · fix by Jun 14, 2026 overdue · Violation #18940862
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18741590
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st storyIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18741588
- COther repairsProperly repair or replace the broken or defective air valve at radiator at east wall in the 1st room from east at northIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18710638
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Dec 2, 2025 · fix by Dec 28, 2025 overdue · rent impairing · Violation #18471841
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 1, 2025 · fix by Nov 30, 2025 overdue · rent impairing · Violation #18471839
- CBroken doors or locksProvide ready access to buildings heating system boiler room locked at basementIssued Dec 1, 2025 · fix by Dec 7, 2025 overdue · Violation #18471840
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295941
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Feb 5, 2024 · fix by Feb 29, 2024 overdue · Violation #16652272
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 19, 2023 · fix by May 13, 2023 overdue · Violation #15935162
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 19, 2023 · fix by May 15, 2023 overdue · Violation #15929544
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 19, 2023 · fix by May 13, 2023 overdue · Violation #15935160
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 19, 2023 · fix by May 13, 2023 overdue · Violation #15935180
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Apr 19, 2023 · fix by May 13, 2023 overdue · Violation #15935161
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 19, 2023 · fix by May 15, 2023 overdue · Violation #15929547
- BMoldTrace and repair the source and abate the visible mold condition approximately 1sq.ft at window stool north wall in the bathroomIssued Dec 21, 2022 · fix by Jan 25, 2023 overdue · Violation #15629711
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 8, 2021 · fix by Dec 4, 2021 overdue · Violation #14660371
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Jun 17, 2020 · fix by Jul 22, 2020 overdue · Violation #13694629
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.