Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Norwood

344 East 209 Street, Bronx

10467 · 32 apartments · 5 stories · City Council district 11

By · Updated · Data from NYC HPD

C
65open immediately hazardous violations · 203 per 100 apartments
B76Hazardous, open
A12Non-hazardous, open
!133Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company344 E 209 LLC
Landlord (head officer or owner)David Tennenbaum

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    49
  2. Lead paint
    19
  3. Peeling paint and plaster
    17
  4. Mice or rats
    15
  5. Broken doors or locks
    14
  6. Leaks and water damage
    12
  7. Roaches
    8
  8. Mold
    5
  9. No heat or hot water
    4
  10. Missing smoke or CO detector
    4
  11. Plumbing, sinks and toilets
    4
  12. Electrical problems
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C80 days
from 170 closed · NYC typical: 87 days
B86 days
from 172 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336941
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical wall outlet at south in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336977
  • C
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the bathroomIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19336954
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at the east entrance door at basementIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19336919
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 30, 2026 · fix by Nov 25, 2026 · rent impairing · Violation #19336939
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19336985
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl floors in the kitchenIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · Violation #19336980
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336938
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336973
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west walls in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336974
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq feet but less than 30 sq feet at the ceiling, south, north, east and west…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336964
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floors in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336955
  • B
    Other repairsProperly repair or replace the broken or defective upper and lower counter balance at the south 1 window in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336969
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19336984
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyerIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19336942
  • C
    Broken doors or locksRemove device preventing door from being self-closing consisting of an area rug at building entrance door , 1st storyIssued Jul 29, 2026 · fix by Aug 12, 2026 overdue · Violation #19106493
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19041125
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyerIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18982939
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of vinyl floor tiles creating a trip hazard in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18982938
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18982852
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage collection area at west yard yardIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18982858
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18822725
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Apr 15, 2026 · fix by May 20, 2026 overdue · Violation #18785551
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, east and south wall in the 2nd room from northIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770206
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at eastIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770207
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 7, 2026 · fix by May 3, 2026 overdue · Violation #18770200
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 7, 2026 · fix by May 3, 2026 overdue · Violation #18770201
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770209
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the kitchenIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18733358
  • B
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the 3rd room from eastIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18733396
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at northIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18733389
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18733359
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 24, 2026 · fix by Mar 22, 2026 overdue · rent impairing · Violation #18733369
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18733356
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18709302
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18709301
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the private hallwayIssued Feb 25, 2026 · fix by Mar 3, 2026 overdue · Violation #18670513
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 25, 2026 · fix by Mar 3, 2026 overdue · Violation #18670512
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18644904
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18644903
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18644905
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 17, 2026 · fix by Mar 15, 2026 overdue · Violation #18644898
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 17, 2026 · fix by Mar 15, 2026 overdue · Violation #18644897
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18631072
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the private hallwayIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18631074
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entire apartmentIssued Feb 9, 2026 · fix by Feb 23, 2026 overdue · Violation #18631067
  • B
    Electrical problems& 309 m/d law abate the nuisance consisting of extention cord from east wall electrical outlet to refrigerator at west wall in the kitchenetteIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18631068
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 20, 2026 · fix by Feb 13, 2026 overdue · Violation #18584258
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 20, 2026 · fix by Feb 13, 2026 overdue · Violation #18584257
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 20, 2026 · fix by Feb 13, 2026 overdue · Violation #18584260
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jan 20, 2026 · fix by Feb 13, 2026 overdue · Violation #18584255
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 20, 2026 · fix by Feb 13, 2026 overdue · Violation #18584256
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18570383
  • B
    Other repairsE) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18570384
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 29, 2025 · fix by Feb 2, 2026 overdue · Violation #18542654
  • C
    Broken doors or locksRemove device preventing door from being self-closing consisting of carpet installed at floor in the foyerIssued Dec 29, 2025 · fix by Jan 12, 2026 overdue · Violation #18542655
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 29, 2025 · fix by Jan 24, 2026 overdue · Violation #18534453
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 29, 2025 · fix by Dec 29, 2025 overdue · rent impairing · Violation #18534456
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 29, 2025 · fix by Feb 2, 2026 overdue · Violation #18542653
  • B
    Other repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18521275

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
112018
62019
402021
42022
1202023
1072024
1872025
1452026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 672 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.