Housing violations · Norwood
241 East 206 Street, Bronx
10467 · 11 apartments · 5 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks8
- Other repairs5
- Peeling paint and plaster4
- Leaks and water damage4
- Mold2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 15 closed · NYC typical: 87 days
from 15 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361243
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at roof door at 1st public hall bulkhead from north, 5th storyIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361245
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st storyIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19361246
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and north wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · rent impairing · Violation #19361237
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361238
- BOther repairsProperly repair with similar material the broken or defective bulging tiles at south wall in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361239
- COther repairsProperly repair or replace the broken or defective spring balance at upper and lower window sash at east wall in the 3rd room from eastIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19361241
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361242
- BBroken doors or locksProperly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at east wall in the foyerIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19361244
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge at door at 1st public hall bulkhead from north, 5th storyIssued Aug 10, 2026 · fix by Aug 24, 2026 overdue · Violation #19132025
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash causing a guillotine effect at the 1st window from north at east wall in…Issued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19132021
- CBroken doors or locksRemove device preventing door from being self-closing hook and eye installed at bulkhead door at 1st public hall bulkhead from north, 5th storyIssued Aug 10, 2026 · fix by Aug 24, 2026 overdue · Violation #19132028
- CBroken doors or locksProvide unlockable slide bolt or hook installed on door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 5th storyIssued Aug 10, 2026 · fix by Aug 16, 2026 overdue · Violation #19132030
- BOther repairsProperly repair or replace the broken or defective spring balance at upper window sash in the kitchenIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19057706
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule to 1st story public hall , 1st storyIssued Jun 26, 2026 · fix by Jul 10, 2026 overdue · Violation #19030458
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Jun 26, 2026 · fix by Jul 31, 2026 overdue · Violation #19030454
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st storyIssued Jun 25, 2026 · fix by Jul 9, 2026 overdue · Violation #19028841
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from eastIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950028
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18950027
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at window casing at south wall in the 1st room from east at southIssued Dec 18, 2023 · fix by Jan 22, 2024 overdue · Violation #16529933
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Dec 18, 2023 · fix by Jan 22, 2024 overdue · Violation #16529932
- BMoldTrace and repair the source and abate the nuisance consisting of mold at ceiling, north and west wall (approximate 1 square feet) in the bathroomIssued Feb 5, 2020 · fix by Mar 11, 2020 overdue · Violation #12775303
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.