Housing violations · Bedford Park
275 East 201 Street, Bronx
10458 · 61 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs10
- Peeling paint and plaster7
- Mold5
- Plumbing, sinks and toilets2
- Lead paint1
- Electrical problems1
- Roaches1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 82 closed · NYC typical: 87 days
from 87 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19222744
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling and east wall and south wall in the bathroomIssued Jun 9, 2026 · fix by Jul 14, 2026 overdue · Violation #18996502
- BOther repairsProperly repair or replace the broken or defective upper window sash counter balance at 1st window in the 1st room from eastIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18740883
- BOther repairsProperly repair with similar material the broken or defective vinyl tile floor in the kitchenIssued Sep 12, 2025 · fix by Oct 17, 2025 overdue · Violation #18218154
- BOther repairsProperly repair with similar material the broken or defective plywood sub floor in the kitchenIssued Sep 12, 2025 · fix by Oct 17, 2025 overdue · Violation #18218153
- BOther repairsProperly repair with similar material the broken or defective wood subfloor in the kitchenIssued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18123804
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 1, 2025 · fix by Sep 5, 2025 overdue · Violation #18123805
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall, ceiling, north wall, ceiling in the foyerIssued Oct 17, 2024 · fix by Nov 21, 2024 overdue · Violation #17345664
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Sep 12, 2024 · fix by Oct 6, 2024 overdue · Violation #17269935
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17263868
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the kitchenIssued Sep 11, 2024 · fix by Oct 16, 2024 overdue · Violation #17257755
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17246589
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 5, 2024 · fix by Oct 1, 2024 overdue · Violation #17239843
- BMoldTrace and repair the source and abate the visible mold condition approx 18 sqft at the north wall in the 2nd room from eastIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16900490
- BOther repairsProperly repair with similar material the broken or defective wood floor at underneth the radiator in the 1st room from eastIssued Nov 28, 2023 · fix by Jan 2, 2024 overdue · Violation #16440222
- BOther repairsProperly repair with similar material the broken or defective wood floor at underneth radiator in the 2nd room from eastIssued Nov 28, 2023 · fix by Jan 2, 2024 overdue · Violation #16440223
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sqft at north wall. 4 sqft at east wall. 3 sqft at ceiling and 3 sqft at window…Issued May 30, 2023 · fix by Jul 4, 2023 overdue · Violation #16012134
- CMice or ratsAbate the infestation consisting of rodents rats in the entire apartmentIssued May 18, 2023 · fix by Jun 13, 2023 overdue · rent impairing · Violation #15988168
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 4th room from north at eastIssued May 18, 2023 · fix by Jun 22, 2023 overdue · Violation #15988161
- BOther repairsProperly repair with similar material the broken or defective the ceramic tiles at floor in the bathroomIssued Apr 17, 2023 · fix by May 22, 2023 overdue · Violation #15924257
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and east wall in the bathroomIssued Apr 17, 2023 · fix by May 22, 2023 overdue · Violation #15924254
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.